• Title/Summary/Keyword: Flood level

Search Result 759, Processing Time 0.025 seconds

Reservoir Operation by Variable Restricted Water Level during Flood Period (홍수기중 가변제한수위에 의한 저수지 운영)

  • Sim, Myeong-Pil;Gwon, O-Ik;Lee, Hwan-Gi
    • Water for future
    • /
    • v.28 no.6
    • /
    • pp.217-228
    • /
    • 1995
  • For optimal reservoir operation during flood period, a general and systematic policy is suggested to make balance of the conflicting purposes between water conservation and flood control. The purpose of this study is to decide the restricted water level of the reservoir during flood period specially to meet water demand in non-flood period. The optimal policy is derived by reallocation of storage capacity through the application of variable restricted water level(VRWL) and minimum required water level(MRWL) for shorter intervals. This study also suggests water level dconditions to secure conservation storage capacity at the end of the flood period estimated by reservoir operation study. This paper illustrates an application of the Daecheong Dam and Chungju Dam respectively during flood and the results are reviewed.

  • PDF

Flood control analysis of the sea dike at estuary. (하구방조제의 홍수조절 해석)

  • 서승덕
    • Water for future
    • /
    • v.10 no.2
    • /
    • pp.113-124
    • /
    • 1977
  • Alone the southwesten coast of Korean peninsula, the extensive available arable acreages suited for forming are found in the development of tidal flats in the geographically curved bays with a motable tidal emplitude. It was found that the developments of these tidal flats cover an estimated area more than 276,000ha. In this paper, a flood control system by Pul's Storage Indication Method and Pul's Graphical Method at Return Periods-50 yrs, design rainfall-267mm per 48hrs and design flood-926c.m.s. and at 0.2meter control height above the High Water Ordinary Spring Tide Level (+11.0m) was studied. At the result, the flood demage in the reservoir at Return Periods-50 yrs and the tidal level at H.W.O.S.T.L. were satisfied to the below E.L. 11.20m (Flood Level in the reservoir). Well skilled flood control technique and management and control of draining sluice gate should be required for the disaster prevention from the flood and tide damage.

  • PDF

Investigation and Complementary Measures Establishment for Flood on Tidal Reclaimed Paddy Fields (간척지 논 침수 원인 조사와 방재 대책 수립)

  • Jeong, Ju-Hong;Yoon, Kwang-Sik;Choi, Soo-Myung;Yoon,, Suk-Gun;Go, Young-Bae;Kim, Young-Taek
    • KCID journal
    • /
    • v.17 no.2
    • /
    • pp.105-114
    • /
    • 2010
  • Tidal land reclamation provided water resources and land for agriculture and contributed stable crop production. However, climate change by global warming disrupts the hydrologic circulatory system of the earth resulting in sea level rise and more frequent flood for reclaimed arable land. Recently, Suyu reclaimed paddy field in Jindo-gun experienced prolonged inundation after heavy rainfall and there is a growing risk of flood damage. Onsite survey and flood analysis using GATE_Pro model of Korea Rural Corporation were conducted to investigate causes of flooding. To perform the analysis, input data such as inflow hydrograph, the lowest elevation of paddy field, neap tide level, management level of Gunnae estuary lake at the time of the flood were collected. Flood analysis confirmed that current drainage facilities are not enough to prevent 20year return period flood. The result of analysis showed flooding more than 24hours. Therefore, flood mitigation alternatives such as sluice gate expansion, installation drainage pumping station, refill paddy land, and catch canal were studied. Replacing drainage culvert of Suyu dike to sluice gate and installing drainage pumping station at the Gunne lake were identified as an effective flood control measures. Furthermore, TM/TC (SCADA) system and expert for gate management are required for the better management of drainage for estuary dam and flood mitigation.

  • PDF

Flood Forecasting Study using Neural Network Theory and Hydraulic Routing (신경망 이론과 수리학적 홍수추적에 의한 홍수예측에 관한 연구)

  • Jee, Hong Kee;Choo, Yeon Moon
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.2
    • /
    • pp.207-221
    • /
    • 2014
  • Recently, due to global warming, climate change has affected short time concentrated local rain and unexpected heavy rain which is increasingly causing life and property damage. Therefore, this paper studies the characteristic of localized heavy rain and flash flood in Nakdong basin study area by applying Data Mining method to predict flood and constructing water level predicting model. For the verification neural network from Data Mining method and hydraulic flood routing was used for flood from July 1989 to September 1999 in Nakdong point and Iseon point was used to compare flood level change between observed water level and SAM (Slope Area Method). In this research, the study area was divided into three cases in which each point's flood discharge, water level was considered to construct the model for hydraulic flood routing and neural network based on artificial intelligence which can be made from simple input data used for comparison analysis and comparison evaluation according to actual water level and from the model.

Analysis for the Effect of Channel Contraction for Sedimentation Reduction on the Flood Level and Bed Changes in the Lower Nakdong River (낙동강 하류의 퇴사저감을 위한 하폭축소방법이 홍수위변화 및 하상변동에 미치는 영향 분석)

  • Jang, Eun-Kyung;Ji, Un
    • Journal of Environmental Science International
    • /
    • v.22 no.3
    • /
    • pp.291-301
    • /
    • 2013
  • Sediment from the upstream channel has been deposited near the Nakdong River Estuary Barrage (NREB) due to the mild slope and decreased velocity. The annual mechanical dredging to ensure the flood capacity has been performed to remove the deposited sediment. However, the dredging method is not considered as an effective countermeasure due to high cost and long time to operate. Therefore, many methods for sedimentation reduction have been proposed for NREB. Especially, the channel contraction method to mitigate sedimentation problem by changing the channel geometry from 2 km to 3 km upstream of NREB has been recently suggested as an effective countermeasure. However, there is the possibility that the channel contraction method induces flood level increase compared to original condition. Therefore, it is necessary to investigate quantitatively the flood level changes in the upstream and downstream section due to the channel contraction method for NREB. In this study, water level changes by 10% channel contraction of whole width has been evaluated using the HEC-RAS model and simulated with and without channel contraction for various flood discharge. As a result, water level in the section where the channel was contracted was decreased by 0.02 m and flood level at the upstream of channel contracted was increased up to 0.015 m for the 500-year flood.

Plan for Flood Control Linked with Dam and River Basin (댐과 하천유역을 연계한 홍수 대응 방안 - 2020년 섬진강 홍수사상을 대상으로 -)

  • Kyong Oh Baek;Dong Yeol Lee
    • Journal of the Korean Society of Safety
    • /
    • v.38 no.2
    • /
    • pp.81-86
    • /
    • 2023
  • In this study, a one-dimensional numerical model was constructed to propose a flood control plan linked with the dam and river basin for the flood events of the Seomjin River in 2020. The flood level reduction of the downstream river was tested based on a scenario operation of the Seomjingang Dam and was also analyzed when a storage pocket was newly constructed as one of the river basin measures. It was confirmed that Seomjingang Dam's flood control capacity would be increased if the flood limit level was drastically lowered from the current EL. 196.5 m to EL. 188.0 m. In addition, if the upper area of the (old) Geumgok Bridge (which suffered great damage due to the loss of the levee) is used as a storage pocket, it would be effective in preventing floods in the lower area of it. In the era of the climate crisis, more integrated flood management is needed and basic river management must be observed.

Determination of Flood-limited Water Levels of Agricultural Reservoirs Considering Irrigation and Flood Control (농업용 저수지의 이·치수 기능을 고려한 홍수기 제한수위 설정 기법 개발)

  • Kim, Jihye;Kwak, Jihye;Jun, Sang Min;Lee, Sunghack;Kang, Moon Seong
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.65 no.6
    • /
    • pp.23-35
    • /
    • 2023
  • In this study, we developed a method to determine the flood-limited water levels of agricultural reservoirs, considering both their irrigation and flood control functions. Irrigation safety and flood safety indices were defined to be applied to various reservoirs, allowing for a comprehensive assessment of the irrigation and flood control properties. Seasonal flood-limited water level scenarios were established to represent the temporal characteristics of rainfall and agricultural water supply and the safety indices were analyzed according to these scenarios. The optimal scenarios were derived using a schematic solution based on Pareto front analysis. The method was applied to Obong, Yedang, and Myogok reservoirs, and the results showed that the characteristics of each reservoir were well represented in the safety indices. The irrigation safety of Obong reservoir was found to be significantly influenced by the late-stage flood-limited water level, while those of Yedang and Myogok reservoir were primarily affected by the early and mid-stage flood-limited water levels. The values of irrigation safety and flood safety indices for each scenario were plotted as points on the coordinate plane, and the optimal flood-limited water levels were selected from the Pareto front. The storage ratio of the optimal flood-limited water levels for the early, mid, and late stages were 65-70%, 70%, and 75% for Obong reservoir, 75%, 70-75%, and 65-70% for Yedang reservoir, and 75-80%, 70%, and 50% for Myogok reservoir. We expect that the method developed in this study will facilitate efficient reservoir operations.

Improvement of National Risk Alarm 4-Stage Criteria for Flood Disaster (홍수재난 대응을 위한 국가위기경보 4단계 설정기준 개선)

  • Lee, Sookyong;Park, Jae-Woo;Oh, Eun-Ho
    • The Journal of the Korea Contents Association
    • /
    • v.18 no.3
    • /
    • pp.369-377
    • /
    • 2018
  • EAP, which is operated on the frame of Risk Alarm 4-stage of National Risk Management Guideline, is a critical method in order to promptly respond to disasters. Korea Flood Control Office issues major and moderate flood alarm at each river station by respectively 50% and 70% of design flood discharge in terms of watermark or sea level, however, the criteria deciding major and moderate floods are vague for field managers to control the disaster situations. On the other hand, Japan and USA use river water level as a main criterion in order to classify the stage of flood disaster, which is higher design flood level than Korea. Thus, the authors analyzed domestic and oversea EAP guidelines and suggested improved criteria showing easy display method and raising the criteria of flood level for reflecting more effective action plans through testing a simulation training on the test-bed.

A Method to Determine the Purchasing Limits of Reservior Flooding Area by Rainfall Data Hydrologric Estimation (강우기록 및 수문계획에 의한 정수지수설지의 용지 현수험 결정방법)

  • 김주영
    • Magazine of the Korean Society of Agricultural Engineers
    • /
    • v.11 no.3
    • /
    • pp.1742-1748
    • /
    • 1969
  • This is a method to determine the boundary line of reservoir flooding area which will be purchased. Until now, flood water level was used as the boundary line. By lowering this line from flood water level, purchasing cost of reservoir flooding area can be cut down. Sometimes, temporary flooding of arable land outside the boundary occurs. During the life of reservoir, flood damage to crop product on of this land must be indemified with net berefit from arable land between the bovndary line and normal water level. Following is the basic formula to determine the line. (Estimated flood damage to crop production of land outside the boundary line $\leqq$ Estimated net beneift from land between the boundary line and normal water level.) Minimum difference between both sides is needed to minimize the purchasing area. Flood damage and net benefit are estimated by hydrologic estimation with rainfall data and crop production estimation.

  • PDF

Sensitivity Analysis on Flood Level Changes by Offline Storage Creation Based on Unsteady Flow Modeling (부정류 모의 기반 오프라인 저류지 조성에 따른 홍수위 변화 민감도 분석)

  • Eun-kyung Jang;Un Ji;Sanghyeok Kim;Jiwon Ryu
    • Ecology and Resilient Infrastructure
    • /
    • v.10 no.4
    • /
    • pp.217-225
    • /
    • 2023
  • This study analyzed the effect of flood level reduction in the case of creating and operating offline storage for the Jangdong district, which can be used as a flood buffer space for the Geumgang River, through one-dimensional unsteady flow numerical simulation. In particular, the sensitivity analysis of changes in the height and width (length) of transverse weirs on flood level changes was performed to provide quantitative information necessary for flood control facility (embankment) design. As a result of analyzing the flood control effect of the offline storage based on the peak flood discharge and level, spatially, the flood control effect at the planned flood buffer space site and the downstream end was confirmed, and it was confirmed that the flood reduction effect at the downstream occurred the most. By design conditions of the transverse overflow weir, the greatest flood reduction effect was found under the condition that the overflow weir height based on the 50-year frequency flood level and the transverse overflow weir width (length) of 125 m were considered. The effect of delaying the time to reach the maximum flood due to the operation of the offline storage site was also presented based on unsteady flow modeling.