Hyeong-Seok Lee;Yu-Rim Kim;Young-Jik Ahn;Ho-Seok Son;Jong-Pil Chun
Korean Journal of Agricultural Science
/
v.50
no.3
/
pp.497-505
/
2023
This study evaluated the impact of rain shelters made of plastic film on spring frost damage and fruit quality in Asian pears ('Niitaka') over two years. In 2021, during the coldest spring days (between 0:00 am and 7:00 am), temperatures dropped to -1.20 - 0.43℃ at 120 cm and -1.33 - 0.57℃ at 200 cm above ground level in the control. Conversely, the rain shelter treatment maintained higher temperatures, -0.40 - 0.87℃ at 120 cm and -0.43 - 0.77℃ at 200 cm. Flower damage was significantly lower in the rain-sheltered group, with incidences of 1.3 and 6.9% at 120 and 200 cm, respectively, compared with 18.1 and 22.6% in the control group. Visual observations verified the prevention of frost adhesion on flower organs in the sheltered group, compared with noticeable pistil death and petal browning in the control group. In 2022, when temperatures remained above 0℃, fruitlet stalk length was 5 - 6 mm longer in the sheltered group. The cumulative impact of rain shelters was evident in the improved fruit quality over the two years. This study suggests resilient cultivation strategies in the face of climate change to reduce frost damage, increase productivity, improve fruit quality, and potentially increase incomes of the farmers.
Journal of the Korea Institute of Building Construction
/
v.24
no.2
/
pp.193-202
/
2024
This research delves into the evaluation of the suitability of ultrasonic pulse velocity as a diagnostic tool for early detection of frost damage in concrete. The investigation involves the measurement of compressive strength and ultrasonic pulse velocity concerning the depth of freezing for individual mortar specimens, followed by an analysis of their microstructure and their interrelation. The findings indicate a consistent decrease in both compressive strength and ultrasonic pulse velocity with increasing freezing depth. Furthermore, a correlation between compressive strength and ultrasonic pulse velocity concerning the depth of early frost damage is established. Consequently, the study asserts the potential of utilizing the ultrasonic pulse velocity method for early detection of frost damage in concrete, with prospects for quantifying the depth of damage through further research endeavors.
In this research, in order to study insulation effect of commercial XPS and recycled PE aggregates for prevention of frost heave in the roadbed of railroad track from the freezing temperature, model tests were carried out in the large freezing room. For this, thermal conductivities were measured for various dry densities, water contents, temperatures and mixing ratios of PE aggregates. From the tests, it can be seen that thermal conductivities of roadbed decrease with the increase of the ratio of mixed PE aggregates. However it was sensitive to the changes of temperature and water content due to the amount of water in the voids. From the model test of railroad track, it can be seen that the time to reach $0^{\circ}C$ was longer for XPS than that for the PE aggregates. Also the test shows best insulation effect can be achieved when XPS board was installed above the PE aggregate layer rather than the opposite order.
Proceedings of the Korean Institute of Building Construction Conference
/
2013.11a
/
pp.23-25
/
2013
In this study, the results are compared with the case of the concrete with embedded heating wire to verify the performance of the IB made in order to improve the workability and affordability, and to determine the effectiveness of early frost damage prevention. The IB was made using the 5W heating wire and layed on the upper surface of the concrete. The temperature was reduced to below 0℃ approximately within 24 hours, then approached the external temperature thereafter. On the other hand, when the 20W heating wire was used to make the IB and applied the same way, the temperature remained around -2 to 3℃ on the average even through the temperature was reduced to below 0℃, due to the heating wire with relatively large heating capacity. It appeared to reach 85% of the direct heating by embedding the heating wire relatively deeper in the concrete. However, it was determined that using the IB made with the 20W heating wire will prevent the early frost damage to some degree in -10℃.
Proceedings of the Korean Institute of Building Construction Conference
/
2012.11a
/
pp.47-49
/
2012
Under this study, the characteristics of concrete intensity condition following the curing method under the extremely low temperature environment have been contemplated, and as a result, in the event of insulation + heat cable curing, the intensity and accumulated temperature accomplishment period is required for two times of requiring initial frost damage prevention than the case of heating + heat insulation curing method due to the insufficient calories supplied in general.
The objective of this study was to experimentally investigate the effect of heat curing methods on the temperature history and strength development of slab concrete exposed to $-10^{\circ}C$. The goal was to determine proper heat curing methods for the protection of nuclear power plant structures against early-age frost damage under adverse (cold) conditions. Two types of methods were studied: heat insulation alone and in combination with a heating cable. For heat curing with heat insulation alone, either sawdust or a double layer bubble sheet (2-BS) was applied. For curing with a combination of heat insulation and a heating cable, an embedded heating cable was used with either a sawdust cover, a 2-BS cover, or a quadruple layer bubble sheet (4-BS) cover. Seven different slab specimens with dimensions of $1200{\times}600{\times}200$ mm and a design strength of 27 MPa were fabricated and cured at $-10^{\circ}C$ for 7 d. The application of sawdust and 2-BS allowed the concrete temperature to fall below $0^{\circ}C$ within 40 h after exposure to $-10^{\circ}C$, and then, the temperature dropped to $-10^{\circ}C$ and remained there for 7 d owing to insufficient thermal resistance. However, the combination of a heating cable plus sawdust or 2-BS maintained the concrete temperature around $5^{\circ}C$ for 7 d. Moreover, the combination of the heating cable and 4-BS maintained the concrete temperature around $10^{\circ}C$ for 7 d. This was due to the continuous heat supply from the heating cable and the prevention of heat loss by the 4-BS. For maturity development, which is an index of early-age frost damage, the application of heat insulation materials alone did not allow the concrete to meet the minimum maturity required to protect against early-age frost damage after 7 d, owing to poor thermal resistance. However, the combination of the heating cable and the heat insulating materials allowed the concrete to attain the minimum maturity level after just 3 d. In the case of strength development, the heat insulation materials alone were insufficient to achieve the minimum 7-d strength required to prevent early-age frost damage. However, the combination of a heating cable and heat insulating materials met both the minimum 7-d strength and the 28-d design strength owing to the heat supply and thermal resistance. Therefore, it is believed that by combining a heating cable and 4-BS, concrete exposed to $-10^{\circ}C$ can be effectively protected from early-age frost damage and can attain the required 28-d compressive strength.
Journal of the Korea Institute of Building Construction
/
v.16
no.1
/
pp.67-76
/
2016
Concrete exposed to severely low temperature below $-20^{\circ}C$ should be provided with proper heat supplying curing to protect the concrete from early frost damage at the time of pouring.meanwhile, so far, effective heat curingmethods of the concrete under severely low temperature are not well established in Korea. For this reason, the objective of this paper is to provide effective heat curingmethod of concrete exposed to severely low temperature to protect early frost damage by varying the combination of heat curingmaterial combinations. Temperature history,maturity development and core strength results are investigated. Fourmock-up specimens simulating slab, wall and column were prepared and heat insulation, heat supplying and both were applied. Test results indicate that the combination of quadruple layer bubble sheet(4BS) and embedding of heating cable has desirable performance for a slab, and heat supplying curing inside heat enclosure and heat generationmat also shows desirable performance for a wall, and for a column, use of EPS heat insulation has proper performance against early frost damage, which reaches $45^{\circ}D{\cdot}D$ and helps the concretemaintain above $0^{\circ}C$ within 3 days. Themethodsmentioned above are believed to be optimum protection from early frost damage of the concrete under $-20^{\circ}C$.
Kim, Tae-Woo;Lee, Jea-Hyeon;Kyung, Yeong-Hyeok;Lee, Jong-Gyo;Han, Min-Cheol;Han, Cheon-Goo
Proceedings of the Korean Institute of Building Construction Conference
/
2017.05a
/
pp.11-12
/
2017
This study aims to analyze the properties of the temperature change in vertical reinforcements in outdoor wall structures in winter in relation to the different methods of bubble sheet installation, and to subsequently determine the possibility of initial frost damage to the concrete as a result of low temperature. As for the experimental variables, double bubble sheets were used as curing materials, and the curing method was to model the part where the slab and the wall intersect and the rebar is exposed, and to measure the change of temperature around the exposed rebar in accordance with the change of the coating curing. It was found that by employing curing method B, which is to install the bubble sheet between the vertical reinforcements, the most vulnerable area, which is 50mm below(④) the surface of the concrete, would be lowered to sub-zero temperature 20 hours later than when using curing method A, and that therefore it is more effective to install the bubble sheet between the vertical reinforcements for the prevention of initial frost damage.
It followed in system development and SMRT(Seoul Metropolitan Rapid Transit Co)System reached to an automatic train operation(ATO) and driverless operation(DLM) from the manual operation due to the train driver. The train like the general bus or the car vehicle was not serial riding in a car and the Parallel concept which the numerous passenger rides in a car simultaneously occur frequently the charge of the train driver unmanned bitterly from existing manual handling was a possibility of doing, train open door control(ODM) which bites also ATO, it handles it minimized. Like this ATO/DLM, the control system which bites being a Wayside to Train communication for immediacy, it is a system of the Vital concept the immediacy of the citizen Data evil the radio information transmission and the train of the interface which is accurate from unmanned operation and, will decipher, will accomplish it will guarantee. It respects the passenger accident prevention and an air question environment improvement from subway platform and phul leys the screen door of Platform(PSD) with the fire tube frost it refers and part it treats and to sleep it does, ODM which bites is accuracy and immediacy of altitude and when seeing from the viewpoint which demands the trust of altitude, ODM system the trust of car incest interface in the equipment construction which is safe and the comparative analysis back of the system analysis against the control which bites and case study and other subway system it leads from the research which it sees and signal - train in base grudge to sleep it contributes it does.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.