• Title/Summary/Keyword: Four-Conductor Lines

Search Result 6, Processing Time 0.026 seconds

Mode Analysis of Cascaded Four-Conductor Lines Using Extended Mixed-Mode S-Parameters

  • Zhang, Nan;Nah, Wansoo
    • Journal of electromagnetic engineering and science
    • /
    • v.16 no.1
    • /
    • pp.57-65
    • /
    • 2016
  • In this paper, based on the mode analysis of four-conductor lines, the extended mixed-mode chain-parameters and S-parameters of four-conductor lines are estimated using current division factors. The extended mixed-mode chain-parameters of cascaded four-conductor lines are then obtained with mode conversion. And, the extended mixed-mode S-parameters of cascaded four-conductor lines can be predicted from the transformation of the extended chain-parameters. Compared to the extended mixed-mode S-parameters of four-conductor lines, the cross-mode S-parameters are induced in the extended mixed-mode S-parameters of cascaded four-conductor lines, due to the imbalanced current division factors of cascaded two sections. The generated cross-mode S-parameters make the equivalent different- and common-mode conductors not independent from each other again. In addition, a new mode conversion, which applies the imbalanced current division factors, between the extended mixed-mode S-parameters and standard S-parameters is also proposed in this paper. Finally, the validity of the proposed extended mixed-mode S-parameters and mode conversion is confirmed by a comparison of the simulated and estimated results of shielded cable.

A Study on the Spacer Installation Method for 2-Conductor Bundle Transmission Lines (2도체 송전선로의 스페이서 취부방식 연구)

  • Min, Byeong-Wook;Kim, Woo-Kyum;Choi, Han-Yeol;Park, Kee-Yong;Kim, Won-Jin;Park, Jae-Ung
    • Proceedings of the KIEE Conference
    • /
    • 2008.07a
    • /
    • pp.333-334
    • /
    • 2008
  • Overhead transmission lines are classified by the number of sub conductors per phase. Korean transmission lines use two, four, or six-conductor bundle. Bundle of conductors must have spacers or spacer dampers which keep the proper distance between sub conductors. They can prevent conductors from being vibrated or twisted due to the wind. As for the two-conductor bundle, alternating current flow generates absorption force between sub conductors which may cause a collision of sub conductors. To prevent sub conductors from being vibrated, twisted, and collided, spacer or spacer damper installation method is designed considering vibration characteristics of sub conductors. We have spacer installation method for four or six-conductor bundle lines. However, we don't have it for two-conductor bundle ones. So we have installed spacers at regular intervals in two-conductor bundle lines, and it caused rigid body oscillation of conductors due to the wind which made a flashover between conductors. This paper introduces a vibration characteristic analysis of two-conductor bundle and proposes a spacer installation method for two-conductor bundle lines.

  • PDF

Field Observation and Analysis of Wind-Induced Vibrations in Four-Bundled Conductor Transmission Lines

  • Sohn, Hong-Kwan;Lee, Hyung-Kwon;Chu, Jang-Hee;Lee, Dong-Il;Lee, Eun-Woong
    • KIEE International Transactions on Power Engineering
    • /
    • v.3A no.2
    • /
    • pp.109-114
    • /
    • 2003
  • This paper presents observations made on four-bundled conductor transmission lines concerning the behavior of conductors under the effect of natural winds. To know the wind-induced vibration status and how to control it, wind-induced vibrations have been recorded and analyzed from the real transmission lines. From the field observation and analysis results, subspan oscillation was found to be the main type of vibration. In addition, the data also revealed some common characteristics of the observation sites with high maintenance rates. The results will be used in controlling the subspan oscillations and protecting the conductors.

A Computer method in Economical Design of Conductor Sizes of Distribution Lines (전자계산기에 의한 배전선료전선 단면적의 경제적 설계법)

  • Young Moon Park
    • 전기의세계
    • /
    • v.24 no.5
    • /
    • pp.107-110
    • /
    • 1975
  • This paper describes computational algorithms and a computer program for optimum determinations of wire conductor sizes of radial or tree-type distibution lones with given constraints. Here, The objective function is defined as the total summation of the volume or weight of respective conductor materials required for buildingup the entire distributing system. Four categories of constraints are applied to the obiective function. That is, on the respective load points constraint is imposed by a specified voltage drop limit, and the respective line elements are capable of carrying the current safely(safety current) and also must maintain the minimum thickness in viewpoint of mechanical strength and legal requirements. And finally, the conductor sizes have to be selected among the standardized size levels of the products. These kinds of optimization problems cannot be solved by the ordinary optimization tediniques such as the Linear Programming Method, SUMT Technique, etc. This paper, therefore, successfully devised the powerful alorithms to solve the problem, using the particular properties or characteristics ingerent to the radial or tree-type distribution system. The computer program developed from the algorithms was applied to several sample systems and shown to be exact and very efficient.

  • PDF

Analysis of Induced Voltage on Telecommunication Line in Parallel Distribution System

  • Kim, Hyun-Soo;Rhee, Sang-Bong;Lee, Soon-Jeong;Kim, Chul-Hwan;Kim, Yoon Sang
    • Journal of Electrical Engineering and Technology
    • /
    • v.9 no.2
    • /
    • pp.726-732
    • /
    • 2014
  • A current flowing through a distribution conductor produces induced voltage, which is harmful to a telecommunication line. Previous research on induced voltage has been focused on single-circuit lines in the distribution system. However, the double-circuit lines, referred to as parallel distribution lines, are widely used in distribution systems because they have significant economic and environmental advantages over single-circuit lines. Therefore, a study on the induced voltage in double-circuit lines is needed. This paper presents a method of calculating the induced voltage in a parallel distribution system using four-terminal parameters and vector analysis. The calculation method is verified by the Electromagnetic Transient Program (EMTP) simulation.

The Study on Burr Removal Rate Along the Cutting Radial Distance in U-type Flow Channel (절삭 반경에 따른 U-type 유로 형상의 버 제거율에 관한 연구)

  • Son, Chul-Bae;Lee, Jung-Hee;Kwak, Jae-Seob
    • Journal of the Korean Society of Manufacturing Process Engineers
    • /
    • v.18 no.7
    • /
    • pp.8-13
    • /
    • 2019
  • As increasing demand for precise machining in advanced disciplines, especially in semi-conductor, aeronautical and automotive industries, the magnetic abrasive deburring(MAD) which is able to eliminate micro-sized burr on complex surface in less time has drawn the attention in the last decades. However, the performance of MAD is subject to shape and size of a tool. Therefore, this study aim to identify deburring behavior of MAD in U-type flow channel by measuring the length rate of burr removal in radial distance of the cylindrical tool under four process factors. In order to evaluate the deburring effect of MAD on the surface, finishing regions are divided based on center of the circular cutting tool. As a results, it was defined that the amount of burr removal in a downward direction moving toward flow channel from the top surface was higher than upward direction. This is because the magnetic abrasives were detached from magnetic lines of force due to geometrical shape.