The mechanism of ballast-flying phenomena by strong wind induced by high-speed trains has extensively been investigated by conducting wind tunnel test and field-measuring of wind velocity in the vicinity of the track. The ballast gathered from the Seoul-Busan high-speed railway track has been classified by mass and shape to find relationship between those properties and the characteristic of movement in high wind and 16-channel Kiel-probe array has been used to examine the detailed flow structure above the surface of the track. The probability of ballast-flying during the passage of the high-speed train has been assessed comparing the results from wind tunnel test and that from field-measuring. The results shows that when the G7 train runs well as the KTX train runs at 300km/h, about 25m/s wind gust is induced just above the tie and the probability far small ballast under 50g to fly is about 50% when it is on the tie. If the G7 train runs at 350km/h, the wind gust just above the tie increases to 30m/s, therefore radical countermeasure seems to be needed.
This report was studied about speed-up for main line of KNR(Korea National Railroad) by High Speed Train. The maximum speed of Kyun-Pu line was recorded a 140km/h by Saemaul train in 1985 and the average speed its is a 107km/h now. For operation KTX Kyun-Pu High Speed Train and G7 Korea High Speed Train in KNR line, this report was studied about operation status of High Speed Train in advanced countries, operation situation of train in KNR line and plan of speed-up for main line.
This paper shows the results of train system engineering technology and exterior and interior design of a prototype test train(HSR 350X) which was developed in R&D project titled 'Development of High Speed Railway Technology'. The prototype test train, which has two power cars, two motorized trailers and three trailers, is now being tested on high speed line.
A study on Technical Specifications of the current collection system in G7 Korean High Speed Train Project is performed in this paper. First, an appropriate level of contact wire tension for 350km/h commercial operation is proposed based on the foreign high speed train operation experiences and a relevant technical criterion, Second, two optimized design specifications of the pantograph for G7 Korean High Speed Train are proposed based on current collection quality. In order to perform design optimization, a formulation on the follow-up characteristics of a pantograph with 3 levels of masse-spring-damper is derived in this paper. Dynamic design parameters of the pantograph are adjusted to maximize follow-up capability at the dropper and span passing frequencies.
Kim, Dong-Hyeon;Kwon, Hyeok-Bin;Kim, Do-Hoon;Kim, Moon-Hun;Song, Moon-Shuk
Transactions of the Korean Society of Mechanical Engineers B
/
v.28
no.6
/
pp.734-739
/
2004
The aerodynamic effect on platform during the train passage, the results of field test on the high-speed railway platform are discussed and the whole test results and conclusions are synthesized. The field test for the high-speed railway have been conducted on the Osong temporary platform in the newly constructed Seoul-Busan high-speed line and total 12 measurements have been conducted for G7 train and KTX train. The results shows that the high-speed trains have similar aerodynamic characteristics and have far better characteristics referring to the conventional trains such as Saemaul and Mugungwha trains. To discuss the actual aerodynamic effects on the platform at its own operational speed, Beaufort wind scale have been introduced and the criteria for the safety on railway platform has also been discussed.
A numerical simulation has been performed to estimate the transient pressure variation in the tunnel when G7 test train passes through the test tunnel in the Kyoeng-Bu high-speed railway. A modified patched grid scheme is developed to handle the relative motion between a train and a tunnel. Also, a hybrid dimensional approach is proposed to calculate the train-tunnel interaction problem efficiently. An axi-symmetric unsteady Euler solve using the Roe's FDS is used for analyzing a complicated pressure field in tunnel during the test train is passing through the tunnel. Usually, this complex phenomenon depends ell the train speed, train length, tunnel length, blockage ratio between train and tunnel cross-sectional area, relative position between train and tunnel, etc. Therefore, numerical simulation should be done carefully in consideration of these factors. Numerical results in this study would be good guidance to make test plans, test equipments selection and to decide their measuring locations. They will also supply important information to the pressurization equipment for high-speed train.
The dynamic behavior of high speed train is very important because of its safety and passengers' ride comfort. The railway vehicle is composed of many suspension components, such as 1st springs, 1st dampers, 2nd springs and 2nd dampers, that have an influence on the dynamic characteristics of high speed train. Also, the wheel/rail shapes and the track geometry affect the dynamic behavior of high speed train. This paper reviews the dynamic behavior of KHST in the KTX test line. The VAMPIRE program is used for this simulation. The simulation results are within the limits of safety criteria. Thus the KHST can operate safely at 350 km/h in the KTX test line.
This paper introduces the outline of the ongoing G-7 project for the development of vibration and noise analysis and reduction technology for the Korea High Speed Train which will run at 350km/h. Extensively collected materials and data on the vibration and noise characteristics of high speed trains are summarized herein to reduce the research direction.
Proceedings of the Korean Society of Precision Engineering Conference
/
2005.06a
/
pp.369-373
/
2005
To investigate the mechanism of ballast-flying phenomena by strong wind induced by high-speed trains, wind velocity in the vicinity of the track has been measured using 16-channel Kiel-probe array and detailed flow structure near the surface of the track has been analyzed. The position at which the underflow fully develop has been examined in order to assess the driving force of the turbulent flow under train and the results yields that the turbulent flow owing to the cavity of the inter-car as well as the friction force at the underbody of the train is the main reason of the strong wind under high-speed train. The preceding wind tunnel test results has been introduced to assess the probability of ballast-flying during the passage of the high-speed train by comparing the results from field-measuring. The results shows that when the G7 train as well as the KTX train runs at 300km/h, about 25m/s wind gust is induced just above the tie and the probability for small ballast under 50g to fly is about 50% when it is on the tie. If the G7 train runs at 350km/h, the wind gust just above the tie increases to 30m/s, therefore more radical countermeasure seems to be needed.
By the result of efforts for the technology development of G7 trainset, the technology of domestic high-speed train KTX-II has lately been put to practical use while a forward countries of railway, which have their own developing ability of high-speed train, are competing against each other for the development of faster high-speed train system. Japan has been commissioning of FASTECH 360 which was developed in June 2005. Also France and Germany have been commissioning of next generation high-speed train such as AGV and ICE-3, developed basing on technology of their existing high-speed train system(TGV and ICE), its maximum commercial running speed is 360kph, and adopted multiple unit system. For the development of technology of domestic high-speed train and enhancement of national technology competitive power, HEMU (High-speed Electrical Multiple Unit) development project has been carried out as a national R&D project from last August. For the executing of HEMU's maximum speed test, we have investigated the high speed line characteristics (i.e. radius of curvature, gradient, cant etc.) of Seoul-Pusan line and Honam line which is under construction. We'd like to examine a study of condition for the best HEMU T&C line considering HEMU's characteristics (i.e. acceleration, deceleration etc.) and its interface with infrastructure in this paper.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.