Flood Control Operation of Soyang and Choongju Reservoirs by the Min-max DP (Min-Max DP에 의한 소양 및 충주호의 홍수조절운영)

  • 오영민;이길성
    • Water for future
    • /
    • v.19 no.4
    • /
    • pp.339-346
    • /
    • 1986
  • A real-time single reservoir operation model using the Min-max Dynamic Programming for the flood control of Soyanggang Dam and Choongju Dam is developed. The objective function is to minimize the maximum release from each dam and the constraints are those from ther reservoir and channel characteristics. Control and utilization efficiencies are used to measure the performance of the reservoir operation method (ROM). In comparison with those of simulation models(such as the Rigid ROM, the Technical ROM and the Linear Decision Rule), the efficiencies of the optimization model are superior for all return periods.

  • PDF

Growth Characteristics and Nutrient Contents under Dominant Submerged Plants in Flood Control Reservoir around Dongbok Lake (동복호 저수구역내 주요 침수 분포종별 생육 및 영양염류 함량)

  • Seo, Young-Jin;Lee, Jun-Bae;Seo, Dong-Cheol;Kang, Se-Won;Lee, Sang-Gyu;Choi, Ik-Won;Lim, Byung-Jin;Kim, Sang-Don;Heo, Jong-Soo;Cho, Ju-Sik
    • Korean Journal of Soil Science and Fertilizer
    • /
    • v.45 no.5
    • /
    • pp.836-841
    • /
    • 2012
  • Distributions and growth of submerged plants with water level were investigated in a flood control reservoir around Dongbok Lake. In adddition, the total amount of biomass and uptakes of plants per unit area ($m^2$) in the flood control reservoir were investigated. The total vegetation area was $156,871m^2$ in the Dongbok flood control reservoir ($209,160m^2$) before flooding. By July 11, the Dongbok flood control reservoir was flooded during rainy season except for upper area. Dominant plants were CRXDM (Carex dimorpholepis Steud), ECHCF (Echinochloa crusgalli), POLHY (Polygonum hydropiper L) and BROTE (Bromus tectorum L) which occupied 75% of the flood control reservoir. The total amounts of organic matter uptakes per unit area ($m^2$) with distribution rates by CRXDM, ECHCF, POLHY and BROTE under different submerged plants were 65.5, 6.8, 7.0 and 13.0%, respectively. The total amount of nitrogen uptakes per unit area ($m^2$) with distribution rates at different submerged plants were in the order of CRXDM ($1.30g\;m^{-2}$) > POLHY ($0.34g\;m^{-2}$) > BROTE ($0.30g\;m^{-2}$) > ECHCF ($0.25g\;m^{-2}$). The total amounts of phosphorus uptakes per unit area ($m^2$) with distribution rates at different submerged plants were great in the order of CRXDM (51.8%) > BROTE (17.7%) > POLHY (10.3%) > ECHCF (9.6%). Thus, the results of this study suggest that O.M, T-N and T-P by submerged plants in Dongbok Lake were strongly influenced at water quality in flood control reservoir.

Study of Operation Rules for Flood Control to Seomjin River Dam Using HEC-ResSim (HEC-ResSim을 이용한 섬진강댐의 홍수조절 운영룰에 관한 연구)

  • Ahn, Jung Min;Lyu, Siwan;Kim, Joo Cheol
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.2B
    • /
    • pp.93-101
    • /
    • 2012
  • HEC-ResSim, reservoir operation model, is applied to Seomjin river dam in order to establish a rational method for water supply and flood control by dam operation. In order to minimize downstream flood damage for Seomjin river basin and adjacent regions, reservoir routing is applied to several frequency flood events within the framework of rainy seasonal operation rule and then the characteristics change of hydrological behavior for the downstream of study area is investigated in depth. Its quantitative efficiency and estimation method is evaluated on the basis of the adjustment scheme of conservation water surface elevation for flood control and water secure; reservoir routing considering preliminary release and variable restricted water level; and its effect to water supply; and downstream flood-duration analysis.

Evaluation of Agricultural Reservoirs Operation Guideline Using K-HAS and Ratio Correction Factor during Flood Season (수리·수문설계시스템 및 비율보정계수 기법을 활용한 농업용 저수지의 홍수기 운영기준 평가)

  • Jung, Hyoung-mo;Lee, Sang-Hyun;Kim, Kyounghwan;Kwak, Yeong-cheol;Choi, Eunhyuk;Yoon, Sungeun;Na, Ra;Joo, Donghyuk;Yoo, Seung-Hwan;Yoon, Gwang-sik
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.63 no.4
    • /
    • pp.97-104
    • /
    • 2021
  • Despite the practical limitations of calculating the amount of inflow and supply related to the operation of agricultural reservoirs, the role of agricultural reservoirs is gradually being emphasized. In particular, as interest in disaster safety has increased, the demand for preliminary measures to prepare for disasters has been rising, for instance, pre-discharging agricultural reservoirs for flood control. The aim of this study is to analyze the plans for the flood season reservoir operation considering pre-discharge period and water level limit. Accordingly, we optimized the simulation of daily storage using the ratio correction factor (RCFs) and analyzed the amount of inflow and supply using K-HAS. In addition we developed the drought determination coefficient (k) as a indicator of water availability and applied it for supplementing the risk level criteria in the Drought Crisis Response Manual. The results showed that it would be difficult to set the water level limit during the flood period in the situation of little water supply for flood control in agricultural reservoirs. Therefore, it is necessary to operate the reservoir management regulations after measures such as securing additional storage water are established in the future.

Development of Reservoir Operation Model using Simulation Technique in Flood Season(II) (모의기법에 의한 홍수기 저수지 운영 모형 개발(II))

  • Sing, Yong-Lo;Maeng, Sung-Jin;Ko, Ick-Hwan;Lee, Hwan-Ki
    • Journal of Korea Water Resources Association
    • /
    • v.35 no.6
    • /
    • pp.797-805
    • /
    • 2002
  • The EV ROM, a joint reservoir operation model for flood control that accounts for the downstream flow condition, has been introduced in the preceding article (Shin et al, 2000). A joint reservoir operation model computer program for the Geum river basin, developed by FORTRAN Power Station 4.0 using the EV ROM, is hereby presented. Three case studies of flood control by joint operation of the Yongdam and Daechung Multipurpose Dams in the Geum river basin revealed that the performance of the EV ROM was superior to the existing Rigid ROM and Technical ROM. This is because the EV ROM can account for the downstream flow condition as well as the upstream inflow and the reservoir water level. In order to apply for various floods events in the future, consistent improvement of the developed EV ROM and efforts for more accurate rainfall prediction are required.

A Case Study on the Housing Development by Using the Space of Retarding Basin - Focused on the Tetsugakudo Kouen Collective Housing Development Project - (유수지 공간을 활용한 주거지개발 사례연구 -일본 철학당 공원(테츠가쿠도 코우엔) 주거단지 사례를 중심으로-)

  • Baek, Seung-Kwan;Kim, Young-Hoon
    • KIEAE Journal
    • /
    • v.15 no.1
    • /
    • pp.129-137
    • /
    • 2015
  • The purpose of this study is to analyze the Tetsugakudo Kouen Collective Housing Development Project in Japan. Project implemented cooperatively by the Tokyo Metropolitan Government in charge of river management, Shinjuku and Nakano-ku responsible for park management, and the UR, a housing project developer. This project set a significant precedent for three-dimensional river use by realizing the three-dimensional integrated development of a flood control reservoir, a park, and collective housing. The major effectiveness of this project can be summarized into four points. 1) The costs borne by individual project developers were significantly reduced by realizing a high degree of application and multipurpose use of the land through a joint project. 2) This project, which was designed to accommodate rainfall of 30 to 40mm per hour, is expected to contribute to reducing flood damage and generating significant investment effects, in terms of asset value in downstream areas, thereby increasing flood control security. 3) Local disaster prevention function were enhanced by providing an evacuation site in the case of an earthquake. 4) The living environment was improved by adding the function of a park.

A Model for Real-time Reservoir Operations during Flood Period I : Theory and Modeling (홍수기중의 실시간 저수지운영 모형(I) 이론과 모형화)

  • 심명필;선우중
    • Water for future
    • /
    • v.23 no.3
    • /
    • pp.373-384
    • /
    • 1990
  • The purposes of the reservoir operation during flood period are the reduction of the flood damage in the downstrem reaches and the conservation of flood control for the later use. This paper presents a model of simulation technique to determine the real-time operating rules on an hourly basis. The objective of strategy is to minimize the miximum release through the spillway gates with consideration of the uncertainties associated with the forecasted inflows. In this paper, a general procedure for solving this problem is described for a single and paralle reservoirs.

  • PDF

Characterization of Physical Properties of Turbid Flow in the Daecheong Reservoir Watershed dining Floods (홍수시 대청호 유역에 발생하는 탁수의 물리적 특성)

  • Chung, Se Woong;Lee, Heung Soo;Yoon, Sung Wan;Ye, Lyeong;Lee, Jun Ho;Choo, Chang Oh
    • Journal of Korean Society on Water Environment
    • /
    • v.23 no.6
    • /
    • pp.934-944
    • /
    • 2007
  • Fine suspended solids (SS) induced into a reservoir after flood events play important ecological and water quality roles by presenting persistent turbidity and attenuating light. Thus the origin and physical features must be characterized to understand their transport processes and associated impacts, and for the establishment of watershed based prevention strategies. This study was aimed to characterize the physical properties of the SS sampled from Daecheong Reservoir and its upstream rivers during flood events. Extensive field and laboratory experiments were carried out to identify the turbidity-SS relationships, particle size distributions, settling velocity, and mineral compositions of the SS. Results showed that the turbidity-SS relationships are site-specific depending on the locations and flood events in the system. The turbidity measured within the reservoir was much greater than that measured in the upstream rivers for the same SS value. The effective diameters ($D_{50}$) in the rivers were in the range of $13.3{\sim}54.3{\mu}m$, while those in the reservoir were reduced to $2.5{\sim}14.0{\mu}m$ due to a fast settling of large particles in the rivers. The major minerals consisting of the SS were found to be Illite, Muscovite, Albite, and Quartz both in the rivers and reservoir. Their apparent settling velocities at various locations in the reservoir were in the range of 0.06~0.13 m/day. The research outcome provides a fundamental information for the fine suspended particles that cause persistent turbidity in the reservoir, and can be used as basic parameters for modeling study to search watershed based optimal control measures.

An Evaluation of the Flood Control Effect according to the Hancheon Reservoir Operation (한천저류지 운영에 따른 홍수조절효과 평가)

  • Moon, Duk Chul;Jung, Kwan Sue;Park, Won Bae;Kim, Yong Cheol
    • Journal of Korea Water Resources Association
    • /
    • v.47 no.2
    • /
    • pp.107-117
    • /
    • 2014
  • Hancheon reservoir, which is located upstream of Jeju city, has been built for flood mitigation after Typhoon Nari, 2007. To verify flood mitigating effect of the this reservoir on the downstream area, runoff analysis based on the measured data (two stream discharge monitoring stations and inflow data to the reservoir) is carried out during torrential rain followed by typhoon Dainmu, 2010. The stream water level was recorded as 3.14 m for the peak at the down gradient station. The stream water level under the assumption of absence of Hancheon reservoir is calculated as 4.16 m using the estimated rating curve, stream water propagation velocity, and the bypassed volume of water to the reservoir. This result shows that clear effect of reservoir operation which is capable of mitigating peak discharge in the downstream area.