• 제목/요약/키워드: Flow scheduling

검색결과 310건 처리시간 0.028초

"V-shape"를 이용한 흐름작업 일정계획 (Flow Shop Scheduling Problems By using Y-Shape Property)

  • 노인규;이정환
    • 산업경영시스템학회지
    • /
    • 제14권23호
    • /
    • pp.65-70
    • /
    • 1991
  • This paper is concerned with a flow-shop scheduling problem for all jobs having the common due date using V-Shape penalty cost function for earliness and lateness. The objective of the paper is to develop an efficient heuristic scheduling algorithm for minimizing total penalty cost function and for determining the optimal common due date. In addition, the between-job-delay for two machines are considered for developing the algorithm. A numerical example is given for illustrating the proposed algorithm.

  • PDF

Evolutionary Network Optimization: Hybrid Genetic Algorithms Approach

  • Gen, Mitsuo
    • 한국지능시스템학회:학술대회논문집
    • /
    • 한국퍼지및지능시스템학회 2003년도 ISIS 2003
    • /
    • pp.195-204
    • /
    • 2003
  • Network optimization is being increasingly important and fundamental issue in the fields such as engineering, computer science, operations research, transportation, telecommunication, decision support systems, manufacturing, and airline scheduling. Networks provide a useful way to modeling real world problems and are extensively used in practice. Many real world applications impose on more complex issues, such as, complex structure, complex constraints, and multiple objects to be handled simultaneously and make the problem intractable to the traditional approaches. Recent advances in evolutionary computation have made it possible to solve such practical network optimization problems. The invited talk introduces a thorough treatment of evolutionary approaches, i.e., hybrid genetic algorithms approach to network optimization problems, such as, fixed charge transportation problem, minimum cost and maximum flow problem, minimum spanning tree problem, multiple project scheduling problems, scheduling problem in FMS.

  • PDF

A New Joint Packet Scheduling/Admission Control Framework for Multi-Service Wireless Networks

  • Long Fei;Feng Gang;Tang Junhua
    • Journal of Communications and Networks
    • /
    • 제7권4호
    • /
    • pp.408-416
    • /
    • 2005
  • Quality of service (QoS) provision is an important and indispensable function for multi-service wireless networks. In this paper, we present a new scheduling/admission control frame­work, including an efficient rate-guaranteed opportunistic scheduling (ROS) scheme and a coordinated admission control (ROS­CAC) policy to support statistic QoS guarantee in multi-service wireless networks. Based on our proposed mathematical model, we derive the probability distribution function (PDF) of queue length under ROS and deduce the packet loss rate (PLR) for individual flows. The new admission control policy makes admission decision for a new incoming flow to ensure that the PLR requirements of all flows (including the new flow) are satisfied. The numerical results based on ns-2 simulations demonstrate the effectiveness of the new joint packet scheduling/admission control framework.

Dynamic Scheduling of FMS Using a Fuzzy Logic Approach to Minimize Mean Flow Time

  • Srinoi, Pramot;Shayan, Ebrahim;Ghotb, Fatemeh
    • Industrial Engineering and Management Systems
    • /
    • 제7권1호
    • /
    • pp.99-107
    • /
    • 2008
  • This paper is concerned with scheduling in Flexible Manufacturing Systems (FMS) using a Fuzzy Logic (FL) approach. Four fuzzy input variables: machine allocated processing time, machine priority, machine available time and transportation priority are defined. The job priority is the output fuzzy variable, showing the priority status of a job to be selected for the next operation on a machine. The model will first select the machines and then assign operations based on a multi-criteria scheduling scheme. System/machine utilization, minimizing mean flow time and balancing machine usage will be covered. Experimental and comparative tests indicate the superiority of this fuzzy based scheduling model over the existing approaches.

An Improved Adaptive Scheduling Strategy Utilizing Simulated Annealing Genetic Algorithm for Data Center Networks

  • Wang, Wentao;Wang, Lingxia;Zheng, Fang
    • KSII Transactions on Internet and Information Systems (TIIS)
    • /
    • 제11권11호
    • /
    • pp.5243-5263
    • /
    • 2017
  • Data center networks provide critical bandwidth for the continuous growth of cloud computing, multimedia storage, data analysis and other businesses. The problem of low link bandwidth utilization in data center network is gradually addressed in more hot fields. However, the current scheduling strategies applied in data center network do not adapt to the real-time dynamic change of the traffic in the network. Thus, they fail to distribute resources due to the lack of intelligent management. In this paper, we present an improved adaptive traffic scheduling strategy utilizing the simulated annealing genetic algorithm (SAGA). Inspired by the idea of software defined network, when a flow arrives, our strategy changes the bandwidth demand dynamically to filter out the flow. Then, SAGA distributes the path for the flow by considering the scheduling of the different pods as well as the same pod. It is implemented through software defined network technology. Simulation results show that the bisection bandwidth of our strategy is higher than state-of-the-art mechanisms.

기대 평균흐름시간 최소화를 위한 단일설비 일정계획의 성능변동 분석 (Chaotic Behavior of a Single Machine Scheduling Problem with an Expected Mean Flow Time Measure)

  • 주운기
    • 한국경영과학회지
    • /
    • 제41권1호
    • /
    • pp.87-98
    • /
    • 2016
  • A single machine scheduling problem for jobs with stochastic processing time is considered in this study. Shortest processing time (SPT) sequencing according to the expected processing times of jobs is optimal for schedules with minimal expected mean flow time when all the jobs arrive to be scheduled and their expected processing times are known. However, SPT sequencing according to the expected processing time may not be optimal for the minimization of the mean flow time when the actual processing times of jobs are known. This study evaluates the complexity of SPT sequencing through a comparison of the mean flow times of schedules based on the expected processing times and actual processing times of randomly generated jobs. Evaluation results show that SPT sequencing according to the expected flow time exhibits chaotic variation to the optimal mean flow time. The relative deviation from the optimal mean flow time increases as the number of jobs, processing time, or coefficient of variation increases.

로트 스트리밍 흐름공정 일정계획의 스트레치 최소화 (On Lot-Streaming Flow Shops with Stretch Criterion)

  • 윤석훈
    • 산업경영시스템학회지
    • /
    • 제37권4호
    • /
    • pp.187-192
    • /
    • 2014
  • Lot-streaming is the process of splitting a job (lot) into sublots to allow the overlapping of operations between successive machines in a multi-stage production system. A new genetic algorithm (NGA) is proposed for an n-job, m-machine, lot-streaming flow shop scheduling problem with equal-size sublots in which the objective is to minimize the total stretch. The stretch of a job is the ratio of the amount of time the job spent before its completion to its processing time. NGA replaces the selection and mating operators of genetic algorithms (GAs) by marriage and pregnancy operators and incorporates the idea of inter-chromosomal dominance and individuals' similarities. Extensive computational experiments for medium to large-scale lot-streaming flow-shop scheduling problems have been conducted to compare the performance of NGA with that of GA.

Tire Industry and Its Manufacturing Configuration

  • Lee, Young-Sik;Cpim;Lee, Jin-Kyu
    • 한국경영과학회:학술대회논문집
    • /
    • 대한산업공학회/한국경영과학회 2000년도 춘계공동학술대회 논문집
    • /
    • pp.135-138
    • /
    • 2000
  • This paper is intended to propose what manufacturing configuration (manufacturing planning and shop floor control) is suitable for the tire industry. Basically tire-manufacturing process is mixed-products, parallel-disconnected-flow-shop. Both throughput time and cycle tine are very short, the variety of tires is very high, the setup time is long, shop floor data reporting requirements is high, and there are many equipments and people working. And with no exception, tire industry also now confronts increasing requirements of delivery conformance with the above peculiar characteristics of tire manufacturing and changing market environments, this paper suggests, weekly master scheduling with no MRP is desirable and traditional kanban is right selection for shop floor control/scheduling. This paper describes why this configuration should be, using the manufacturing engineering principles and some new insights like four primitives of parallel flow shop. Generally known that shop with high parallel-product-mix and long setup time isn't good candidate for kanban. The four primitives of parallel flow shop explain why kanban is also useful scheduling technique in that environment.

  • PDF

A Minimal Power Scheduling Algorithm for Low Power Circuit Design

  • Lin, Chi-Ho
    • 대한전자공학회:학술대회논문집
    • /
    • 대한전자공학회 2002년도 ITC-CSCC -1
    • /
    • pp.212-215
    • /
    • 2002
  • In this paper, we present an intermediate representation CDFG(Control Data Flow Graph) and an efficient scheduling technique for low power circuit design. The proposed CDFG represents control flow, data dependency and such constraints as resource constraints and timing constraints. In the scheduling technique, the constraints are substituted by subgraphs, and then the number of subgraphs is minimized by using the inclusion and overlap relation efficiently. Also, iterative rescheduling process are performed in a minimum bound estimation, starting with the as soon as possible as scheduling result, so as to reduce the power consumption in low power design. The effectiveness of the proposed algorithm has been proven by the experiment with the benchmark examples.

  • PDF

MRP와 JIT에 부합하는 DBR 제약일정계획문제 해법 (Solution of the Drum-Buffer-Rope Constraint Scheduling Problems incorporated by MRP/JIT -)

  • 김진규
    • 산업경영시스템학회지
    • /
    • 제23권59호
    • /
    • pp.21-36
    • /
    • 2000
  • The drum-buffer-rope(DBR) system is a finite scheduling mechanism that balances the flow of the production system. DBR controls the flow of materials through the plant in order to produce products in accordance with market demand, with a minimum of manufacturing lead time, inventory, and operating expenses. This paper integrates the best of MRP push system and JIT pull system with DBR system, efficiently adapts these logics to capacity constraint resources, and contributes to the evolution of synchronous manufacturing. The purpose of this paper is, thus, threefold. The first objective is to identify the frame of theory of constraints(TOC) and the logic of DBR scheduling. The second objective is to formulate the DBR constraint scheduling problems(DBRCSP) in a job shop environments. Finally, the paper is to suggest the solution procedure of DBRCSP for embedding TOC into MRP/JIT along with an numerical expression. In addition, illustrative numerical example is given.

  • PDF