• Title/Summary/Keyword: Flood Control Storage

Search Result 118, Processing Time 0.101 seconds

The Analysis of Critical Duration of uncontrolled single detention facility in Small Catchment (소규모 유역에서 자연방류형 단일저류지의 임계지속기간 분석)

  • Park, Jong-Young;Shin, Chang-Dong;Lee, Jung-Sik
    • Journal of the Korean Society of Hazard Mitigation
    • /
    • v.5 no.2 s.17
    • /
    • pp.17-28
    • /
    • 2005
  • The objective of this study is to evaluate the critical duration between detention facility and flood control facility of small size catchment. 4 small size catchments are applied for hydrological analysis and rainfall excess is computed by using the NRCS Runoff Curve Number method. The critical duration of detention facility and flood control facility is evaluated using the concept of allowable release rate. The conclusions studied in this study are as follows; (1) The type of temporal pattern of design rainfall which causes maximum storage ratio has resulted in Huff's 2 quartile in case of the use of the concept of allowable release rate. (2) Based on (1) of conclusion, the critical durations of flood control facility are similar to those of detention facility, which is used for uncontrolled single detention pond.

Application of two-term storage function method converted from kinematic wave method (운동파법의 변환에 의한 2항 저류함수법의 적용)

  • Kim, Chang Wan;Chegal, Sun Dong
    • Journal of Korea Water Resources Association
    • /
    • v.52 no.12
    • /
    • pp.1057-1066
    • /
    • 2019
  • The storage function method is used as a flood prediction model for four flood control offices in Korea as a method to analyze the actual rainfall-runoff relationship with non-linearity. It is essential to accurately estimate the parameters of the storage function method for accurate runoff analysis. However, the parameters of the storage function method currently in use are estimated by the empirical formula developed by the limited hydrological analysis in 2012; therefore, they are somewhat inaccurate. The kinematic wave method is a method based on physical variables of watershed and channel and is widely used for rainfall-runoff analysis. By adopting the two-term storage function method by the conversion of the kinematic wave method, parameters can be estimated based on physical variables, which can increase the accuracy of runoff calculation. In this research, the reproducibility of the kinematic wave method by the two-term storage function method was investigated. It is very easy to estimate the parameters because equivalent roughness, which is an important physical variable in watershed runoff, can be easily obtained by using land use and land cover, and the physical variable of channel runoff can be easily obtained from the basic river planning report or topographic map. In addition, this research examined the applicability of the two-term storage function method to runoff simulation of Naechon Stream, a tributary of the Hongcheon River in the Han River basin. As a result, it is considered that more accurate runoff calculation results could be obtained than the existing one-term storage function method. It is expected that the utilization of the storage function method can be increased because the parameters can be easily estimated using physical variables even in unmeasured watersheds and channels.

Hydrological Stability Analysis of the Existing Soyanggang Multi-Purpose Dam (소양강 다목적댐의 수문학적 안정성 검토)

  • 고석구;신용노
    • Water for future
    • /
    • v.28 no.3
    • /
    • pp.187-195
    • /
    • 1995
  • This study aims at suggesting an alternative to improve current capacity of flood control for the existing Soyanggang multi-purpose dam which was constructed 20 years ago as a largest dam in Korea. The newly estimated value of the probable maximum precipitation(PMP) is 760.0 mm which is based on the hydrometeorological method. The peak inflow of 1000 years return period at the time of construction was 13,500$m^3$/s. However, the newly estimated peak inflow of the PMF is 18,100$m^3$/s which is 1.34 times bigger than the original one. In order to adopt the newly estimated PMF as a design flood, following four alternatives were compared; (1) allocation of more flood control space by lowering the normal high water level, (2) construction of a new spillway in addition to the existing one, (3) raising the existing dam crest, (4) construction of a new dam which has relevant flood control storage at the upstream of the Soyanggang multipurpose dam. The preliminary evaluation of these alternatives resulted in that the second alternative is most economical and feasible. So as to stably cope with the newly estimated PMF by meeting all the current functions of the multi-purpose dam, a detailed study of an additional spillway tunnel has to be followed.

  • PDF

An Optimal Operation of Multi-Reservoirs for Flood Control by Incremental DP (Incremental DP에 의한 홍수시 댐군의 연계운영)

  • Lee, Jae-Hyeong;Lee, Gil-Seong;Jeong, Dong-Guk
    • Water for future
    • /
    • v.25 no.2
    • /
    • pp.47-60
    • /
    • 1992
  • An optimal operation model for flood control of multi-reservoirs, Hwacheon and Soyanggang, located in the north Han River basin is developed by using the Incremental DP. The objective function is to minimize the peak flow at the confluence point, of Euam dam, and the hydraulic and hydrologic constraints are established by considering the related laws as to the operation of dam in flood season, each reservoir and channel characteristics. In particular, the final elevations of each reservoir are induced to the conservation pool level in order to prepare for the secondary flood. In addition, the results of this model, simulation results and the single reservoir operation by DP are compared in terms of control and utility efficiencies, and also the peak flows at the confluence point for floods with various return periods are compared with the results of simulation suing feedback control. as the results, the control and utility effciencies are more or less low in contrast with the results of simulation and the single reservoir operation by DP, and the peak flows at confluence point are high because of terminal condition of reservoir storage.

  • PDF

Water Resources Utilization Pattern of JangSung Reservoir (장성호 수자원 이용 패턴)

  • Yoon, Kwang-Sik;Han, Kuk-Heon;Yoon, Suk-Gun;Jung, Jae-Woon
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2003.10a
    • /
    • pp.291-294
    • /
    • 2003
  • The Water resources utilization pattern of Jangsung reservoir was studied. The observed precipitation and existing reservoir operation data such as irrigation amount, reservoir storage, river maintenance requirement, flood control discharge were collected for ten years period and analyzed. Major findings of this study are as follows: The observed average, minimum, maximum annual precipitation were 905.1mm, 1,977.3mm, 1,554.3mm during study period, respectively. The average annual irrigation amount was 554.5mm, irrigation amount of drought years of '92 and '94 was 604.6mm, 679.2mm, respectively. However, irrigation amount of extended drought year '95 was 384.9mm. It showed that supplying capacity of Jangsung reservoir was limited when consecutive 2 year drought occurred. The main water resources usage of Jangsung reservoir was irrigation, but flood control discharge exceed irrigation amount exceptionally when high precipitation occurred. The reservoir operation record revealed that discharge for river maintenance was delivered even drought years.

  • PDF

A Technique of Inland Drainage Control Considering flood Characteristics of the Han River (한강홍수특성을 고려한 내배수 처리기법)

  • Lee, Won Hwan
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.11 no.1
    • /
    • pp.99-108
    • /
    • 1991
  • Rapid changes of urban hydrologic events need new management operation rule of detention reservoir which is essential outflow control system in urban area. Therefore, this study is to develop the outflow management method of Seoul city considering the Han river flood characteristics, to analyze the inundation of detention reservoir according to variation of design storm patterns, and to examine the safety of gate due to design flood water level. From this study, new operation rule is presented. The design storm patterns are determined by instantaneous intensity method and Huff's quartile method. And the inflow hydrograph of detention reservoir is obtained by applying ILLUDAS model and RRL method. The operation rule of existing drainage pump is designed to have linear relation between storage and pumping discharge. But in this study, it is effective for preventing inundation when the operation rule of drainage pump have Gaussian function which is combined the storage of detention reservoir with its inflow according to increasing or decreasing of inflow hydrograph.

  • PDF

Real time forecasting of rainfall-runoff using multiple model adaptive estimation (다중모델적응추정방식을 이용한 강우-유출량의 실시간 예측)

  • 최선욱;김운해;김영철
    • 제어로봇시스템학회:학술대회논문집
    • /
    • 1996.10b
    • /
    • pp.24-27
    • /
    • 1996
  • The storage function method(SFM) is one of hydrologic flood routings which has been used most widely in Korea and Japan. This paper presents a storage function method using multiple model adaptive estimation(MMAE), in which a model set is generated by partitioning storage parameters over feasible range, and each storage function model is estimated, and then the weighted average of them is calculated. Finally, the future runoff is predicted in real time by means of observed data of water level at dam and rainfall. Simulation results applied to actual data show that the proposed method has much better performance than that of conventional SFM.

  • PDF

A Study of Operation Standard and Method of Small Dams (소규모 댐의 운영기준 및 기법 연구)

  • Kim, Phil-Shik;Kim, Sun-Joo;Lee, Joo-Yong
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.260-265
    • /
    • 2005
  • The purpose of this study is to established a storage management method and operation standard for irrigation dams occupying the largest portion of small dams using storage management system. The system can be applied to seongju dam for effective management. The storage management method was established considering hydrology simulation and statistical analysis using the system. This method and operation standard are capable of analyzing additional available water, considering the water demand and supply of basin actually. It can improve the flood control capacity and water utilization efficiency by the flexible operation of storage space.

  • PDF

Unsteady Flow Analysis in the Youngsan River Using Explicit and Implicit Finite Difference Methods (양해법과 음해법을 이용한 영산강에서의 부정류해석)

  • Choi, Sung-Uk;Yeo, Woon-Kwang;Choo, Cheol;Kim, Chang-Wan;O, Yu-Chang
    • Water for future
    • /
    • v.24 no.4
    • /
    • pp.49-58
    • /
    • 1991
  • Flood routing in the Youngsan River was performed for the flood event of July, 1989 by two finite difference methods. The Saint Venant eq., a kind of hyperbolic partial differential equation is employed as governing equation and the explicit scheme (Leap Frog) and implicit scheme (Preissmann) are used to discretize the GE. As for the external boundary conditions, discharge and tidal elevation are upstream and downstream BC, respectively and estuary dam is included in internal BC. Lateral inflows and upstream discharges are the hourly results from storage function method, At Naju station, a Relatively upstream points in this river, the outputs are interpreted as good ones by comparing two numerical results of FDMs with the observed data and the calibrated results by storage function method. and two computational results are compared at the other sites, from middle stream and downstream points, and thus are considered reliable. Therefore, we can conclude from this research that these numerical models are adaptable in simulating and forecasting the flood in natural channels in Korea as well as existing hydrologic models. And the study about optimal gate control at the flood time is expected as further study using these models.

  • PDF

Fuzzy Optimal Reservoir Operation Considering Abnormal Flood (이상홍수를 고려한 퍼지 최적 저수지 운영)

  • Choi, Changwon;Yu, Myung Su;Yi, Jaeeung
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4B
    • /
    • pp.221-232
    • /
    • 2012
  • In this study, the model enhancing the safety of reservoirs and reducing the downstream flood damage by reservoirs system operation during abnormal flood was developed. Linear programming was used for the optimal reservoirs system operation during an abnormal flood and fuzzy inference system was introduced to solve the uncertainty problem which is included in hydrological factors like inflow, water level and inflow variation of reservoir operation. The linear programming model determined the optimal reservoir system operation rules and could be used in situation where water demands varies rapidly during the abnormal flood events using fuzzy control technique. In this study, the optimal reservoirs system operation for Andong and Imha reservoirs located in the upper basin of Nakdong river was performed in order that the design flood discharge at Andong city would not be exceeded for the design flood of 100 year and PMF(Probable Maximum Flood). And the model that determines the release according to the downstream flow discharge, the reservoir storage, the inflow and the inflow variation of each reservoir was developed using the optimal system operation result and fuzzy control technique. The developed model consisted of 224 fuzzy rules according to the conditions of Andong reservoir, Imha reservoir and Andong city. And the release from each reservoir could be determined when the current data are used as input data through the developed GUI.