The Journal of Korean Institute of Electromagnetic Engineering and Science
/
v.9
no.4
/
pp.552-559
/
1998
Conducted noise in power line contains both the common mode(CM) and differential mode(DM) noise. These two modes of noise are caused by different noise sources and paths. Therefore, CM/DM noise must be deal with individually in EMI filter. In this paper the technique to separate power line noise is presented, which can be used to measure both the CM and the DM noise from total generated noise. Also, noise-separator is designed and experimental results showed 30 dB above of separation performance in 10 kHz~10 MHz.
Yun, Sung Wook;Choi, Man Kwon;Kim, Hyeon Tae;Yoon, Yong Cheol
Journal of Bio-Environment Control
/
v.22
no.3
/
pp.220-227
/
2013
This study examined the electric power quantity derived from solar radiation after installing a photovoltaic power generation system on the rooftop of building adjacent to a greenhouse with a view to reducing the operating expenses of the greenhouse by securing electric energy required to run it. Results of the study can be summed up as follows: The maximum, mean, and minimum solar radiation on the horizontal plane was $26.1MJ{\cdot}m^{-2}$, $14,0MJ{\cdot}m^{-2}$, and $0.6MJ{\cdot}m^{-2}$, respectively and individual the daily electric energy generated was about 6.1 kWh, 3.7 kWh, and 0.01 kWh. The cumulative total amounts of solar radiation and electric energy was about $4,378.2MJ{\cdot}m^{-2}$ and 1,163.2 kWh, respectively. Maximum, mean and minimum cumulative electric energy consumed through each load respectively was 4.5 kWh, 2.4 kWh, and 0.0 kWh and the cumulative electric energy were 739.2 kWh, which accounted for about 63.5% of generated power. In case of the mean amount of power consumption of the system used for this study, the small capacity of heater and the short operating hours meant there was enough power; while big capacity of heater led to a shortage, and if the array surface temperature increased relatively, the energy became proportionate to solar radiation and generated power does not increase. The correlation coefficient between the two factors was 0.851, which indicates a high correlation coefficient.
The Transactions of the Korean Institute of Power Electronics
/
v.22
no.1
/
pp.9-17
/
2017
A parallel control algorithm of thyristor dual-converter power system for the DC power supply of railway is proposed. The circulating current and current imbalance generated during parallel operation can be limited to control the output voltage of each power system by using the proposed parallel control algorithm. The proposed control algorithm can also eliminate output current sensor to achieve the same output response without additional costs. The validity of the proposed algorithm is verified through simulation and experiment.
Journal of Korea Society of Digital Industry and Information Management
/
v.5
no.3
/
pp.69-75
/
2009
In this paper, we proposed CPLD low power algorithm using reduce glitch power consumption. Proposed algorithm generated a feasible cluster by circuit partition considering the CLB condition within CPLD. Glitch removal process using delay buffer insertion method for feasible cluster. Also, glitch removal process using same method between feasible clusters. The proposed method is examined by using benchmarks in SIS, it compared power consumption to a CLB-based CPLD low power technology mapping algorithm for trade-off and a low power circuit design using selective glitch removal method. The experiments results show reduction in the power consumption by 15% comparing with that of and 6% comparing with that of.
Park, Sung-Woo;Park, Hee-Sung;Jang, Jin-Baek;Jang, Sung-Soo
Proceedings of the KIEE Conference
/
2005.07b
/
pp.1438-1440
/
2005
A power control and distribution unit(PCDU) plays roles of protection of battery against overcharge by active control of solar array generated power, distribution of unregulated electrical power via controlled outlets to bus and instrument units, distribution of regulated electrical power to selected bus and instrument units, and provision of status monitoring and telecommand interface allowing the system and ground operate the power system, evaluate its performance and initiate appropriate countermeasures in case of abnormal conditions. In this work, we perform the preliminary design of a PCDU scheme for the small LEO Satellite applications. The main constitutes of the PCDU are the battery interface module, the auxiliary supply modules, solar array regulators with maximum power point tracking(MPPT) technology, heater power distribution modules, internal converter modules for regulated bus voltage generation. and instrument power distribution modules.
Journal of the Korean Society for Precision Engineering
/
v.25
no.11
/
pp.107-118
/
2008
In this study, lower extremity joint kinematics and kinetics and lumbar lordosis were investigated for two different symmetrical lifting techniques(squat and stoop) using the three-dimensional motion analysis. Twenty-six male volunteers lifted boxes weighing 5, 10 and 15kg by both squat and stoop lifting techniques. There were not significant differences in maximum lumbar joint moments between the two techniques. The hip and ankle contributed the most part of the support moments during squat lifting, and the knee flexion moment played an important role in stoop lifting. The hip, ankle and lumbar joints generated power and only the khee joint absorbed power in the squat lifting. The knee and ankle joints absorbed power, the hip and lumbar joints generated power in the stoop lifting. The bi-articular antagonist muscles' co-contraction around the knee joint during the squat lifting and the eccentric co-contraction of the gastrocnemius and semitendinosus were found to be important for straightening up during the stoop lifting. At the time of lordotic curvature appearance in the squat lifting, there were significant correlations in all three lower extremity joint moments with the lumbar joint. Differently, only the hip moment had significant correlation with the lumbar joint in the stoop lifting. In conclusion, the knee extension which is prominent kinematics during the squat tilling was produced by the contributions of the kinetic factors from the hip and ankle joints(extensor moment and power generation) and the lumbar extension which is prominent kinematics during the stoop lifting could be produced by the contributions of the knee joint kinetic factors(flexor moment, power absorption, bi-articular muscle function).
Photovoltaic power generation systems make up a large part of the low carbon energy trend. The purpose of this study is to utilize PVsyst, a commercial forecasting program, to forecast research on the design stages of photovoltaic power generation for wider applications of this system in railroads and to consider prospective issues for photovoltaic power plants that are currently being operated. Given this, we will compare the forecast value of generated photovoltaic power, derived from foreign weather forecast information provided by NASA, along with information from Meteonorm, and the forecast values derived from the KMA weather information. By comparing these values with amounts actually generated by KPX, this research aims to secure propriety rights for wider application of photovoltaic power generation systems in railroads, and to contribute to low carbon energy for the new climate of the future.
The back-to-back HVDC asynchronous grid interconnect technology has problems of high harmonic generation, high cost, and low scalability. To solve this problem, research on asynchronous grid interconnect technology using VFT is actively being conducted. However, the reactive power due to the inductance component of the VFT is generated, and the problem of additional installation of the reactive power compensating facility is inevitably generated. Therefore, in this paper, we aim to solve the reactive power compensation problem of existing VFT by designing rectifier AC-DC converter, which is an essential element of the asynchronous grid connection system using VFT, to compensate reactive power as well as active power supply. The performance was verified through simulation.
The Transactions of The Korean Institute of Electrical Engineers
/
v.56
no.3
/
pp.547-555
/
2007
In order to transmit energy generated through the stator winding of a doubly-fed induction generator (DFIG), we need to synchronize the generated voltage vector with the grid voltage vector. However, the existing synchronization methods work only when the encoder is installed at a specific position and equivalent constant is precise. In order to solve this problem, a new synchronization method has been proposed and a way of applying the method to existing doubly-fed induction generator control algorithm has been also proposed. The validities of the methods proposed were verified by using a prototype converter for a 1.5MW-class doubly-fed induction generator and experimental results showed the validity of that against variation of an encoder positions, generator parameters, and grid voltages.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.25
no.4
/
pp.65-70
/
2011
Perfluorocompounds (PFCs) gases were decomposed by gliding arc plasma generated by AC pulse power. $N_2$ gas of 10 LPM flow rate and $H_2$ gas of 0.5 LPM were introduced into the gliding arc plasma generated between a pair of electrodes with SUS 303 material, and the PFCs gases were injected in the plasma and thereby were decomposed. The PFCs gas-decomposition-characteristics through the gliding arc plasma were analyzed by FT-IR, where pure $N_2$ and $H_2$-added $N_2$ environment were used to generate the gliding arc plasma. The PFCs gas-decomposition-properties were changed by electric power for gliding arc plasma generation and the H2 gas addition was effective to enhance the PFCs decomposition rate.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.