• Title/Summary/Keyword: Flood stage

Search Result 250, Processing Time 0.025 seconds

Effect of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam

  • Jun, Byoung-Ho;Shin, Hyun-Suk;Yoon, Jae-Young
    • Korean Journal of Hydrosciences
    • /
    • v.5
    • /
    • pp.17-31
    • /
    • 1994
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in the country. The other is the DWOPER(Dynamic Wave Operational Model) package conducted on four different scenarios: (1) before the construction of the Keumkangsan-Dam and the Peace-Dam; (2) the exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam); (3) the exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam) ; (4) the exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the Hwachun-Dam need to be modified.

  • PDF

Calculation of Abnormality Large Flood Discharge Destroying the Songcheon Stage Guaging Station by the RUSA in 2002th Year (2002년 루사로 인하여 송천 수위국을 붕괴시킨 이상 홍수량의 규모 결정)

  • Yoo, Ju-Hwan;Kim, Joo-Cheol
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.3 no.3 s.10
    • /
    • pp.165-171
    • /
    • 2003
  • An abnormal storm by the typhoon of RUSA in 2002th year was broken out with tremendous flood demages and inundations on the basin of Chogangcheon located in the upper middle part of Guem river's upstream. This flood could not be engaged because it was so big that the stage engaging Songcheon station stuck to Songcheon bridge was destroyed by submerging. In this study the quantity of the flood was calculated by use of Manning's equation and suitable roughness coefficient was suggested.

Improvement of National Risk Alarm 4-Stage Criteria for Flood Disaster (홍수재난 대응을 위한 국가위기경보 4단계 설정기준 개선)

  • Lee, Sookyong;Park, Jae-Woo;Oh, Eun-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.3
    • /
    • pp.369-377
    • /
    • 2018
  • EAP, which is operated on the frame of Risk Alarm 4-stage of National Risk Management Guideline, is a critical method in order to promptly respond to disasters. Korea Flood Control Office issues major and moderate flood alarm at each river station by respectively 50% and 70% of design flood discharge in terms of watermark or sea level, however, the criteria deciding major and moderate floods are vague for field managers to control the disaster situations. On the other hand, Japan and USA use river water level as a main criterion in order to classify the stage of flood disaster, which is higher design flood level than Korea. Thus, the authors analyzed domestic and oversea EAP guidelines and suggested improved criteria showing easy display method and raising the criteria of flood level for reflecting more effective action plans through testing a simulation training on the test-bed.

Flood Stage Determination by Implicit Nymerical Technique (부정류 해석에 의한 금강하류부 홍수위결정)

  • 선우중호
    • Water for future
    • /
    • v.16 no.2
    • /
    • pp.123-129
    • /
    • 1983
  • One of the techniques to determine flood stages in natural channel is to find the solution of unsteady flow equations such as continuity and momentum equations. Since the exact analytic solution of these equations are not Known, the implicit numerical scheme is widely accepted tool for the approximate solution of equations. This technique is applied to the downstream of Daechung Dam in Geum River for the determination of flood stage for given frequency. However the flood stages are greatly affected by the method of reservoir Operation Method and Technical Operation Reservoir Method. Obviously, the Tech. ROM is found to be superior to Auto ROM.

  • PDF

Inundation simulation in a urban drainage basin considering tidal stage effect (조위의 영향을 고려한 도심지 배수유역에서의 범람모의)

  • Kim, Dae Geun;Choi, Kyung Soon;Koh, Young Chan
    • Journal of Korean Society of Water and Wastewater
    • /
    • v.23 no.6
    • /
    • pp.711-717
    • /
    • 2009
  • In this study, SWMM model is used to reproduce the main storm sewer system located in the Nae-Hang drainage basin of the Mokpo city and keep track of flood discharge. Given the outlet of the reaches border the coastline, this paper has taken the dual-drainage approach to perform inundation simulation, considering both the overflows and inflows at the manholes of the sewer system, and at the same time, taking the impacts of tidal stage into consideration. The following conclusions are reached in this study: First, when planning lowland sewer system alongside the coastline or the riverside, the tidal stage or flood stage need to be considered in the planning and design processes. Second, an analysis that fails to consider overflow and inundation at the manholes may overestimate inundation depth of the flooded area. In other words, in order to estimate flood discharge and flood stage in a lowland storm sewer system, it is desirable to analyze the conveyance capacity of storm sewer system and simulate overflow and inundation at the manholes at the same time.

Comparison of Flood Discharge and Velocity Measurements in a Mountain Stream Using Electromagnetic Wave and Surface Image (전자파와 수표면 영상을 이용한 산지하천 홍수유량 및 유속 계측 비교 연구)

  • Yang, Sung-Kee;Kim, Dong-Su;Yu, Kwon-Kyu;Kang, Meyong-Su;Jung, Woo-Yul;Lee, Jun-Ho;Kim, Yong-Seok;You, Ho-Jun
    • Journal of Environmental Science International
    • /
    • v.21 no.6
    • /
    • pp.739-747
    • /
    • 2012
  • Due to the difficulties for measuring flood discharge in the dangerous field conditions, conventional instruments with relatively low accuracy such as float still have been widely utilized for the field survey. It is also limited to use simple stage-discharge relationship for assessment of the flood discharge, since the stage-discharge relationship during the flood becomes complicated loop shape. In recent years, various non-intrusive velocity measurement techniques such as electromagnetic wave or surface images have been developed, which is quite adequate for the flood discharge measurements. However, these new non-intrusive techniques have little tested in the flood condition, though they promised efficiency and accuracy. Throughout the field observations, we evaluated the validity of these techniques by comparing discharge and velocity measurements acquired concurrently during the flood in a mountain stream. As a result, the flood discharge measurements between electromagnetic wave and surface image processing techniques showed high positive relationship, but velocities did not matched very well particularly for the high current speed more 3 m/s. Therefore, it should be noted here that special cares are required when the velocity measurements by those two different techniques are used, for instance, for the validation of the numerical models. In addition, authors assured that, for the more accurate flood discharge measurements, velocity observation as well as stage height is strongly necessary owing that the unsteady flow occurs during the flood.

Influence of the Peace-Dam Construction on the Flood Discharge and the Flood Stage of the Hwachun-Dam (화천댐의 홍수량 및 수위에 미치는 평화댐의 영향 분석)

  • 전병호;신현석;이재철;윤용남
    • Water for future
    • /
    • v.26 no.1
    • /
    • pp.93-101
    • /
    • 1993
  • Because of the Keumkangsan-Dam and the Peace-Dam constructed in recent years, it is expected that the peak flood discharge and the peak flood stage at the Hwachun-Dam site have been changed. In this study, two methods were used to simulate and compare the effects of the upstream dam construction on the change of the discharge and the stage. One is the storage function method widely used for the hydrological routing in this country. The other is the DWOPER (Dynamic Wave Operational Model) package developed by the U.S. NWS for the hydraulic routing. Flood routing simulations have been performed on four different scenarios:1) Before the construction of the Keumkangsan-Dam and the peace-Dam, 2) The exclusion of the Keumkangsan-Dam watershed (before the construction of the Peace-Dam), 3) The exclusion of the Keumkangsan-Dam watershed (after the construction of the Peace-Dam), 4) The exclusion of the Peace-Dam watershed. The results of the four test cases from the two methods show that the peak flood discharge and the peak flood stage at the Hwachun-Dam site are reduced due to the construction of the Peace-Dam. From these findings, it is suggested that the operational criteria for the optimal dam-operation of the hwachun-Dam need to be modified.

  • PDF

Evaluation System of Flood Damages using Stream Stage (하천수위에 의한 침수피해 평가 시스템)

  • Kim, Jong-Soon;Lee, Young-Dai;Oh, Kook-Yul
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.9 no.1
    • /
    • pp.151-158
    • /
    • 2009
  • Many people have been suffering and loosing their property from inundation due to concentrated rain and massive storm. Although, river banks are strengthened and pumping stations are constructed to protect the life and property of people, the flood damages (disaster)could not be controlled, in fact it is increasing. In USA, CWMS (Corps Water Management System) has very good system of integration of study of rainfall data, computation of stream stage and simulation of flood damages, but there is lack of this type of study and analysis in the domestic context, so we have been facing many difficulties in simulation of flood damages. Therefore, a systematic collecting of data analysis and evaluation of flood damages is necessary. The main objective of this study is to suggest a systematic data collection and evaluation method, which could be useful to prevent the life and property from unusual damages. In this study, the system (Flood Damage Evaluation Model; K-FDEM) is proposed to evaluate the flood damages from rainfall with considering many field parameters.

Estimation of Flood Discharge and Forecasting of Flood Stage in Small-Medium Urban Basin (중소도시유역의 홍수량산정 및 홍수위 예측)

  • Kim, min-jeong;Kim, byeong-chan;Lee, jong-seok
    • Proceedings of the Korea Contents Association Conference
    • /
    • 2009.05a
    • /
    • pp.432-436
    • /
    • 2009
  • Recently, damage of flood is increased because of a short of time of concentration by development and a rise in runoff discharge by frequently heavy rain. The increase of runoff discharge is resulted in not only rise of water level but also damage of lives and property around river. Therefore, it is should be the first to estimate the exact runoff discharge. And based on the estimated flood discharge, flood damage is prevented by estimating inundated area of flood. In this study, flood stage is forecasted using HEC-HMS and HEC-RAS for Namdae-stream. The peak discharges were determinated by probability rainfall with the return period. The peak discharges obtained from HEC-HMS were inputted boundary conditions for the channel routing. Flood stages were evaluated using HEC-RAS.

  • PDF

Determination of Flood-limited Water Levels of Agricultural Reservoirs Considering Irrigation and Flood Control (농업용 저수지의 이·치수 기능을 고려한 홍수기 제한수위 설정 기법 개발)

  • Kim, Jihye;Kwak, Jihye;Jun, Sang Min;Lee, Sunghack;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.6
    • /
    • pp.23-35
    • /
    • 2023
  • In this study, we developed a method to determine the flood-limited water levels of agricultural reservoirs, considering both their irrigation and flood control functions. Irrigation safety and flood safety indices were defined to be applied to various reservoirs, allowing for a comprehensive assessment of the irrigation and flood control properties. Seasonal flood-limited water level scenarios were established to represent the temporal characteristics of rainfall and agricultural water supply and the safety indices were analyzed according to these scenarios. The optimal scenarios were derived using a schematic solution based on Pareto front analysis. The method was applied to Obong, Yedang, and Myogok reservoirs, and the results showed that the characteristics of each reservoir were well represented in the safety indices. The irrigation safety of Obong reservoir was found to be significantly influenced by the late-stage flood-limited water level, while those of Yedang and Myogok reservoir were primarily affected by the early and mid-stage flood-limited water levels. The values of irrigation safety and flood safety indices for each scenario were plotted as points on the coordinate plane, and the optimal flood-limited water levels were selected from the Pareto front. The storage ratio of the optimal flood-limited water levels for the early, mid, and late stages were 65-70%, 70%, and 75% for Obong reservoir, 75%, 70-75%, and 65-70% for Yedang reservoir, and 75-80%, 70%, and 50% for Myogok reservoir. We expect that the method developed in this study will facilitate efficient reservoir operations.