• 제목/요약/키워드: Generator Scheduling

검색결과 82건 처리시간 0.035초

PICNET Network Configurator for Distributed Control System

  • Kim, Dong-Sung;Lee, Jae-Young;Jun, Tae-Soo;Moon, Hong-Ju;Kwon, Wook-Hyun
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 제어로봇시스템학회 1999년도 제14차 학술회의논문집
    • /
    • pp.100-103
    • /
    • 1999
  • In this paper, a method for the efficient implementation of the PICNET network configurator for a distributed control system(DCS) is proposed. The network configurator is composed of the time parameter estimator and the period scheduler, the file generator. The main role of network configurator estimates time parameter, the pre-run time scheduling of the user input and make the period transmission table for operating the PICNET based distributed control system.

  • PDF

지체호를 사용하는 시간 전개형 네트워크의 개발 (Development of Time-Expanded Network using Hold-over Arcs)

  • 이달상;김만식;이영해
    • 산업공학
    • /
    • 제4권2호
    • /
    • pp.25-34
    • /
    • 1991
  • The problem of scheduling the passage things with low transit priority to maximize the amonnt that can be sent during given time periods without interfering with the fixed schedule for passage things with high transit priority in a track, is treated in this paper. The problem is transformed into the Time Expanded Network without traverse time through the Ford and Fulkerson Model and the Enumeration Algorithm is developed for solutions using TENET GENerator(TENETGEN). Finally, the proposed algorithm is compared with Dinic's maximal-flow algorithm and examined for the availability of the procedures on the personal computer.

  • PDF

경제성을 고려한 발전소 예방정비 계획 최적화 방안 연구 (A study of optimal scheduling for generator maintenance considering economics)

  • 장지원;윤용태
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2015년도 제46회 하계학술대회
    • /
    • pp.459-460
    • /
    • 2015
  • 현재의 예방정비계획 운영 방법은 KPX에서 발전 사업자들로부터 희망하는 자신들의 발전기 예방정비계획 일정을 받아서 공급예비력 기준을 만족하면 승인을 해주는 방법으로 진행되고 있다. 이는 경제적인 부분을 예방정비계획 수립에 반영하지 못하고 계통의 신뢰도 측면만을 판단하는 것으로 생각할 수 있다. 따라서 발전비용을 최소화하는 예방정비계획 최적화 모델을 적용하여 예방정비계획 수립 시 경제성을 반영하려 한다. 이를 통해 연발전비용을 낮추면서 연평균 SMP 또한 낮춤으로서 한전과 발전사업자 모두에게 이익을 가져다 줄 수 있는 것이다. 따라서 본 연구에서는 비용 최소화를 목적함수로 하는 tool을 적용한 예방정비계획 최적 값과 기존의 예방정비계획을 공급예비율, 계통한계가격(System Marginal Price, SMP), 발전비용 세 가지로 나눠 비교하고 신뢰도와 경제성을 고려한 최적 예방정비계획을 수립하였다.

  • PDF

퍼지 PI제어기를 이용한 중속 디젤 기관의 속도제어에 관한 연구 (A Study on the Speed Control of Medium Diesel Engine using a Fuzzy-PI Controller)

  • 김영일;천행춘;서인호;유영호
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제24권4호
    • /
    • pp.435-440
    • /
    • 2000
  • The speed control system of diesel engine is considerably nonlinear. Therefore, a countermeasure such as gain scheduling used to be incorporated to compensate this nonlinearity. On the other hand, it is said that fuzzy control is very robust against nonlinearity. But it is difficult to get a satisfactory response with only fuzzy control in real system. In this paper authors design a fuzzy-PI controller for the speed control of Medium diesel engine and carry out experiments with dedicate system implemented by Intel 80916KC to real diesel engine, Deawoo MAN 6Cyl., 1800rpm driving 3$\psi$220V, 150KW generator. We confirm the effectiveness of proposed control system.

  • PDF

송전계통을 고려한 발전기 예방정비계획 방법론에 관한 연구 (Method of Generator Maintenance Scheduling Considering Transmission System)

  • 한석만;신영균;김발호
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 추계학술대회 논문집 전력기술부문
    • /
    • pp.104-106
    • /
    • 2004
  • In competitive electricity markets, the System Operator (SO) coordinates the overall maintenance schedules whenever the collective maintenance schedule reported to SO by Gencos in the pool does not satisfy the specified operating criteria, such as system reliability or supply adequacy. In this paper, we divide maintenance schedule problem into master-problem and sub-problem. Master-problem is schedule coordination and sub-problem is DC-optimal power flow. If sub-problem is infeasible, we use the algorithm of modifying operating criteria of master-problem.

  • PDF

계통보조서비스에서 부하자원의 활용방안에 대한 고찰 (A Study of Demand Response Resource in Ancillary Service)

  • 김성철;유성영;김형준;김형중;박종배;신중린
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2004년도 하계학술대회 논문집 A
    • /
    • pp.663-665
    • /
    • 2004
  • There are some demand response program which is Direct Load Control and so on in Korea. These are used to manage lack of power stability or shift peak time for shading load. It is very important not only using stability power system but controling and scheduling power system on the whole. Interruptible loads are essential resources to solve lack of energy and limit of constructing generator On recently days, Demand Response Program's reliability is recognized as ancillary or reserve service in many country. This paper presents a necessity to apply demand resource to our ancillary program. For this reason, it is introduce overseas ancillary program using load resource.

  • PDF

전력시장 운영 발전계획시스템 개발 (Development of Generation Planning System for Power Market Operation)

  • 최재석;윤용태;차준민;박준형;구본희;오태곤;이상성;백웅기;최현일;박성진
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2011년도 제42회 하계학술대회
    • /
    • pp.364-365
    • /
    • 2011
  • This study develops a new system for generation system simulation and operational planning (namely, KPWR-X) including GMS(Generator Maintenance Scheduling), UC(Unit Commitment), and LF(Load Forecasting) for new power system environment in recent. The KPWR-X provides operator and planner to help the generation system more safely and economically. GUI developed in this study makes operator feel in convenient to control whole power system. In future, it is expected that generation company, ISO, and fuel procurement, etc. may use an instructional tool developer's suggestion for application. It will be also applicable to establish the operational strategies for generation control, fuel procurement and power system risk management.

  • PDF

발전기 보수정지를 고려한 확률적 발전모델링 (Modeling Generators Maintenance Outage Based on the Probabilistic Method)

  • 김진호;박종배;박종근
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2005년도 제36회 하계학술대회 논문집 A
    • /
    • pp.804-806
    • /
    • 2005
  • In this paper, a new probabilistic generation modeling method which can address the characteristics of changed electricity industry is proposed. The major contribution of this paper can be captured in the development of a probabilistic generation modeling considering generator maintenance outage and in the classification of market demand into multiple demand clusters for the applications to electricity markets. Conventional forced outage rates of generators are conceptually combined with maintenance outage of generators and, consequently, effective outage rates of generators are new iy defined in order to properly address the probabilistic characteristic of generation in electricity markets. Then, original market demands are classified into several distinct demand clusters, which are defined by the effective outage rates of generators and by the inherent characteristic of the original demand. We have found that generators have different effective outage rates values at each classified demand cluster, depending on the market situation. From this, therefore, it can be seen that electricity markets can also be classified into several groups which show similar patterns and that the fundamental characteristics of power systems can be more efficiently analyzed in electricity markets perspectives, for this classification can be widely applicable to other technical problems in power systems such as generation scheduling, power flow analysis, price forecasts, and so on.

  • PDF

NREL 5MW 풍력터빈의 제어시스템 설계 (Control System Design of NREL 5MW Wind Turbine)

  • 남윤수;임창희
    • 한국태양에너지학회 논문집
    • /
    • 제32권5호
    • /
    • pp.31-40
    • /
    • 2012
  • This paper introduces a methodology for NREL 5MW wind turbine, which is the variable speed and variable pitch(VSVP) control system. This control strategy maximizes the power extraction capability from the wind in the low wind speed region and regulates the wind turbine power as the rated one for the high wind speed region. Also, pitch control efficiency is raised by using pitch scheduling.Torque schedule is made of torque table depending on the rotor speed. Torque control is used for vertical region in a torque-rotor speed chart. In addition to these, mechanical loads reduction using a drive train damper and exclusion zone on a torque schedule is tried. The NREL 5MW wind turbine control strategy is comprised by the generator torque and blade pitch control. Finally, proposed control system is verified through GH Bladed simulation.

기술논문 : KSR-Ⅲ 비행안전 시스템 구현 (Technical Papers : Implementaion of KSR-3 Range Safety System)

  • 김주년;고정환;이재득;박정주
    • 한국항공우주학회지
    • /
    • 제30권1호
    • /
    • pp.147-154
    • /
    • 2002
  • 발사체의 발사 시험과 운용에 있어, 예기치 못한 로켓의 오작동으로 인한 인명과 재산의 피해를 예방 또는 최소화하기 위하여 비행안전 시스템은 매우 중요한 역할을 한다. KSR-Ⅲ 발사시 처음으로 운용될 비행안전 시스템은 비행안전 디스플레이 시스템과 비행종단 시스템으로 나뉘어진다. 발사 후 비행중인 로켓의 여러 비행상태와 예상낙하점등은 실시간으로 디스플레이 시스템을 통하여 관찰되며, 로켓이 안전영역을 벗어나거나 로켓의 추적이 불가능하게 될 경우 비행종단시스템은 로켓의 비행을 즉시 중단시키는 역할을 한다. 본 논문에서는 비행안전 시스템 구현에 관하여 수행된 실시간 비행안전 디스플레이 시스템과 비행종단시스템의 개발에 관하여 기술하고 있다.