• Title/Summary/Keyword: Foundation stone

Search Result 160, Processing Time 0.024 seconds

A Numerical Study on Granular Compaction Pile Method Reinforcing by Using Lean-Mixed Concrete (빈배합 콘크리트로 보강된 조립토 다짐말뚝공법에 관한 기초연구)

  • Kim, Seung-Wook;Kim, Hong-Taek;Kim, Jeong-Ho;Baek, Seung-Cheol
    • Journal of the Korean GEO-environmental Society
    • /
    • v.7 no.1
    • /
    • pp.5-18
    • /
    • 2006
  • Stone column or granular compaction pile have been used in widely during the several decades as a technique to reinforce soft cohesive soils and increase bearing capacity, accelerate consolidation settlement of the foundation soil. The bearing capacity of the granular compaction pile is governed mainly by the lateral confining pressure mobilized in the native soft soil to restrain bulging collapse of the granular pile. Therefore, the technique becomes unfeasible in soft, compressible clayey soils that do not provide sufficient lateral confinement. This paper presents the main results of numerical study of granular compaction pile which is partly mixed with lean concrete. 3D finite element analyses are performed with composite reinforced foundations by both granular compaction pile and partly mixed granular compaction pile with lean-mixed concrete. Finally, a regression formula for calculating settlement reduction coefficients is proposed in this study by using numerical analysis results and applicability of the proposed method is identified by a series of parametric study about settlement reduction coefficients.

  • PDF

Reconsideration of the Construction Period of the Jeongnimsaji Temple Site (정림사지 창건시기 재고)

  • Tahk, Kyung-Baek
    • Journal of architectural history
    • /
    • v.25 no.4
    • /
    • pp.57-64
    • /
    • 2016
  • It was believed that Jeongnimsa temple was built after the capital was moved from Gongju to Buyeo. It was confirmed that it was built A.D. $625{\pm}20$ by conducting a paleomagnetic analysis on the fireplace, which was recently found at the bottom of Jungmunji(middle gate). Consequently, it is assumed that the temple was built in the early 7th century unlike the previous point of view. Therefore, this study evaluated if the fireplace at the bottom of Jungmunji was found at the geological stratum representing the Jeongnimsa temple. Moreover, the study examined when the fireplace at the bottom of Jungmunji was constructed on the soil stratum. It is possible that the fireplace was built in the early 7th century as shown in the paleomagnetic analysis. However, when we compared the soil strata of the Jungmunji and the existing five-story stone pagoda, it showed that the ground was prepared differently and they were built over a fairly long period of time. Furthermore, I discovered that there was a wooden pagoda under the five-story stone pagoda by examining the soil strata map. Therefore, previous studies evaluated the arrangement of auxiliary buildings of Jeongnimsa temple and concluded that it was built in the early 7th century. It is hard to determine when the temple was built based on the arrangement of auxiliary buildings, because it takes a long time to build a temple and auxiliary buildings can be relocated during this long construction period. Rather, we have to admit that there are various arrangement patterns through minor changes in buildings from the one pagoda and one main building(Geumdang) arrangement.

A Study on the Settlement Restraint of the Granular Compaction Pile (조립토 다짐말뚝의 침하저감방안에 관한 연구)

  • Kim, Seung-Wook;Lee, Duck-Won;Kim, Seo-Ryong;Ann, Jai-Gyoo
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.336-342
    • /
    • 2005
  • Stone column or granular compaction pile have been used in widely during the several decades as a technique to reinforce soft cohesive soils and increase bearing capacity, accelerate consolidation settlement of the foundation soil. The bearing capacity of the granular compaction pile is governed mainly by the lateral confining pressure mobilized in the native soft soil to restrain bulging collapse of the granular pile. Therefore, the technique becomes unfeasible in soft, compressible clayey soils that do not provide sufficient lateral confinement. This paper presents the main results of numerical study of granular compaction pile which is partly mixed with lean concrete. 3D finite element analyses are performed with composite reinforced foundations by both granular compaction pile and partly mixed granular compaction pile with lean-mixed concrete.

  • PDF

A Study on the Purity Change of Silicon Metal According to the Purity of Silica Stone in Metal Silicon Extraction by Thermit Reaction (테르밋 반응을 이용하여 금속실리콘을 추출할 때 규석 순도에 따라 금속실리콘 순도 변화에 대한 고찰)

  • Kim, Jaehee;Han, Jinho;Shin, Hyunmyung
    • Resources Recycling
    • /
    • v.26 no.4
    • /
    • pp.19-25
    • /
    • 2017
  • The ways of producing metal silicon include a carbon reduction method, a plasma reduction method, and a thermite reaction method. The carbon reduction process produces metal silicon by metallurgical refining. The carbon reduction method is produced by adding a raw material mixed with quartz and coke to an electric arc furnace which is for carbon reduction. The cost of high energy costs and environmental protection facilities is an issue when producing metal silicon using electric arc furnaces. For this reason, there is no metal silicon production facility in Korea yet. Therefore, the optimal manufacturing conditions by the carbon reduction method are being studied through the experimental facilities by the companies and research institutes. The present study investigated the change of metal silicon purity according to the purity of silicon when extracting metal silicon using the thermit reaction, which has a relatively lower manufacturing cost than the carbon reduction method.

Analytical Study of Static and Dynamic Responses of Multi-story Brick Pagoda of Silleuksa Temple (신륵사 다층전탑의 구조해석에 대한 연구)

  • Lee, Ga-Yoon;Lee, Sung-Min;Lee, Kihak
    • Journal of Korean Association for Spatial Structures
    • /
    • v.22 no.3
    • /
    • pp.33-40
    • /
    • 2022
  • Recently, cultural heritages in South Korea gain many interests of restoration and preservation from the government since many of that have been severely damaged during earthquakes. Many previous studies in both terms of experimental and analytical approaches have been done to examine structural behavior and decide appropriate methods of preservation. Being motivated by such researches, this research aims to investigate a religious stone pagoda dated back to the Goryeo Dynasty in Korea. The structure consists of a granite stone foundation and baked bricks, which resembles the shape of traditional pagodas. In order to examine the structural behavior of the pagoda, an analytical model is implemented using ANSYS, a comprehensive engineering simulation platform. For the time history analysis of the pagoda, several earthquake excitations are chosen and input to simulation modeling. Seismic response of the tower such as time domain, natural frequency, modal shapes and peak acceleration measured at each layer are presented and discussed. In addition, the amplification ratio of the tower is calculated from the accelerations of each layer to determine tower stability in accordance with Korean seismic design guide. The determination and evaluation of status and response of the brick tower by simulation analysis play an important role in the preservation of history as well as valuable architectural heritages in South Korea.

Application of Geophysical Survey to the Geological Engineering Model for the Effective Detection in Foundation of Stone Relics (석조문화재 기초지반 파악을 위한 모형지반에서의 탐사기법 적용)

  • Kim, Man-Il;Lee, Chang-Joo;Kim, Jong-Tae;Kim, Ji-Soo;Kim, Sa-Dug;Jeong, Gyo-Cheol
    • The Journal of Engineering Geology
    • /
    • v.18 no.4
    • /
    • pp.537-543
    • /
    • 2008
  • To effectively delineate the foundation of stone relics by GPR and seismic refraction methods, a geological engineering model was constructed with alternating layer of soil and gravel to a depth of 3 m. This study was aimed at mapping the boundaries of model ground structure and interfaces of alternating layer using the various frequency antenna in GPR survey and seismic velocities. Compared to the resolution from the high frequency antenna, the image resolution from the survey using 100 Hz antenna is the lower, but with the deeper image coverage. On the contrast, the deeper structure was not mapped in the higher frequency data due to higher absorption effect, but the shallow layered zone was distinctively resolved. Therefore subsurface images were effectively provided by integrating the data with 100 MHz and 450 MHz antennas for the deep and shallow structures, respectively. Regarding the seismic refraction data, the boundaries of the model and interface of the alternating layers were not successfully mapped due to the limit of the survey length. However, the equivalent contours of low velocity extended deep as considerable velocity contrasts with surrounding ground.

Analysis of Species and Tree-Ring Dating of Wood Elements Used for the Daewoongjeon Hall of Youngguksa Temple (영국사 대웅전 목부재의 수종 및 연륜연대 분석)

  • Son, Byung-Hwa;Park, Won-Kyu;Yoon, Doo-Hyung
    • Journal of architectural history
    • /
    • v.15 no.2
    • /
    • pp.23-38
    • /
    • 2006
  • During the repair and restoration of the Daewoongjeon Hall of Youngguksa Temple, species identification and tree-ring dating for both present wood elements and charred ones excavated under the Hall, were conducted. The species of 74 wood elements of Daewoongjeon Hall, were identified as Pinus densiflora Sieb. et Zucc. and only 1 was identified as exotic Pinus species. The latter wood, which was used in the laths, seems to have been replaced during past repairs. Many documentary records and various artifacts pertaining to Youngguksa Temple are being excavated, but none described precisely the construction date of the present Daewoongjeon Hall. Also, from beneath the Daewoongjeon Hall, cornerstone and foundation of previous building and several charred wood elements were excavated. In comparing the direction of the stone columns of foundation of the previous structure and the existing Daewoongjeon Hall, the previous structure was rotated in an angle of approximately $15^{\circ}$. Therefore, in order to find the association of the previous structure with the present Daewoongjeon Hall, tree-ring dating was conducted. The dating of 41 original timbers and 14 roof-filling timbers of the present construction elements revealed that the last annual ring was of A. D. 1703 with complete latewood, indicating that those woods was cut some time between the autumn of 1703 and spring of 1704, and the building was erected in 1704 when we assume no period of wood storage. The year of the last annual ring of the charred elements, which were excavated from beneath the Daewoongjeon Hall, was analyzed as 1674. The cutting year of the woods used for the present building began in 1698, therefore, it can be presumed that the Daewoongjeon Hall before the fire was a structure that was elected shortly after 1674 and that a catastrophic fire occurred some time between 1674 and 1698.

  • PDF

The Study of Restoring Silsangsa Wooden Pagoda (실상사 목탑의 복원 연구)

  • Kim, Kyeong-Pyo
    • Journal of architectural history
    • /
    • v.16 no.6
    • /
    • pp.7-26
    • /
    • 2007
  • This article is about restoring the wooden pagoda which located in Silsangsa Temple after historical research. The process of this study, first of all, the theoretical study was considered about similar examples of wooden pagoda and gilt-bronze pagoda in Gorye period and wooden pagoda in contemporary period. After that, the study was established by the present condition of Silsangsa wooden pagoda site, the characteristic of Silsangsa wooden pagoda, the form of arrangement, the scale and height. Finally, considering those studies, the wooden pagoda designed in detail. This restoring design tried to follow the inference in that time. Moreover, the design tried to involve the elements of characteristic of region and Silsangsa wooden pagoda. Therefore, the research establish period of Silsangsa wooden pagoda in Gorye period. Locally, it considered both elements of Silla and Baeckje. The arrange form of restoring wooden pagoda was freestyle arrangement that had two main building of a temple and one middle pagoda. The idea of structure was to establish of double Core system. This system inferred from the system of building structure in ancient wooden pagoda and middle and modern age of multistory wooden construction. According to measurement of foundation stone, the scale of restoring wooden pagoda followed the skill of Tang-scale. The connection structure of each floor followed laminated structure which was the general form of log frame in that time. After study of foundation's condition, the present writer deseeded to have restoring the wooden pagoda 9 stories tall. The final aim was to depend on the structural intuition of the present writer, the writer tried to restore beautiful wooden pagoda according to in those days which is solution for contradiction of unclear point. So, it could be make out a plane of restoring wooden pagoda.

  • PDF

A Study on the Limitations in the Field Application of Seismic Mini-tomography (소규모 탐사단면에 대한 탄성파 토모그래피의 현장 적용 한계성 연구)

  • 김중열;김유성;현혜자;김기석
    • The Journal of Engineering Geology
    • /
    • v.6 no.1
    • /
    • pp.15-22
    • /
    • 1996
  • Frequency content of seismic waves observed in field seismic survey in Korea has almost not exceeded 4kHz(wave length 1m). The limited frequency content not only restricts the minimum size of objects which can be surveyed in seismic tomogrpahic application, but also makes a fundamental limit in the resolution of tomogram. This paper shows the resonable result obtained by confirmimg and resolving the problems which can be occured m measuring procedure for the small - sized section through field application. Seismic tomographic field survey was performed for a concrete construction for railroad bridge in Korea, and to this the tomographic measurements for the stone-build foundation construction for a bell house of church in Germany were compared.

  • PDF

An Empirical Study on Public Child Care Center for the Necessity of the Eco-Environmental Space (친환경공간의 필요성에 따른 구립 어린이집의 사례 연구)

  • Han, Hae-Ryon;Park, Young-Ki
    • Proceedings of the Korean Institute of Interior Design Conference
    • /
    • 2007.05a
    • /
    • pp.91-94
    • /
    • 2007
  • The change of modern society arouse the issue of the family structure and the demand of upbringing. According to the issue, the need of the upbringing is the big interest in society. This study is on the necessity of the eco-environmental space in public child care center. The study progressed with the result of the prior study, the demand of the parents of students in eco-environmental space in child care center. The results of the study are first, the natural light source can import in sky light, side light and atrium in child care center. Second, the indoor garden and interior plants would give the natural feelings. Third, the ponds and waterways in indoor and outdoor would give the empirical experiences. And the last, the stone and clay would give the tender feelings in interior and the sand play in outdoor would give the activities. This study would be the foundation on the upcoming study of the needs of the eco-environmental spaces in child facilities.

  • PDF