Proceedings of the Korean Institute Of Construction Engineering and Management
/
autumn
/
pp.359-364
/
2003
The loss of potential opportunity profit which is consisting in the partial markups of the corporation would taking placed in related with the time-delay deeply, has customarily disregarded in contract adjustment under the principles of denial of cost accounting method, declined conjecture in the point of benefits and protection of the law in scope of compensation and the restricted conditions of constant contract. It is being resulted from that the policies of the general principles of accounting standards which is subjected to ask an objective data and evidence, and the denial system as a debt derived from imperfect legal theory applied by current law. Therefore, it is necessitated to find if any irrationality in the positive system is and further to draw an improved reasonable measures to adopt by review of constant system preparing tile reasonableness with the method of suitable quantification devices provided that any time-delay is induced by the party.
Korean Journal of Construction Engineering and Management
/
v.18
no.6
/
pp.65-77
/
2017
Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.
We have performed the calculation of total radiances for the KOMPSAT-2 Multispectral Camera (MSC) using a radiative transfer model of MODTRAN and examined its results. To simulate four seasonal conditions in the model calculation, we used model atmospheres of mid-latitude winter and summer for calculations of January 15 and July 15, and US standard for April 15 and October 15, respectively. Orbital parameters of KOMPSAT-2 and the seasonal solar zenith angles were taken into account. We assumed that the meteorological range is the tropospheric aerosol extinction of 50 km and surface albedo is the global average of clear-sky albedo of 0.135. MSC contract values are found to be considerably greater in the MSC spectral range than the total radiances calculated with the above general conditions. It is also shown that the spectral behavior of model results with the constant surface albedo differs from the pattern of MSC contract values. From these results, it can be inferred that the forthcoming MSC images would be somewhat dark.
International conference on construction engineering and project management
/
2005.10a
/
pp.705-708
/
2005
In the case that construcion period is delayed because of the force majeure such as a typhoon or a flood, the owners in general should compensate the damages caused by those. But with exception the weather worsening of ordinary level is paid by contractors, while that of exceptional level by the owners. It is critical that it is difficult to distinguish objectively between ordinary and exceptional level weather worsening. Although the term of "ordinary" itself is too abstractive, we can reduce the disputes between owners and contractors by setting the appropriate and objective standard of distinction. For example in the case of rainfall it may be the standard of distinction whether the days of actual rainfall exceed those of average rainfall or not. If the days of actual rainfall don't exceed those of average rainfall contracters should pay the damages because it is distinguished with a ordinary level weather worsening. Besides the standard of distinction in another weather worsening such as severe cold/hot, strong wind etc. which have a effect on delaying the term of works could be settled as a similar model.
Purpose: This study aims to identify general, workplace, and health-related characteristics of outdoor workers exposed to high temperatures, and to compare the risk of disease according to outdoor high temperature exposure. Methods: This secondary analysis study used the 5th Korean Working Conditions Survey (2017) to identify 4,915 outdoor workers exposed to high temperatures. Results: Outdoor workers exposed to high temperatures were mostly male, elderly, less educated, and daily contract workers. Most of them were engaged in agriculture, forestry and fishing, and construction industries. About 40~50% of them complained of musculoskeletal pain and overall fatigue. The results showed that high temperature exposure increased the risk of illness (hearing problem, skin problem, backache, muscular pains in upper and lower limbs, headache/eyestrain, injuries, depression, and overall fatigue) among workers. Conclusion: High temperature exposure might increase the risk of illness among workers. The results of this study demonstrated that the outdoor workers should be protected from high temperatures.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.28
no.6
/
pp.85-90
/
2014
This paper shows a reasonable demand power, that was made by the systematic and statistical way considering actual conditions, such as investigated transformer capacity and peak power for the last 6 years of subway substation customer as to AMR. In this dissertation, it is necessary to analyze the key features and general trend from the investigated data. It made an analysis of the feature parameters, such as average, standard deviation, median, maximum, minimum and thus it was carried by the linear and nonlinear regression analysis. And we studied on the application of a BESS. Analysis showed that the revulsion of capital is about 3 years and 4 months.
Journal of the Korean Institute of Landscape Architecture
/
v.28
no.4
/
pp.105-116
/
2000
The purpose of this paper is to minimize differences between landscape detailed design (hereafter 'design') and final landscape construction products in working sites (hereafter 'products'). Ten landscape sites constructed in recent two years were selected to examine the differences. Differences in quantities and quality between design and products were surveyed and the results were analyzed with the 'differential analysis method'. The method employed in this paper can be used as an optimization model to minimize the differences between design and products. This paper suggests that every landscape field should mark less than 13.672% calculated from the 10% of total amount for excellent construction products. This should be approved by the president, according to the Clause 20 of General Conditions of the Contract, divided by the ratio of quantities affecting mainly he average Difference in Value between Design and Construction(DVDC). This value can be the critical point from the differential analysis method for the optimal maximum DVDC between landscape design and final landscape construction products in fields.
Proceedings of the Korea Association of Information Systems Conference
/
2000.11a
/
pp.26-31
/
2000
It is said that the focus of managing venture business is currently moving from technology competition to management competition. By the way, the software venture business(SVB) has some weak points in its structural composition and itematization and no professional personnel in other several sections except technology development section. In addition, such basic functions as technology and R & D, finance and accounting, marketing required to the management of business are concentrated on only one man, its representative director. Therefore, this study aims to provide the basic data useful to the establishment of governmental policy in information and communication, to the rearing of the SVB by a local government related to the software, and to the administration of SVB by investigating the actual conditions. This study attempts to examine the literature on venture business and software industry, and its management with a questionnaire about the actual conditions of managing the SVB. The questionnaire is given to 527 local enterprises belonging to the Software Industry Association and to 171 enterprises in the Software Center. This study compromises the characteristics of the SVB, the actual conditions of its technology and R & D, finance and accounting, and marketing. The characteristics of the SVB are classified into categories such as the stage of its growth(the stage of its seed and start-up, the stage of tis development and growth, the stage of its stability and maturity) and the main business(the system integration, the software development for contract, the package software development service, the software-related service). Additionally, the study attempts to analyze positively the actual condition of its management after classified by the areas of business profile, its general management, its technology development, its finance and accounting, and its marketing The result of this study is found that the SVB has a lot of troubles in part of marketing and finance & accounting activity as well as general management. The SVB realizes the importance of the technology development rather than that of management activity including marketing activity. So we expect this study can assist the SVB to establish the business guidelines for own management plans.
Proceedings of the Korean Institute Of Construction Engineering and Management
/
2004.11a
/
pp.629-633
/
2004
The number of claims and disputes among project participants has been steadily increasing last a few years and it creates numerous conflicts and problems in the domestic construction industry. One of the root causes of claims and disputes can be explained by the fact that project objectives of participants are offer different and not aligned. This research is considered as a pre-study of developing a strategy to mitigate conflicts such as claims and disputes in the domestic construction industry by utilizing Alternative Dispute Resolution (ADR) techniques. This research focused on improving standard contrast documents to establish a systematic dispute resolution process which emphasize the ADR method. To do so, several well-recognized contract documents developed by FIDIC, AIA, ECC were throughly investigated and analyzed using a benchmarking process. Result of the research propose needs of improving the domestic construction document's some clauses and the details will be further Investigated through surveys and expert's opinions.
Todays, L/C transactions in international trade are governed by UCP 500 and eUCP. But UCP 500 and eUCP do not cover all legal problem of L/C transactions. Therefore choice of laws in international L/C transactions are occurred. U.S.A. has an enacted law (UCC ${\S}5-Letter$ of Credit) to govern L/C transaction. But other countries has no special enacted law to govern L/C transaction. The reason is that there are difference between legal attitude of U.S.A. and other countries. American law considers L/C as a special device made by merchants. Therefore U.S.A. applies UCC ${\S}5-Letter$ of Credit instead of general contract law. UCC ${\S}5-Letter$ of Credit includes provisions of warranties, remedies, and so on that UCP 500 and eUCP do not include. But the liabilities of the Issuing Bank on the wrongful dishonor in L/C transaction is very important legal problem. First, this study is to justify concepts of honor and dishonor, and sufficient conditions for dishonor of the issuing bank. in UCC. Second, this study is to examine closely the liabilities of the Issuing Bank on the wrongful dishonor in L/C transaction. Third, this study is suggest distinctive features on the Liabilities to wrongful dishonor of the issuing bank in UCC ${\S}5-Letter$ of Credit and our trader's matters to be attended to L/C transactions governed by UCC.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.