In this paper, a three phase cycloconverter type high frequency AC link inverter is discussed. The configuration consists of a high frequency full-bridge inverter and a high frequency transformer followed by a three phase cycloconverter whose switch is composed of anti-series connected MOSFETs with a common source. A simple digital control strategy based on space vector modulation (SVM) and repetitive control for the cycloconverter is proposed although its input voltage is a high frequency AC pulse. The operation principle of the proposed control strategy is analyzed and the equivalent working modes during one interval are also presented. The effectiveness of the proposed control strategy is verified through Matlab/Simulink simulations and experiments on a 1.45kW prototype.
D-STATCON using the multilevel voltage source inverters is presented for voltage regulation and reactive power compensation in distribution system. This cascade M-level inverter consists of (M-1)/2 single phase full bridge inverter(FBI). This multilevel inverter is a natural fit to the flexible ac transmission systems(FACTS) including STATCON, SVC, series compensation and phase shifting, It can solve the problems of conventional transformer-based multipulse inverters and multilevel diode-clamped inverters. From the simulation results, the superiority of D-STATCON with cascade multilevel inverter is shown for high power application.
LCD Backlight 구동 응용을 위한 새로운 인버터 회로 Topology인 Dual Active Clamp Forward (ACF) Inverter를 제안한다. 제안된 회로는 LCD의 광원 역할을 하는 냉음극 형광램프(Cold Cathode Fluorescent Lamp, CCFL) 구동을 위한 회로로서, 넓은 입력 범위 및 부하 범위에서도 영 전압 스위칭 동작을 보장하며, 출력 AC 전류의 대칭성을 보장한다. 더욱이 기존 Symmetric Phase Shift Full Bridge방식은 특허 우선순위가 있는 방법으로써, Dual ACF Inverter를 사용할 경우 특허 Royalty 부담을 줄일 수 있다. 본 논문에서는 제안된 회로의 동작원리에 대한 타당성을 이론적 분석 및 모의실험을 통하여 검증한다.
태양광발전 및 소단위 풍력발전에 사용할 수 있는 변압기 없는 인버터를 설계하였다. 멀티 스위칭 방법에 의한 승압쵸퍼회로와 단상 풀브리지 인버터로 구성하였으며 소형화, 저 비용화를 위하여 변압기 없는 방식으로 설계하였다. 변압기 없는 시스템에서 문제가 될 수 있는 접지누설전류의 저감을 위해서는 승압쵸퍼의 스위칭기법 및 인버터 스위칭 등을 통하여 해결하였다
To drive a magnetron injection gun, thsi paper decribes a design, fabrication and analysis results of proposed compact capacitor charging power supply (CCPS) formed resonant full-bridge inverter for electron gun power supply (EGPS). EGPS needs the -40 kV output voltage and 280 kW output power for few seconds continuously and have to be designed for the rise and fall time to be less than 1 ms with the ripple stability of output voltage of lower than 1%. In order to meet the requirements, we used eight resonant full-bridge modules operated in parallel. Each resonant full-bridge module can supply the current of 0.9 A and the voltage of 40 kV, and is operated by N-phase shift switching pattern. In this paper, we present the design, simulation and test results of interleaved CCPS.
A high-voltage power supply has been built for activation of the brain via stimulation using a Full Wave Cockroft-Walton Circuit (FWCW). A resonant half-bridge inverter was applied (with half plus/half minus DC voltage) through a bidirectional power transistor to a magnetic stimulation device with the capability of producing a variety of pulse forms. The energy obtained from the previous stage runs the transformer and FW-CW, and the current pulse coming from the pulse-forming circuit is transmitted to a stimulation coil device. In addition, the residual energy in each circuit will again generate stimulation pulses through the transformer. In particular, the bidirectional device modifies the control mode of the stimulation coil to which the current that exceeds the rated current is applied, consequently controlling the output voltage as a constant current mode. Since a serial resonant half-bridge has less switching loss and is able to reduce parasitic capacitance, a device, which can simultaneously change the charging voltage of the energy-storage condenser and the pulse repetition rate, could be implemented. Image processing of the brain activity was implemented using a graphical user interface (GUI) through a data mining technique (data mining) after measuring the vital signs separated from the frequencies of EEG and ECG spectra obtained from the pulse stimulation using a 90S8535 chip (AMTEL Corporation).
본 연구는 60Hz 절연변압기가 없는 형태의 고주파링크방식의 계통연계형 PCS(Power Conditioning System)를 개발하였다. 본 시스템은 고주파 DC-DC 컨버터, 고주파 절연변압기, 풀브리지 다이오드 정류기, DC filter, 저주파 인버터, LC 필터로 구성되어 있다. 고주파 DC-DC 컨버터는 20kHz의 bipolar PWM 펄스를 발생시키며, 이 펄스는 고주파 절연변압기를 통해 승압되고, 풀브리지 다이오드를 통해 정류된다. 마지막으로 저주파 인버터를 통해 정현파 전류가 계통에 유입되게 된다. 제안한 고주파링크방식의 시스템은 기존의 60Hz 절연변압기를 사용하는 시스템 보다 많은 스위칭 소자가 사용되지만, 60Hz 절연변압기를 생략함으로서 시스템의 소형경량화 및 저가화를 이룰 수 있었다.
Single-phase full-bridge inverters have shoot-through problems. Dead time is an essential way of solving these issues, but it distorts the output voltage and current. Dual-buck inverters are designed to eliminate the abovementioned problems. However, these inverters result in switching power loss and electromagnetic interference due to the diode reverse-recovery problem. Previous studies have suggested reducing the switching power loss from diode reverse-recovery, but their proposed methods have complex circuit configurations and high system costs. To alleviate the switching power loss from diode reverse-recovery, the current work proposes a dual-buck inverter with a coupled inductor. In the structure of the proposed inverter, the current flowing into the original diode is divided into a new diode. Therefore, the switching power loss is reduced, and the efficiency of the proposed inverter is improved. Simulation waveforms and experimental results for a 1.0 kW prototype inverter are discussed to verify the performance of the proposed inverter.
양방향 컨버터는 연료전지 발전 시스템의 인버터 dc link와 저전압 배터리를 연결시켜 준다. 방전 모드(boost)에서는 저전압(battery: 48[V])측에서 고전압(dc link: 380[V])측으로, 충전 모드(buck)에서는 저전압측 배터리로 전력이 전달된다. 본 논문에서는 방전모드 시 MOSFET으로 구성된 1.5[kW] 능동 클램프 전류원 풀 브리지 컨버터가 동작하고 배터리 충전 시 IGBT로 구성된 전압원 하프 브리지 컨버터가 동작한다.
In this paper, a novel 10kV, 50A, 50kHz pulsed power supply based on IGBT stacks is proposed. Proposed scheme consists of series connected 12 IGBT to generate maximum 10kV output pulse and 10kW full bridge phase-shifted zero voltage switching converter to charge DC capacitor voltage. Each IGBTs are sustain the 830V of capacitor voltage at turn off interval. By turn on the each IGBT for the same time it gives the path for the series connection of charged capacitor. From above turn on and off procedure, high voltage repetitive pulse is applied to the load. The synchronization of gating signal is important of series operation of IGBTs. For gating signal synchronization, specially designed gate power circuit using full bridge inverter and pulse transformer is developed to generate IGBT gating signal.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.