• Title/Summary/Keyword: Flood Control

Search Result 829, Processing Time 0.026 seconds

IMPLEMENTATION OF A DECISION SUPPORT SYSTEM FOR INTEGRATED RIVER BASIN WATER MANAGEMENT IN KOREA

  • Shim Soon-Do;Shim Kyu-Cheoul
    • Water Engineering Research
    • /
    • v.5 no.4
    • /
    • pp.157-176
    • /
    • 2004
  • This research presents a prototype development and implementation of Decision Support System (DSS) for integrated river basin water management for the flood control. The DSS consists of Relational Database Management System, Hydrologic Data Monitoring System, Spatial Analysis Module, Spatial and Temporal Analysis for Rainfall Event Tool, Flood Forecasting Module, Real-Time Operation of Multi Reservoir System, and Dialog Module with Graphical User Interface and Graphic Display Systems. The developed DSS provides an automated process of alternative evaluation and selection within a flexible, fully integrated, interactive, centered relational database management system in a user-friendly computer environment. The river basin decision-maker for the flood control should expect that she or he could manage the flood events more effectively by fully grasping the hydrologic situation throughout the basin.

  • PDF

Remote Sensing Monitoring and Loss Estimated System of Flood Disaster based on GIS

  • Wenqiu, Wei
    • Proceedings of the KSRS Conference
    • /
    • 2002.10a
    • /
    • pp.507-515
    • /
    • 2002
  • Remote Sensing Monitoring and Loss Estimated System of Flood Disaster based on GIS is an integrated system comprised flood disaster information receiving and collection, flood disaster simulation, and flood disaster estimation. When the system receives and collects remote sensing monitoring and conventional investigation information, the distributional features of flood disaster on space and time is obtained by means of image processing and information fusion. The economic loss of flood disaster can be classified into two pus: direct economic loss and indirect economic loss. The estimation of direct economic loss applies macroscopic economic analysis methods, i.e. applying Product (Industry and Agriculture Gross Product or Gross Domestic Product - GDP) or Unit Synthetic Economic Loss Index, direct economic loss can be estimated. Estimating indirect economic loss applies reduction coefficient methods with direct economic loss. The system can real-timely ascertains flood disaster and estimates flood Loss, so that the science basis fur decision-making of flood control and relieving disaster may be provided.

  • PDF

Analysis on Flood Control Effect of Siphon Spillway by Reservoir Routing (저수지 추적을 통한 사이펀 여수로의 홍수조절 효과 분석)

  • Ko, Suhyeon;Kim, Jaeyoung;Lee, Giha
    • Journal of the Korean GEO-environmental Society
    • /
    • v.14 no.11
    • /
    • pp.55-63
    • /
    • 2013
  • Agricultural small dam reservoirs in Korea are vulnerable to flooding because of insufficient flood control capacity and deterioration such that reservoir water level is likely to rise rapidly and a large amount of water release quickly to downstream without flood warning. In this study, we performed hydrologic analysis to estimate design flood(200 years return period ${\times}1.2$) and also evaluated the effect of siphon spillway as a structural countermeasure for flood control and mitigation by applying reservoir routing to the Jipyeong reservoir, located in Sangju, Korea. The results show that the design flood was calculated at $284.3m^3/s$, and water level and water release decreased by 40cm and $91m^3/s$, respectively.

Analysis of Small reservoir system by Flood control ability augmentation (치수능력 증대에 따른 저수지시스템 분석)

  • Park Ki-Bum;Lee Soon-Tak
    • Journal of Environmental Science International
    • /
    • v.14 no.11
    • /
    • pp.995-1004
    • /
    • 2005
  • As a research establish reservoir safety operation for small dam systems. This study presents hydrologic analysis conducted in the Duckdong and Bomun dam watershed based on various rainfall data and increase inflow. Especially the Duckdong dam without flood control feature are widely exposed to the risk of flooding, thus it is constructed emergency gate at present. In this study reservoir routing program was simulation for basin runoff estimating using HEC-HMS model, the model simulation the reservoir condition of emergency Sate with and without. At the reservoir analysis results is the Duckdong dam average storage decrease $20\%$ with emergency gate than without emergency gate. Also, the Bomun dam is not affected by the Duckdong flood control augmentation.

A study on the measures to use Gunnam flood control reservoir through a reservoir simulation model (저수지 모의 모형을 통한 군남홍수조절지의 활용방안에 관한 연구)

  • Yang, Wonseok;Ahn, Jaehwang;Yi, Jaeeung
    • Journal of Korea Water Resources Association
    • /
    • v.50 no.6
    • /
    • pp.407-418
    • /
    • 2017
  • Due to geographical features of being close to DPRK (Democratic People's Republic of Korea), the Imjin River basin has difficulties in hydrological observation, and is vulnerable to unexpected flood occurrence. As a countermeasure, Gunnam Flood Control Reservoir construction was planned in 2005. Despite such a structural measure, damages by DPRK's illegal release continues to occur. Futhermore the Imjin River's flow has been decreased due to the effect of continuous drought in the Korean Peninsula since 2012 and DPRK's unilateral storage of water. A new operation method is derived for the Gunnam Flood Control Reservoir in order to cope with drought damages on the Imjin River basin and to ensure efficient response time upon flooding. The operation method maintaining Gunnam Flood Control Reservoir's water level by raising from EL.23.0 m to EL.31.0 m during the flood season for securing reservoir capacity enables to secure additional $14,000,000m^3$ water compared to the existing operation methods. The operation method to store inflow by controlling release to $250m^3/s$ in the early stage of flood has increased 2.66% on average in terms of detention effect of reservoir compared to the existing operation methods. The method enables to secure 19 hours to prepare flood compared to the existing methods.

Assessment of Criteria for selecting Rainwater Management Strategies (도시 물순환 건전화를 위한 빗물관리 계획요소 평가)

  • Lee, Tae-Goo;Han, Young-Hae
    • KIEAE Journal
    • /
    • v.10 no.4
    • /
    • pp.9-17
    • /
    • 2010
  • The purpose of this study is to draw out objective bases for selecting various applicable facilities in case of the establishment of rainwater management strategies. To do so, sixteen facilities were selected from decentralized rainwater management systems that induce rainwater infiltration and detention as well as centralized end-of-pipe type infiltration and detention facilities in local areas. With these facilities, it attempted to evaluate them in terms of sustainability, pollutant elimination, flood control capacity and costs and subsequently analyzed correlations between each characteristic. The outcomes of the analysis were as follows: First was the analysis of characteristics between decentralized rainwater management systems and end-of-pipe rainwater management systems. From the decentralized rainwater management systems, the mulden-rigolen system and grass swale at street level had the highest in the total of the four items while the totals of the underground detention tank and temporary detention site were highest in end-of-pipe rainwater management systems. After analyzing the correlation between different types of facilities and each variable, it can be said that decentralized rainwater management systems have a higher correlation than end-of-pipe rainwater management systems in terms of sustainability whereas the latter are better in flood control capacity than the former. Second, the analysis of correlation in variables of each facility is as follows: first, there is a negative correlation between sustainability value and flood control capacity value; and there is a positive correlation between flood control capability and pollutants elimination. In addition, it revealed that the higher the flood control and pollutant elimination capability the higher the facility costs. Based on these assessments, it is possible to use them as objective selection criteria for facility application in case of site development project or complex plan.

Reservoir Operation by Tabu Search Method during Flood (타부탐색기법에 의한 홍수시 저수지 운영에 관한 연구)

  • Jeong, Han-Woo;Choi, Seung-An;Kim, Hung-Soo;Shim, Myung-Phil
    • Journal of Korea Water Resources Association
    • /
    • v.38 no.9 s.158
    • /
    • pp.761-770
    • /
    • 2005
  • This study applied the fuzzy logic control for the construction of the reservoir operation model which can consider uncertainty of the predicted inflow in determining reservoir release during flood period. The control rule is usually constructed based on the opinion of experts which is a general technique. To improve the drawback of general technique, this study constructed the Fuzzy-Tabu search model automatically established by the fuzzy rule using Tabu search which is a global optimization technique. As the results, the peak release is decreased and the flood control efficiency is improved. The total release is also decreased and this represents the benefit in water use. Consequently, it is confirmed that the effect of flood control can be increased through the constructed model. It also shows that the available water resources after the flood is more increased. So, the proposed Fuzzy-Tabu search model could be better than the actual reservoir operation methodology in the aspect of water use.

Effects on Conservation and Flood Control Systems According In Normal Water Level Change from Daechung Multi-Purpose Reservoir (대청 다목적댐의 상시만수위 변경에 따른 이수 및 치수 영향 검토)

  • Yi, Jae-Eung;Kwon, Dong-Seok
    • Journal of Korea Water Resources Association
    • /
    • v.40 no.1 s.174
    • /
    • pp.1-10
    • /
    • 2007
  • Reallocation procedure of multipurpose reservoir storage capacity between flood control and conservation is presented as an alternative to secure more water resources. Storage reallocation is an adaptive management mechanism for converting existing normal pool level of reservoirs to more beneficial uses without requirement for physical alteration. This study is intended to develop a reservoir storage reallocation methodology that allows increased water supply storage without minimizing adverse impacts on flood control. The methodology consists of flood control reservoir simulation for inflows with various return periods, flow routing from reservoir to a potential damage site, analyzing river carrying capacity, and reservoir yields estimation for reallocated storages. For the flood control model, a simulation model called Rigid ROM(Reservoir Operation Method) and HEC-5 are used. The approach is illustrated by applying it to two reservoirs system in Geum River basin. Especially with and without new project conditions are considered to analyze trade-offs between competing objectives.

Economic Assessment for Flood Control Infrastructure under Climate Change : A Case Study of Imjin River Basin (기후변화를 고려한 홍수방재시설물의 경제성분석 : 임진강 유역사례)

  • Kim, Kyeongseok;Oh, Seungik
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.2
    • /
    • pp.81-90
    • /
    • 2017
  • In Imjin River basin, three floods occurred between 1996 and 1999, causing many casualties and economic losses of 900 billion won. In Korea, flood damage is expected to increase in the future due to climate change. This study used the climate scenarios to estimate future flood damage costs and suggested a real options-based economic assessment method. Using proposed method, the flood control infrastructures in Imjin River basin were selected as a case study site to analyze the economic feasibility of the investment. Using RCP (Representative Concentration Pathway) climate scenarios, the future flood damage costs were estimated through simulated rainfall data. This study analyzed the flood reduction benefits through investment in the flood control infrastructures. The volatility of flood damage reduction benefits were estimated assuming that the RCP8.5 and RCP4.5 climate scenarios would be realized in the future. In 2071, the project option value would be determined by applying an extension option to invest in an upgrading that would allow the project to adapt to the flood of the 200-year return period. The results of the option values show that the two investment scenarios are economically feasible and the project under RCP8.5 climate scenario has more flood damage reduction benefits than RCP4.5. This study will help government decision makers to consider the uncertainty of climate change in the economic assessment of flood control infrastructures using real options analysis. We also proposed a method to quantify climate risk factors into economic values by using rainfall data provided by climate scenarios.