• Title/Summary/Keyword: Flood control reservoir

Search Result 180, Processing Time 0.037 seconds

A Study for Storage Reallocation of Multipurpose Reservoir(II) - Conservation Storage Analysis (다목적댐 용량 재할당에 대한 연구(II)- 이수용량 분석)

  • Yi, Jae-Eung;Kwon, Yong-Ik
    • Journal of Korea Water Resources Association
    • /
    • v.37 no.4
    • /
    • pp.283-292
    • /
    • 2004
  • In the past, it was unnecessary to consider the reallocation of reservoir storage because new reservoir construction was relatively not difficult. However, it became necessary since it is so difficult to construct new reservoirs in these days. In this study, the change of the water supply capability is evaluated through conservation storage drawdown frequency analysis, hydropower analysis, reliability, resiliency and vulnerability analyses for Geum River basin. As a result, it is confirmed that water supply capability of Daechung reservoir can be increased by reallocating flood control storage to conservation storage.

Evaluation of estuary reservoir management based on robust decision making considering water use-flood control-water quality under Climate Change (이수-치수-수질을 고려한 기후변화 대응 로버스트 기반 담수호 관리 평가)

  • Kim, Seokhyeon;Hwang, Soonho;Kim, Sinae;Lee, Hyunji;Kwak, Jihye;Kim, Jihye;Kang, Moonseong
    • Journal of Korea Water Resources Association
    • /
    • v.56 no.6
    • /
    • pp.419-429
    • /
    • 2023
  • The objective of this study was to determine the management water level of an estuary reservoir considering three aspects: the water use, flood control and water quality, and to use a robust decision-making to consider uncertainty due to climate change. The watershed-reservoir linkage model was used to simulate changes in inflow due to climate change, and changes in reservoir water level and water quality. Five management level alternatives ranging from -1.7 El.m to 0.2 El.m were evaluated under the SSP1, 2, 3, and 5 scenariosof the ACCESS-CM2 Global Climate Model. Performance indicators based on period-reliability were calculated for robust decision-making considering the three aspects, and regret was used as a decision indicator to identify the alternatives with the minimum maximum regret. Flood control failure increased as the management level increased, while the probability of water use failure increased as the management level decreased. The highest number of failures occurred under the SSP5 scenario. In the water quality sector, the change in water quality was relatively small with an increase in the management level due to the increase in reservoir volume. Conversely, a decrease in the management level resulted in a more significant change in water quality. In the study area, the estuary reservoir was found to be problematic when the change in water quality was small, resulting in more failures.

Reservoir Routing in Estuary Lake Influenced by Tidal Effects (조석 영향을 받는 하구호에서의 저수지추적)

  • Kim, Joo-Young;Lee, Jong-Kyu;Yoon, Kwang-Seok;Kim, Han-Sup
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2007.05a
    • /
    • pp.722-725
    • /
    • 2007
  • Geum River Estuary Barrage is very important for the irrigation, municipal and industrial uses in the cities of Gunsan, Iksan and Jeonju. The Geum River Control Office has a flood forecasting system; however, the current system does not consider the backwater effects. As a result, it is very difficult to give correct flood information, and it is difficult to accurately assess the water resource supply and saltwater invasion into freshwater, as frequently occurs due to over-discharge during floods. In this study, we investigate the flood forecasting system for the Geum River reach influenced by the estuary barrage. The current system cannot consider the backwater effect because the estuary barrage blocks the end of the river. We calculated the discharge from the tide lock and evaluated the inside water level of the estuary barrage during floods. The results show that the calculation agrees well with the observed data at the river stage stations in the Geum River. The results also show that this program is a reasonable substitute for the current system.

  • PDF

Analysis of Flood-Control Effects in Hancheon Reservoir using Nays2d Flood (Nays2d Flood 모형을 활용한 한천 저류지의 홍수조절효과 분석)

  • Son, Geunsoo;Kim, Dongsu;Kim, Seojun
    • Proceedings of the Korea Water Resources Association Conference
    • /
    • 2018.05a
    • /
    • pp.222-222
    • /
    • 2018
  • 최근 이상기후로 인한 집중호우의 증가로 인해 하천의 홍수방어능력을 초과하는 침수피해가 급증하고 있다. 특히, 제주도는 태풍의 길목에 위치하고 있는 강우량이 약 2,061mm에 달하는 우리나라 최다우 지역으로 평시에는 건천인 상태의 하천이 집중호우 시 급격한 유출 발생으로 하류도심지역에 하천 범람으로 인한 많은 피해가 발생하고 있다. 제주도에서는 이를 방어하기 위해 하도 내 첨두 홍수량을 조절하여 하류지역의 피해를 경감시키기 위한 구조물인 저류지를 상류에 설치하여 운영하고 있다. 하지만 저류지의 건설을 통한 실제 홍수조절효과에 대한 정량적인 분석은 미흡한 실정이다. 이에 본 연구에서는 태풍 '나리' 때 가장 큰 피해가 발생한 한천의 한천1, 2 저류지를 대상지역으로 선정하여 2차원 수치모형인 Nays2d Flood 모형을 활용한 한천 저류지의 운영에 따른 홍수조절효과를 분석하였다. 지형자료는 드론을 활용하여 측정된 약 7cm 간격의 정밀한 하상 측량자료를 사용하였고, 태풍 '차바' 발생 시 계측된 저류지내의 수심 측정 센서 자료를 활용하여 모형의 검보정을 수행하였다. 보정된 모의결과를 활용하여 태풍 '차바' 때의 저류지가 활용되는 모습을 재현할 수 있었고, 이를 통해서 현재 설치된 저류지의 구조적인 문제점과 운영방법에 따른 홍수조절효과 개선방안을 제시하고자 하였다. 또한 저류지 설계 시 사용된 100년 빈도의 설계 홍수량을 바탕으로 모의를 수행하여, 기존에 제시된 한천저류지의 홍수 저감량과의 비교를 통해서 실제 저류지의 운영에 따른 홍수조절효과를 정량적으로 분석하였다.

  • PDF

Development of 3D GIS System for the Visualization of Flood Inundation Area (홍수범람지역 가시화를 위한 3차원 GIS 시스템 개발)

  • Lee, Geun Sang;Jeong, Il Young
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.749-757
    • /
    • 2008
  • Recently, flood damages have increased with heavy rainfall and typhoon influences, and it requires that visualization information to the flood inundation area of downstream in dam discharge. This study developed 3D GIS system that can visualize flood inundation area for Namgang Dam downstream. First, DEMs extracted from NGIS digital maps and IKONOS satellite images were optimized to mount in iWorld engine using TextureMaker and HeightMaker modules. And flood inundation area of downstream could be efficiently extracted with real-time flooding water level using Coordinate Operation System for Flood control In Multi-reservoir (COSFIM) and Flood Wave routing model (FLDWAV) in river cross section. This visualization information of flood inundation area can be used to examine flood weakness district needed in real time Dam operation and be applied to establish the rapid flood disaster countermeasures efficiently.

Development of Reservoir Operation Model using Simulation Technique in Flood Season (I) (모의기법에 의한 홍수기 저수지 운영 모형 개발 (I))

  • Sin, Yong-No;Maeng, Seung-Jin;Go, Ik-Hwan;Lee, Hwan-Gi
    • Journal of Korea Water Resources Association
    • /
    • v.33 no.6
    • /
    • pp.745-755
    • /
    • 2000
  • The dam operation system of KOWACO for flood control doesn't have capability to account for the downstream hydrologic conditions and any feasible index to decide the pre-release from the forecasted rainfall and inflow. In this study, a dam operation model for flood control was developed to account for the flood flow condition of its downstream to give users the dam release schedules. Application test of EV ROM to Keum River showed that EV ROM is superior to the Rigid ROM and Technical ROM which are currently used by KOWACO. EV ROM developed in this study provides a release schedule accounting for the cumulative lateral flow hydrograph at the downstream control points where the discharge does not depend only on the dam operation. but also on lateral inflow from the tributaries. In order to reduce the peak discharge at the control points, it suggests the preliminary release during the early rising phase of the predicted hydrograph, holding the flood flow inside the dam during a peak phase, and afterward resuming the release. Three case studies of flood control by the operation of Daechung Multipurpose Dam in Geum River Basin show that the EV ROM is superior to the Rigid ROM and Technical ROM. This must be due to its nature to account for the downstream flow condition as well as the inflow and water level of the dam. It was also conceived that further case studies of EV ROM and more accurate rainfall prediction would improve the dam operation for flood control.ontrol.

  • PDF

A Case of Analysis of Constructed Wetland Using Geographic Information System (GIS를 활용한 천변저류지 적지분석에 관한 연구)

  • Ha, Sung Ryong;Lee, Jae Yil
    • Journal of Wetlands Research
    • /
    • v.8 no.1
    • /
    • pp.107-112
    • /
    • 2006
  • This study aim is to establish the suitability analysis of a constructed wetland using Geographic Information System. A constructed wetland is a flood control reservoir that is able to control flows and conserve a preserving integrity of nature maximum. It has been did that DB construction of flood area, socioeconomic analysis, and space analysis using GIS. Achieved reiteration arithmetic function from results of several elements, it has been did analysis for possibility space of constructed wetland. Through the analysis of flood area and a constructed wetland capacity, it has been established the estimation where is possible to build wetland. This study is applied suitability analysis method where has been choose the basin of To-Phyeong river in Kyongsang-namdo with methodology presentation about suitability analysis.

  • PDF

The Comparative Analysis of Reservoir Capacity of Chungju Dam based on Multi Dimensional Spatial Information (다차원 공간정보 기반의 충주댐 저수용량 비교분석)

  • Lee, Geun Sang
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.30 no.5D
    • /
    • pp.533-540
    • /
    • 2010
  • Dam is very important facility in water supply and flood control. Therefore study needs to analyze reservoir capacity accurately to manage Dam efficiently. This study compared time series reservoir capacity using multi-dimensional spatial information to Chungju Dam reservoir and major conclusions are as follows. First, LiDAR and multi beam echo sounder survey were carried out in land zone and water zone of Dam reservoir area. And calibration process was performed to enhance the accuracy of survey data and it could be constructed that multi dimensional spatial information which was clearly satisfied with the standard of tolerance error by validation with ground control points. Reservoir capacity by water level was calculated using triangle irregular network from detailed topographic data that was constructed by linked with airborne LiDAR and multi beam echo sounder data, and curve equation of reservoir capacity was developed through regression analysis in 2008. In the comparison of the reservoir capacity of 2008 with those of 1986 and 1996, the higher water level goes, total reservoir capacity of 2008 showed decrease because of the increase of sediment in reservoir. Also, erosion and sediment area could be analyzed through calculating the reservoir capacity by the range of water level. Especially the range of water level as 130.0~135.0 which is the upper part of average water level, showed the highest erosion characteristics during 1986~2008 and 1996~2008 and it is considered that the erosion of reservoir slant by heavy rainfall is major reason.

Survey for the Management of Reservoirs under Control of Local Authorities of Reservoir of City.Gun in Korea (시.군 관리 저수지 실태 조사 및 정비방안에 관한 연구)

  • Choi, Won;Kim, Han-Jung;Yoon, Seong-Su;Kim, Jong-Ok;Jung, Nam-Su;Lee, Hyung-Jin;Han, Yi-Cheol;Lee, Jeong-Jae
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.50 no.3
    • /
    • pp.31-41
    • /
    • 2008
  • There are many agricultural facilities (46.7%) that have been over 30 years in the Republic of Korea (the ratio of reservoirs built before 1945 is 53%, from 1946 to 1971 is 35%). In the case of reservoirs which do most important functions among these facilities, only 3,000 reservoirs are managed by Korea Rural Community & Agriculture Corporation (KRC) and the other 15,000 reservoirs are managed by local authorities (City and Gun). But, 15,000 reservoirs included in City. Gun have been built in more wide area than KRC and the reservoir management system has not been operated well because of shortage of budget and manpower of the local authorities. Particularly, the abnormal weather happened during every summer season recently has ruined a lot of rural community facilities. So flood control function have been more important than irrigation function in agricultural reservoir system and it may be required to introduce new safe, management and maintenance techniques in City Gun reservoirs. So we investigated landscapes and deteriorations of agricultural reservoirs managed by local small governments for revealing not only present usage but also future value. Survey shows that there are no structural managements except typical hydrological reportings and the deterioration of small darn is very serious. There are needs for more systematic management system and equipment methods. Therefore, this study may suggest that reservoir (that takes charge of the greatest deal of weight in all agricultural facilities) must be considered as new concept of the usage and the unification. On the other hand, reservoir must be also developed as amenity resources, natural circumstances and district values.

A Study of Developing Solar Power Generation Using Flood Control Reservoir (홍수조절지를 활용한 태양광전원 개발에 관한 고찰)

  • Park, Sung-Oh;Kim, Chang-Bum;Min, Hoon-Jin;Han, Jung-Kyun
    • Proceedings of the KIEE Conference
    • /
    • 2011.07a
    • /
    • pp.1340-1341
    • /
    • 2011
  • '12년 RPS 제도시행으로 태양광발전이 신재생에너지로서 큰 관심을 받고 있다. 이에 홍수기 이외에는 대규모의 유휴지가 발생하는 홍수조절 부지를 활용하여 태양광전원 개발방안과 개발규모에 관하여 검토하는 것이 본 연구의 목적이다.

  • PDF