• Title/Summary/Keyword: Framework Planning

Search Result 874, Processing Time 0.031 seconds

Framework for Estimating Appropriate Construction Duration of CFRD in the Planning Phase

  • Kim, In Kyum;Kim, Kyong Ju;Yun, Won Gun
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.604-605
    • /
    • 2015
  • To secure quality of dam construction needs appropriate construction duration. Tight construction schedule may have negative influence on infrastructure quality, work safety and maintenance cost. It is necessary to reflect proper construction duration in the planning phase. There have been standards for estimating construction duration of building and industrial complex development but dam construction have not. In order to estimate construction duration of CFRD, feasible study reports and design reports were analyzed to acquire available information. After that, considering on construction duration methods such as comparison with similar cases, approximate estimating formula, approximate quantity assumption were adapted to Critical Path items. Hence, this study present framework for construction duration estimating of CFRD in the planning phase. This framework can be applied other types of dam along the same line.

  • PDF

e-CRM Strategy based on Customer Purchasing Activity (고객구매활동 기반의 e-CRM 전략)

  • 강현석;서영호
    • Journal of Korean Society for Quality Management
    • /
    • v.28 no.3
    • /
    • pp.133-144
    • /
    • 2000
  • Many organizations have developed their own information systems not only for internal efficiency but also for effectiveness of external customer services. One of the most effective service tools for their customers is the use of information technology. The web technology is rapidly becoming one of the most effective tools for online customer services. In order to gain competitive edge, organizations must have effective web site planning methods for their customer service. A study on traditional information systems planning methodologies has been conducted and they are compared with web site planning techniques. Cases of web sites in order to Improve customer relationship are analyzed. finally, a new conceptual framework for web site planning strategy for e-CRM is proposed in this paper. In order to support effective web site planning, online customer contact points and online service activities are defined and classified as several stages. And, web site strategies corresponding to each customer service activities are developed and proposed, With this framework, organizations can build competitive web strategies for improving their online customer relationships, thereby increasing customer satisfaction.

  • PDF

A Hierarchical Production Planning and Control System in a Make-to-Order Environment with Dynamic Events (동적 이벤트를 고려한 수주생산환경의 계층적 생산계획 및 통제 시스템)

  • Jang, Gil-Sang;Kim, Jae-Gyun
    • IE interfaces
    • /
    • v.14 no.1
    • /
    • pp.9-19
    • /
    • 2001
  • Production planning and control system plays an important role in manufacturing companies because it determines all production capacity planning, material procurement planning, and production scheduling which are needed in the process of producing products. Many researches on production planning and control system have been conducted for many manufacturing companies for recent decade. But, a considerable research achievement has mainly been obtained on the forecast-driven production for a make-to-stock and an assemble-to-order. The reason is that there are some hardships such as difficulties of standardizing product information, the frequent changes of design and material, and the unexpected dynamic events that influence the production of customer's order in a make-to-order or an engineering-to-order environments. By these characteristics and their complexities, some studies for production planning and control system in a make-to-order environment are presented recently. In this paper, we present the framework of the hietachical production planning and control for a make-to-order environment with dynamic events. In order to illustrate the usefulness of the proposed framework for a hietachical production planning and control, the information system for a make-to-order production was implemented with the object of the company of producing electricity transformer.

  • PDF

Development of a decision framework for the designing and implementation of a sustainable underground water storage system

  • Gladden, Lennox Alexander;Park, Namsik
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2015.05a
    • /
    • pp.244-244
    • /
    • 2015
  • Managed Aquifer Recharge (MAR) in the form of Aquifer Storage and Recovery (ASR) systems are being applied for numerous water augmentation projects both in developed and developing countries. Given the onset of Climate Change and its influence on weather patterns and land use, it has been acknowledged the utilization of this technology will be ever increasing. This technique like all others does have its drawbacks or disadvantages, whereby to overcome these drawbacks or disadvantages it is recommended that logical planning process be followed. In this study, we developed a decision framework known as "Decision framework for the planning, designing, construction/testing and implementation of subsurface water storage system" to further standardize the planning and design process of subsurface water storage system to increase the probability of having a successful ASR/ASTR project. The formulation of this framework was based on earlier frameworks, guidelines, published papers and technical reports which were compiled into a data collection database. The database of which consider both qualitative and quantitative aspect for example recharge objectives, site location, water chemistry of the native, source and recovered water, aquifer characteristics(hydraulic conductivity, transmissivity, porosity), injection/pumping rate, ecological constraints, societal restrictions, regulatory restrictions etc. The assimilation of these factors into a singular framework will benefit the broad spectrum of stakeholder as it maps the chronological order under which ASR project should be undertaken highlighting at each stage the feasibility of the project. The final stage of which should result in fully operational ASR system. The framework was applied to two case studies and through the application of a modified ASR site selection suitability index (Brown et al., 2005) a score was derived to identify the performance of each site. A high score of which meant a maximize chance of success given the reduce presence of project constraints.

  • PDF

A Study on National IT Planning based on EA Approach (국가정보화시행계획 업무의 EA적 접근)

  • Hong, Pilky;Kim, Daegwon;Lee, Seogjun
    • Journal of Information Technology and Architecture
    • /
    • v.11 no.2
    • /
    • pp.235-247
    • /
    • 2014
  • The National IT Plan is formulated every 5 years in Korea. Each ministry formulates its own annual IT plans and budgets based on the National IT Plan. Presidential agenda, in addition to the Ministry plan usually come in the budgetary process. A budget view and an IT view are not always aligned consistently in the budgetary process. For more consensus and less conflict between the finance ministry and the IT ministry, it would be useful to have a common framework to examine and review the many IT plans submitted by many ministries. We offer an EA-based framework that considers various views and classifications on IT plans. This framework would make the National IT Planning more efficient and effective.

A BIM-based Automated Framework for Formwork Planning on Construction Sites

  • Xu, Maozeng;Mei, Zhongya;Tan, Yi
    • International conference on construction engineering and project management
    • /
    • 2017.10a
    • /
    • pp.52-61
    • /
    • 2017
  • Considering its significant impact on the cost and schedule of construction projects, formwork as one part of temporary facility categories in construction should be arranged precisely. Current practice in the formwork planning is often conducted manually and repetitively, causing low efficiency and time waste. This study proposes an automated framework to generate more accurate and detailed formwork plans by utilizing information from building information modeling (BIM) considering the adequate geometric and semantic information provided by the BIM model. The dimensions and quantities information of elements in a building can be extracted automatically. Then, a rule is prepared for calculating the required forms erected around elements based on the contact areas. Finally, an algorithm of integrating first fit decreasing (FFD) with coordinated bottom left (CBL) is applied to automatically generate the formwork plan. The BIM-based automated planning framework is demonstrated by an illustrative example. The results show that the proposed framework can generate the formwork plan accurately and automatically, and significantly improve the efficiency in the formwork plan and reuse.

  • PDF

Centralized, Distributed, Hybrid Task Planning Framework for Multi-Robot System in Diverse Communication Status

  • Moon, Jiyoun
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.10 no.3
    • /
    • pp.215-220
    • /
    • 2021
  • As the role of robots expands, flexible task planning methods are attracting attention from various domains. Many task planning frameworks are introduced to efficiently work in a wide range of areas. In order to work well in a broad region with multiple robots, various communication conditions should be controlled by task planning frameworks. However, few methods are proposed. In this paper, we propose mission planning methods according to the communication status of robots. The proposed method was verified through experiments assuming different communication states with a multi-robot system.

Motion Planning and Control for Mobile Robot with SOFM

  • Yun, Seok-Min;Choi, Jin-Young
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 2005.06a
    • /
    • pp.1039-1043
    • /
    • 2005
  • Despite the many significant advances made in robot architecture, the basic approaches are deliberative and reactive methods. They are quite different in recognizing outer environment and inner operating mechanism. For this reason, they have almost opposite characteristics. Later, researchers integrate these two approaches into hybrid architecture. In such architecture, Reactive module also called low-level motion control module have advantage in real-time reacting and sensing outer environment; Deliberative module also called high-level task planning module is good at planning task using world knowledge, reasoning and intelligent computing. This paper presents a framework of the integrated planning and control for mobile robot navigation. Unlike the existing hybrid architecture, it learns topological map from the world map by using MST (Minimum Spanning Tree)-based SOFM (Self-Organizing Feature Map) algorithm. High-level planning module plans simple tasks to low-level control module and low-level control module feedbacks the environment information to high-level planning module. This method allows for a tight integration between high-level and low-level modules, which provide real-time performance and strong adaptability and reactivity to outer environment and its unforeseen changes. This proposed framework is verified by simulation.

  • PDF

A Case Study of a Planning Process through Developing Serious Games (기능성게임 제작을 통한 기획접근 프로세스 사례)

  • Eun, Kwang-Ha
    • The Journal of the Korea Contents Association
    • /
    • v.10 no.6
    • /
    • pp.197-204
    • /
    • 2010
  • This study explains the planning practical training that researches the process of functional game planning approach by developing functional games. The main focus of this study is the practical training process of planning which is an important part of game development jobs by developing games with proper functional materials, 'Framework of Planning Functional Game', and the verification of framework by developing functional games. This paper suggests that the functional game planning approach with the right function requires progressive/quantitative standard, which is different from typical process. Therefore, this paper is useful as reference materials of a functional game education through the cases of games developed by the progressive/quantitative approach standard.

A Study on Collaboration Strategy Planning of Semiconductor Industry (반도체 산업의 협업전략계획에 관한 연구)

  • Cho Nam Wook;Kim Tae Sung
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.28 no.2
    • /
    • pp.139-145
    • /
    • 2005
  • As today's business environment becomes more globalized and distributed, the importance of collaboration is rapidly increasing. This Paper Presents a systematic approach to collaboration strategy planning. The framework suggests that a Collaborative Process Map needs to be identified first. Then, Collaboration Maturity of an enterprise is evaluated. Based on the Collaborative Process Map and Collaboration Maturity Evaluation, Collaboration Execution Plans are systematically established. A case study shows that the proposed framework can successfully be applied to the strategic collaboration planning of semiconductor industry