• Title/Summary/Keyword: Formwork

Search Result 272, Processing Time 0.022 seconds

An Experimental Study on the Measuring Lateral Formwork Pressure Controlled by Super-Workable Fresh Concrete (고유동 콘크리트의 거푸집 측압 측정에 관한 실험적 연구)

  • 이준구;박광수;김한중;배수호
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 1998.10a
    • /
    • pp.142-145
    • /
    • 1998
  • The purpose of this study is to estimate lateral formwork pressure controlled by super-workable fresh concrete using prototype structrues such as, tall wall, retaining wall, and beam quantitativly. As a result of this experiment, a function which can be used to design a formwork system and to predict formwork pressure curve is formulated.

  • PDF

A Study on Benefit/Cost Analysis of Form Work Methods for High-rise Residential Buildings (고층 주거건축물 거푸집의 편익/비용 분석에 관한 연구)

  • Kim, Jae-Yeob;Kim, Jae-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.4
    • /
    • pp.49-57
    • /
    • 2010
  • Selecting an appropriate formwork to fit the construction of a high-rise building is an important factor that can influence the success or failure of a construction. Currently, however, the reality is that in domestic high-rise building construction, the selection of an appropriate formwork with consideration of the characteristics of the formwork has not been done in a reasonable manner. To select formwork in a systematic and reasonable fashion, comprehensive consideration is required that must not only include the aspect of construction costs, but also air, quality, safety, and environmental issues. Therefore, this study aims to rationalize the selection process of formwork by applying the scientific method of Analytic Hierarchy Process (AHP) to the selection process of formwork, in terms of construction costs, quality and safety. To do this, the researcher investigated the current status of formwork being used in high-rise residential building construction. Then, based on the results of this investigation, the researcher selected an alternative for the formwork, and taking construction experts as the subjects of this study, conducted a survey on the applicability of the formwork as well as the priority of management thereof when selecting formwork. It is judged that the results of this research will contribute a more scientific and reasonable decision-making process than the existing non-scientific method in selecting formwork for high-rise residential building construction.

Optimization Model of Table Form dismantlement Sequence for Reducing Formwork Duration in Tall Building Construction (초고층 거푸집 공사 공기 단축을 위한 테이블폼 해체 순서 최적화 모델)

  • Nam, Chulu;Kwon, Jaebeom;Lim, Hyunsu;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2015.11a
    • /
    • pp.196-197
    • /
    • 2015
  • In tall building construction, time for transporting form affects formwork duration as plan size has become larger and quantity of inputted form has been increased. Thus, necessity of systematic dismantlement sequence of form has been increased to reduce the duration of formwork. Tabu search has been efficiently applied to solve problem of combinatorial optimization by using tabu list which can improve combination values. Therefore, this study proposes optimization model of dismantlement sequence of table form which has been preferred in tall building construction, to reduce the formwork duration by minimizing time for transporting form.

  • PDF

Application of 3D Printing Technology for Formwork Constructability Review in Tall Building Construction (초고층 거푸집 공사의 시공성 검토를 위한 3D Printing의 활용)

  • Lee, Junehyuck;Lee, Dongmin;Cho, Hunhee;Kang, Kyung-In
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2016.10a
    • /
    • pp.69-70
    • /
    • 2016
  • The constructability of formwork has a significantly influence on the duration and cost in tall building construction. However, current installation and dismantling process are conducted with heuristic approaches due to the absence of reasonable constructability review method. This study proposes a new method to review the constructability of formwork by utilizing 3D printing technology. It is expected that the suggested review method could reduce formwork duration and cost with subjective, but rational manner.

  • PDF

Factors for Selecting Forms; A Case-Study (건설프로젝트 거푸집 선정 요인의 현황 및 개선 방향)

  • Jung Young-Soo;Park Ji-Ho;Kang Seung-Hee;Park Bok-Man;Choi In-Sung
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2005.11a
    • /
    • pp.111-116
    • /
    • 2005
  • The formwork is very important in terms of time and cost of construction project. There have been ample research efforts regarding to technical issues such as types, specifications, and productivities. However, no previous research has addressed managerial requirements of the formwork. Thus, this paper investigated the present status of form work analyzing a case-study company, and derived an improvement plan for the formwork. The findings includes 1) the needs for increasing use of system forms in order to improve the quality and the safety and 2) further development of management system of formwork in order to enhance the efficiency.

  • PDF

Development of a Prediction Model for Formwork Pressure Exerted by Self-Compacting Concrete (자기충전 콘크리트의 거푸집 측압 예측 모델 개발)

  • Kwon, Seung-Hee
    • Proceedings of the Korea Concrete Institute Conference
    • /
    • 2008.04a
    • /
    • pp.453-456
    • /
    • 2008
  • This study is underway to develop a prediction model for formwork pressure exerted by self-compacting concrete(SCC). Three major mechanisms related to formwork evolution over time were found, and mathematical modelling of each mechanism was made. A calculation method for real formwork pressure by using the mathematical formulae was also established. To verify predictive capability of the prediction model, a parametric study on parameters used in the model was performed. It was confirmed that the proposed model include the essential parameters that can simulate the real formwork pressure evolution over time.

  • PDF

Analysis of Construction RCB Exterior Wall Formwork Placing High on Nuclear Power Plant (원자력 발전소 RCB 외벽 거푸집 1단 타설 높이별 시공성 분석)

  • Song, Hyo-Min;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2014.11a
    • /
    • pp.205-206
    • /
    • 2014
  • It is very important to reduce the construction duration of the Reactor Containment Building (RCB) when considering the more than 50 months on average from concrete placement to completion. The purpose of this study attempts to evaluate the single-stage workability of the system given a change in the height of the setting of RCB exterior wall formwork to be used in nuclear power plant construction. As a result of this study, it is possible height of 3.5m~4m uses formwork when analyzing the construction period and material costs an increase in formwork by concrete lateral pressure, to ensure the workability of the RCB exterior wall formwork. Through this study, I want to provide as basic data for the improvement of workability and RCB shortening the construction period.

  • PDF

Application of BIM on Quantity Estimate for Reinforced Concrete and Formwork

  • Cheng, Ying-Mei;Lin, You-Lun;Li, Cheng-Wei;Lin, Chi-Ting
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.227-231
    • /
    • 2015
  • The focus of this study is on the accuracy in quantity estimates made by BIM for materials needed during construction. BIM-Revit Architecture 2014 is utilized to establish the information for an actual case to conduct estimates for the amount of reinforced concrete and formwork needed. The actual case is with a total construction area of 5,438 square meters and a total floor area of 31,623 square meters. The building commenced in December 2012 and the major structure has been completed in 2014. It is a RC structure with 4 stories underground, 12 stories above and 3 roof floors. The result shows that both of the quantity estimates of reinforced concrete and formwork are higher than that of actual use in the case. The estimate of reinforced concrete is higher than that of actual use by 2.18%, while the estimate of formwork is higher than that of the actual use by 13.04%. The results indicate that the estimate of reinforced concrete made by BIM has high accuracy, but the accuracy of the formwork estimate still needs improvement.

  • PDF

Structural Performance Evaluation of a Precast PSC Curved Girder Bridge Constructed Using Multi-Tasking Formwork

  • Kim, Sung-Jae;Kim, Jang-Ho Jay;Yi, Seong-Tae;Noor, Norhazilan Bin Md;Kim, Sung-Chul
    • International Journal of Concrete Structures and Materials
    • /
    • v.10 no.sup3
    • /
    • pp.1-17
    • /
    • 2016
  • Recently, advanced transit systems are being constructed to reduce traffic congestions in metropolitan areas. For these projects, curved bridges with various curvatures are required. Many curved bridges in the past were constructed using aesthetically unpleasant straight beams with curved slabs or expensive curved steel box girders with curved slabs. Therefore, many recent studies have been performed to develop less expensive and very safe precast prestressed concrete (PSC) curved girder. One method of reducing the construction cost of a PSC curved girder is to use a reusable formwork that can easily be adjusted to change the curvature and length of a girder. A reusable and curvature/dimension adjustable formwork called Multi-tasking formwork is developed for constructing efficient precast PSC curved girders. With the Multi-tasking formwork, two 40 m precast PSC box girders with different curvatures were constructed to build a two-girder curved bridge for a static flexural test to evaluate its safety and serviceability performance. The static flexural test results showed that the initial cracking load was 1400 kN, exceeding the design cracking load of 450 kN. Also, the code allowed deflection of 50 mm occurred at a load of 1800 kN, verifying the safety and serviceability of the precast PSC curved bridge constructed using the multi-tasking formwork.

Development of Corner-Supported Auto Climbing Formwork System (강합성코어벽을 활용한 코너지지형 거푸집시스템 개발)

  • Hong, Geon-ho;Shim, Woo-Kyung
    • Journal of the Architectural Institute of Korea Structure & Construction
    • /
    • v.35 no.7
    • /
    • pp.171-178
    • /
    • 2019
  • Auto Climbing Formwork System (ACS) for construction of high-rise building is a construction method for automatically lifting the formwork system supported by the anchor on the pre-constructed concrete wall. It has excellent construction speed and quality, but it has the possibility of structural failure depending on the quality of concrete and also has low economical efficiency due to the use of foreign technology. In order to overcome these problems, this study conducted an optimum design for the development of a new concept of Corner Supported Auto Climbing System (CS-ACS) in conjunction with the development of corner steel-reinforced concrete core wall system. For the design the formwork system, the basic module and structural member compositions were planned, and the structural analysis program was used to analyze the optimum member's cross section and spacing. As a result, the horizontal displacement and the stress of the horizontal members were influenced by the spacing more than the cross-section of the member. On the other hand, vertical members did not affect the displacement and stress of the formwork system. The form tie was very effective in controlling the displacement when adjusting the spacing of the horizontal members, but when the spacing of the form tie is more than 1,500mm, it is analyzed that form tie is yielding in basic module. When the span of the formwork system is more than 30m, it is analyzed that the basic module needs to be changed because of the increase of overall displacement.