Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.
Journal of the Korean Society of Hazard Mitigation
/
v.3
no.3
s.10
/
pp.165-171
/
2003
An abnormal storm by the typhoon of RUSA in 2002th year was broken out with tremendous flood demages and inundations on the basin of Chogangcheon located in the upper middle part of Guem river's upstream. This flood could not be engaged because it was so big that the stage engaging Songcheon station stuck to Songcheon bridge was destroyed by submerging. In this study the quantity of the flood was calculated by use of Manning's equation and suitable roughness coefficient was suggested.
EAP, which is operated on the frame of Risk Alarm 4-stage of National Risk Management Guideline, is a critical method in order to promptly respond to disasters. Korea Flood Control Office issues major and moderate flood alarm at each river station by respectively 50% and 70% of design flood discharge in terms of watermark or sea level, however, the criteria deciding major and moderate floods are vague for field managers to control the disaster situations. On the other hand, Japan and USA use river water level as a main criterion in order to classify the stage of flood disaster, which is higher design flood level than Korea. Thus, the authors analyzed domestic and oversea EAP guidelines and suggested improved criteria showing easy display method and raising the criteria of flood level for reflecting more effective action plans through testing a simulation training on the test-bed.
One of the techniques to determine flood stages in natural channel is to find the solution of unsteady flow equations such as continuity and momentum equations. Since the exact analytic solution of these equations are not Known, the implicit numerical scheme is widely accepted tool for the approximate solution of equations. This technique is applied to the downstream of Daechung Dam in Geum River for the determination of flood stage for given frequency. However the flood stages are greatly affected by the method of reservoir Operation Method and Technical Operation Reservoir Method. Obviously, the Tech. ROM is found to be superior to Auto ROM.
In this study, SWMM model is used to reproduce the main storm sewer system located in the Nae-Hang drainage basin of the Mokpo city and keep track of flood discharge. Given the outlet of the reaches border the coastline, this paper has taken the dual-drainage approach to perform inundation simulation, considering both the overflows and inflows at the manholes of the sewer system, and at the same time, taking the impacts of tidal stage into consideration. The following conclusions are reached in this study: First, when planning lowland sewer system alongside the coastline or the riverside, the tidal stage or flood stage need to be considered in the planning and design processes. Second, an analysis that fails to consider overflow and inundation at the manholes may overestimate inundation depth of the flooded area. In other words, in order to estimate flood discharge and flood stage in a lowland storm sewer system, it is desirable to analyze the conveyance capacity of storm sewer system and simulate overflow and inundation at the manholes at the same time.
Due to the difficulties for measuring flood discharge in the dangerous field conditions, conventional instruments with relatively low accuracy such as float still have been widely utilized for the field survey. It is also limited to use simple stage-discharge relationship for assessment of the flood discharge, since the stage-discharge relationship during the flood becomes complicated loop shape. In recent years, various non-intrusive velocity measurement techniques such as electromagnetic wave or surface images have been developed, which is quite adequate for the flood discharge measurements. However, these new non-intrusive techniques have little tested in the flood condition, though they promised efficiency and accuracy. Throughout the field observations, we evaluated the validity of these techniques by comparing discharge and velocity measurements acquired concurrently during the flood in a mountain stream. As a result, the flood discharge measurements between electromagnetic wave and surface image processing techniques showed high positive relationship, but velocities did not matched very well particularly for the high current speed more 3 m/s. Therefore, it should be noted here that special cares are required when the velocity measurements by those two different techniques are used, for instance, for the validation of the numerical models. In addition, authors assured that, for the more accurate flood discharge measurements, velocity observation as well as stage height is strongly necessary owing that the unsteady flow occurs during the flood.
Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.
Journal of the Korean Society of Hazard Mitigation
/
v.9
no.1
/
pp.151-158
/
2009
Many people have been suffering and loosing their property from inundation due to concentrated rain and massive storm. Although, river banks are strengthened and pumping stations are constructed to protect the life and property of people, the flood damages (disaster)could not be controlled, in fact it is increasing. In USA, CWMS (Corps Water Management System) has very good system of integration of study of rainfall data, computation of stream stage and simulation of flood damages, but there is lack of this type of study and analysis in the domestic context, so we have been facing many difficulties in simulation of flood damages. Therefore, a systematic collecting of data analysis and evaluation of flood damages is necessary. The main objective of this study is to suggest a systematic data collection and evaluation method, which could be useful to prevent the life and property from unusual damages. In this study, the system (Flood Damage Evaluation Model; K-FDEM) is proposed to evaluate the flood damages from rainfall with considering many field parameters.
Proceedings of the Korea Contents Association Conference
/
2009.05a
/
pp.432-436
/
2009
Recently, damage of flood is increased because of a short of time of concentration by development and a rise in runoff discharge by frequently heavy rain. The increase of runoff discharge is resulted in not only rise of water level but also damage of lives and property around river. Therefore, it is should be the first to estimate the exact runoff discharge. And based on the estimated flood discharge, flood damage is prevented by estimating inundated area of flood. In this study, flood stage is forecasted using HEC-HMS and HEC-RAS for Namdae-stream. The peak discharges were determinated by probability rainfall with the return period. The peak discharges obtained from HEC-HMS were inputted boundary conditions for the channel routing. Flood stages were evaluated using HEC-RAS.
Kim, Jihye;Kwak, Jihye;Jun, Sang Min;Lee, Sunghack;Kang, Moon Seong
Journal of The Korean Society of Agricultural Engineers
/
v.65
no.6
/
pp.23-35
/
2023
In this study, we developed a method to determine the flood-limited water levels of agricultural reservoirs, considering both their irrigation and flood control functions. Irrigation safety and flood safety indices were defined to be applied to various reservoirs, allowing for a comprehensive assessment of the irrigation and flood control properties. Seasonal flood-limited water level scenarios were established to represent the temporal characteristics of rainfall and agricultural water supply and the safety indices were analyzed according to these scenarios. The optimal scenarios were derived using a schematic solution based on Pareto front analysis. The method was applied to Obong, Yedang, and Myogok reservoirs, and the results showed that the characteristics of each reservoir were well represented in the safety indices. The irrigation safety of Obong reservoir was found to be significantly influenced by the late-stage flood-limited water level, while those of Yedang and Myogok reservoir were primarily affected by the early and mid-stage flood-limited water levels. The values of irrigation safety and flood safety indices for each scenario were plotted as points on the coordinate plane, and the optimal flood-limited water levels were selected from the Pareto front. The storage ratio of the optimal flood-limited water levels for the early, mid, and late stages were 65-70%, 70%, and 75% for Obong reservoir, 75%, 70-75%, and 65-70% for Yedang reservoir, and 75-80%, 70%, and 50% for Myogok reservoir. We expect that the method developed in this study will facilitate efficient reservoir operations.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.