The Transactions of the Korean Institute of Electrical Engineers C
/
v.54
no.7
/
pp.319-325
/
2005
In order to analyze ground potential rise of grounding system installed in buildings, the hemispherical grounding simulation system has been designed and fabricated as substantial and economical measures. Ground potential rise(GPR) has been measured and analyzed for shapes of grounding electrode using the system in real time. The system is apparatus to have a free reduced scale for conductor size and laying depth of a full scale grounding system and is constructed so that a shape of equipotential surface is nearly identified a free reduced scale with a real scale when a current flows through grounding electrode. The system was composed of a hemispherical water tank, AC Power supply, a movable potentiometer, and test grounding electrodes. The test grounding electrodes were fabricated through reducing grounding electrode installed in real buildings such as rod type, mesh grid type. When a mesh grid type was associated with a rod type, GPR was the lowest value. The proposed results would be applicable to evaluate GPR in the grounding systems. and the analytical data can be used 0 stabilize the electrical installations and prevent the electrical disasters.
The Transactions of the Korean Institute of Electrical Engineers C
/
v.53
no.3
/
pp.162-167
/
2004
The scale model grounding systems to study the behavior of grounding system in uniform soils have been designed and fabricated. Constructional details and instrumentation have been discussed. To verify the accuracy of the results obtained from the experimental tests, they have been compared with computer calculation results. Also, in order to assess the effectiveness of bonding two grounding systems, grounding grid conductors which were downsized as a scale factor of 100:1 were analyzed by using the scale model method. A profile of GPR(Grounding Potential Rise) of each case was measured. The scale model grounding system presented in this paper can be valuable tool to analyze the ground potential profile and ground resistance of practical grounding system.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2002.11a
/
pp.303-306
/
2002
This paper presents a novel method for measuring the ground impedance in grounding systems. A square wave current was injected to the main grounding grid through auxiliary electrode, and the test current and ground potential rise(GPR) were measured using the band-pass filter. Ground impedance was calculated from the sinusoidal waveforms of the test current and GPR in frequency range of 20~2100Hz. Also the resistance and reactance component of ground impedance were analyzed.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.16
no.4
/
pp.117-123
/
2002
Measurement of ground resistance is the basic and important procedure to evaluate the proriety of grounding systems performance. In the field, however, it is not an easy task to measure ground resistance accurately, because locating a right position of zero potential for accurate GPR(Ground Potential Rise) measurement is very difficult, especially in case of a grounding electrode with large dimension. In this paper, the estimation method of ground resistance by analysing earth surface potential distribution around the grounding electrodes has been described.
The Transactions of The Korean Institute of Electrical Engineers
/
v.58
no.1
/
pp.113-118
/
2009
Grounding systems set the reference voltage level of electric circuits and suppress the Ground Potential Rise (GPR) by flowing fault currents to the ground safely. There are several parameters which evaluate the performance of grounding systems as ground resistance, touch voltage and step voltage. The touch and step voltages, which is called "risk voltage", are especially important to ensure the safety of human body. This paper dealt with the influence of current sources with the different frequency components on the touch and the step voltages. Three types of current sources as commercial frequency, square wave, and surge with the fast risetime of $50\;ns{\sim}500\;ns$ were used to analyze the risk voltages in a grounding system. The risk voltages showed remarkable difference in the same current amplitude depending on the current sources, and increased linearly with the current amplitude in the same current source. From the experimental results, it was confirmed that the risk voltages can be evaluated by a small current application in large-scale grounding systems and the possible largest risk voltage can be calculated by a surge current with the risetime of 200 ns or a current source with the same frequency component as the surge current.
Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
/
2004.11a
/
pp.241-245
/
2004
The electric safety tends to be more important according to electric facilities's increase and its use in these days. This paper analyzes soil resistivity of two areas in the country using CDEGS(Current Distribution, Electromagnetic Interference, Grounding and Soil Structure, Canada). We designed rod and mesh grounding system and made a comparative study of ground resistance, GPR(Main Electrode Potential Rin), step voltage and touch voltage. Then we could analyz only the safety but also economical efficiency in elocution of grounding. As a result of simulation, ground resistance, GPR(Main Electrode Potential Rise), step voltage and touch voltage became higher in proportion to soil resistivity. Therefore we expect to estimate the propriety of grounding system design through accumulation and analysis of data in consideration of characteristics of soil.
The object of grounding of electrical facility is to protect human and machine damage from the power supply interruption high voltage by use of the accident current dissipating into the ground. Generally, it is not easy to make suitable ground design for inhomogeneous subsurface geology and the variability of accident current in magnitude and duration time. To make efficient ground, ground potential rise must be controlled in the way of overall lowering and evenness. This study shows the case of optimized
ground design by use of subsurface resistivity structure from electrical soundings.
The Transactions of the Korean Institute of Electrical Engineers P
/
v.57
no.4
/
pp.444-450
/
2008
There are several ways to bond to building grounding systems for reducing GPR(ground potential rise) and EMI resulting from power system faults or lightning stroke to building. In order to verify effective bonding practice, the GPR and voltage of equipment due to the direct stroke to building are calculated with ATP-EMTP model for transformer, transmission line and MOV(Metal oxide varistor). The simulated model shows a satisfactory accuracy compared with experimental result for the $8/20{\mu}s$ simulated current pulse. It is observed that separate grounding can cause dangerous voltage to the building equipment and the performance of surge protective device can improve when it is installed to the protected equipment in distance as short as possible.
Kim, Hwang-Kuk;Moon, Byung-Doo;Park, Dae-Won;Kil, Gyung-Suk;Han, Ju-Seop
Proceedings of the KSR Conference
/
2008.06a
/
pp.311-315
/
2008
Ground systems set the reference voltage level of circuit and system, and suppress Ground Potential Rise (GPR) by flowing fault currents to ground safely. There are several parameters which evaluate the performance of ground systems as ground resistance, touch voltage and step voltage. The touch and step voltages are especially important to ensure safety of human body. In this paper, we measured the touch and step voltages by injection of power frequency and surge current. Also correlation between touch and step voltages is compared and analyzed for the same ground systems.
Grounding rods as a discharge path are normally used to ensure the safety of human beings and facilities from the over-voltages and the over·current. Each grounding mode class 1, class 2, class 3, special class 4- has prescribed ground resistance values which are kept by the utilities. However, in the distribution system, it is very difficult for grounding rods to obtain the prescribed ground resistance values because of the limits of installation space. Therefore, in this paper, the grounding effects of the grounding copper bands which are recently developed to use efficiently in small area and the grounding rods are compared by testing the ground resistance values, ground potential rise(GPR), and step voltage in various cases.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.