• Title/Summary/Keyword: Flexible Flow Shop

Search Result 22, Processing Time 0.022 seconds

Process Management Systems for Integrated Real-Time Shop Operations in Heterogeneous Multi-Cell Based Flexible Manufacturing Environment (이기종 멀티 셀 유연생산환경에서의 실시간 통합운용을 위한 공정관리 체계)

  • Yoon, Joo-Sung;Nam, Sung-Ho;Baek, Jae-Yong;Kwon, Ki-Eok;Lee, Dong-Ho;Lee, Seok-Woo
    • Journal of the Korean Society of Manufacturing Technology Engineers
    • /
    • v.22 no.2
    • /
    • pp.281-286
    • /
    • 2013
  • As the product lifecycle is getting shorter and various models should be released to respond to the needs of customers and markets, automation-based flexible production line has been recognized as the core competitiveness. According to these trends, system vendors supply cell-level systems such as FMC(Flexible Manufacturing Cell) that is integration of core functions of FMS(Flexible Manufacturing System) and RMC(Reconfigurable Manufacturing Cell) that can easily extend components of FMC. In the cell-based environment, flexible management for shop floor composed of existing job shop, FMCs and RMCs from various system vendors has emerged as an important issue. However, there could be some problems on integrated operation between heterogeneous cells to use vendor-specific cell controllers and on seamless information flow with high level systems such as ERP(Enterprise Resource Planning). In this context, this paper proposes process management systems supporting integrated shop operation of heterogeneous multi-cell based flexible manufacturing environment: First of all, (1) Integrated Shop Operation System to apply the process management system is introduced, and (2) Multi-Layer BOP(Bill-Of-Process) model, a backbone of the process management system, is derived with its data structure. Finally, application of the proposed model is illustrated through system implementation results.

Minimizing the total completion time in a two-stage flexible flow shop (2 단계 유연 흐름 생산에서 평균 완료 시간 최소화 문제)

  • Yoon, Suk-Hun
    • Journal of Convergence for Information Technology
    • /
    • v.11 no.8
    • /
    • pp.207-211
    • /
    • 2021
  • This paper addresses a two-stage flexible flow shop scheduling problem in which there is one machine in stage 1 and two identical machines in stage 2. The objective is the minimization of the total completion time. The problem is formulated by a mixed integer quadratic programming (MIQP) and a hybrid simulated annealing (HSA) is proposed to solve the MIQP. The HSA adopts the exploration capabilities of a genetic algorithm and incorporates a simulated annealing to reduce the premature convergence. Extensive computational tests on randomly generated problems are carried out to evaluate the performance of the HSA.

Priority Scheduling for a Flexible Job Shop with a Reconfigurable Manufacturing Cell

  • Doh, Hyoung-Ho;Yu, Jae-Min;Kwon, Yong-Ju;Lee, Dong-Ho;Suh, Min-Suk
    • Industrial Engineering and Management Systems
    • /
    • v.15 no.1
    • /
    • pp.11-18
    • /
    • 2016
  • This paper considers a scheduling problem in a flexible job shop with a reconfigurable manufacturing cell. The flexible job shop has both operation and routing flexibilities, which can be represented in the form of a multiple process plan, i.e. each part can be processed through alternative operations, each of which can be processed on alternative machines. The scheduling problem has three decision variables: (a) selecting operation/machine pairs for each part; (b) sequencing of parts to be fed into the reconfigurable manufacturing cell; and (c) sequencing of the parts assigned to each machine. Due to the reconfigurable manufacturing cell's ability of adjusting the capacity, functionality and flexibility to the desired levels, the priority scheduling approach is proposed in which the three decisions are made at the same time by combining operation/machine selection rules, input sequencing rules and part sequencing rules. To show the performances of various rule combinations, simulation experiments were done on various instances generated randomly using the experiences of the manufacturing experts, and the results are reported for the objectives of minimizing makespan, mean flow time and mean tardiness, respectively.

Near optimal scheduling of flexible flow shop using fuzzy optimization technique (퍼지 최적화기법을 이용한 유연 흐름 생산시스템의 근사 최적 스케쥴링)

  • Park, Seung-Kyu;Lee, Chang-Hoon;Jang, Seok-Ho;Woo, Kwang-Bang
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.4 no.2
    • /
    • pp.235-245
    • /
    • 1998
  • This paper presents the fuzzy optimization model based scheduling methodology for the efficient production control of a FFS(FIexible Flow Shop) under the uncertain production environment. To develop the methodology, a fuzzy optimization technique is introduced in which the uncertain production capacity caused by the random events like the machine breakdowns or the absence of workers is modeled by fuzzy number. Since the problem is NP hard, the goal of this study is to obtain the near optimal but practical schedule in an efficient way. Thus, Lagrangian relaxation method is used to decompose the problem into a set of subproblems which are easier to solve than the original one. Also, to construct the feasible schedule, a heuristic algorithm was proposed. To evaluate the performance of the proposed method, computational experiments, based on the real factory data, are performed. Then, the results are compared with those of the other methods, the deterministic one and the existing one used in the factory, in the various performance indices. The comparison results demonstrate that the proposed method is more effective than the other methods.

  • PDF

Job sequencing decision in flow shop using revised Multi-Criteria Decision Making Method (수정된 다기준 의사결정을 이용한 흐름방식에서의 작업순서 결정)

  • 안춘수;강태건;정상윤;홍성일
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.20 no.44
    • /
    • pp.135-151
    • /
    • 1997
  • In this paper, we propose a simple and relatively efficient heuristic method to determine job sequencing in the flow-shop considering multiple criteria such as processing time, due date and cost. The proposed method is applicable to the flow- shop where the jobs are released simultaneously and their processing sequence is predetermined and not changed until the whole jobs are processed. To develop this method, we mixed and modified some well-known multi-attribute decision heuristics such as the simple linear weighting scheme, the lexicographic rule and the 'elimination by aspect' rule. Some computer simulations were conducted to test the efficiency of the proposed method and it has been compared with the SWPT (Shortest Working Processing Time) rule and EDD (Earliest Due Date) rule. The results show that our method is as effective as the traditional ones in terms of mean flow time, tardiness, makespan, cycle time, machine utilization, etc., and proved to be much simpler and more flexible to be used in real situations.

  • PDF

Determination of the Entering Point and the Number of AGVs required in the Flow Shop Type FMS (Flow Shop 형태를 갖는 FMS에서의 AGV투입시점과 필요댓수의 결정)

  • Yang, Dae-Yong;Chung, Byung-Hee;Lee, Jong-Min
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.17 no.1
    • /
    • pp.109-115
    • /
    • 1991
  • In automated manufacturing systems, Automated Guided Vehicle(AGV) Systems are increasingly important in material handling and manufacturing operations. A considerably flexible AGV system needs to be operated with maximum effectiveness. This paper develops an algorithm for the determination of the entering point and the number of AGVs required in the Flow Shop Type FMS. We consider an AGV used as a carrier and mobile workstation. For the limited number of AGV, the entering point of an AGV on a simple loop is determined in order to maximize the utilization of AGVs. For the unlimited number of AGVs, the number of AGVs required in the FMS is determined on the basis of the entering point of AGVs. The result by the algorithm may be used as a criterion on the control of material flow and the assignment of AGVs in the FMS. A numerical example is given to illustrate the algorithm.

  • PDF

A Scheduling Scheme for Flexible Flow Shop with Release Date and Due Date (시작시기와 납기를 고려하는 유연흐름공장의 일정계획)

  • Lee, J.H.;Kim, S.S.
    • IE interfaces
    • /
    • v.11 no.3
    • /
    • pp.1-13
    • /
    • 1998
  • This paper addresses a scheduling scheme for Flexible Flow Shop(FFS) in the case that a factory is a sub-plant of an electronic device manufacturing plant. Under this environment, job orders for the sub-plants in the production route are generated together with job processing time bucket when the customer places orders for final product. The processing time bucket for each job is a duration from possible release date to permissible due date. A sub-plant modeled FFS should schedule these jobs orders within time bucket. Viewing a Printed Circuit Board(PCB) assembly line as a FFS, the developed scheme schedules an incoming order along with the orders already placed on the scheduled. The scheme consists of the four steps, 1)assigning operation release date and due date to each work cells in the FFS, 2)job grouping, 3)dispatching and 4)machine allocation. Since the FFS scheduling problem is NP-complete, the logics used are heuristic. Using a real case, we tested the scheme and compared it with the John's algorithm and other dispatching rules.

  • PDF

Design of Scheduling System for Flexible Manufacturing Cells (FMC에서의 일정계획 시스템의 설계)

  • 신대혁;이상완
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.17 no.32
    • /
    • pp.63-71
    • /
    • 1994
  • The purpose of this paper is to describe an effective cell scheduling system for flexible manufacturing cells. Based on the FMC characteristics, cell scheduling can be defined as a dynamic modified flow shop working in a real-time system. This paper attempt to find the optimal cell scheduling when minimizing the mean flow time for n-job/m-machine problems in static and dynamic environments. Real-time scheduling in an FMC environment requires rapid computation of the schedule.

  • PDF

Scheduling in Flexible Manufacturing System with Flow Type (흐름작업장 형태를 따르는 유연 생산시스템에서의 일정계획)

  • 장석화
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.14 no.24
    • /
    • pp.97-103
    • /
    • 1991
  • This paper deals with a scheduling problem with the objective of maximizing the throughput rate in flexible manufacturing system with shop type. Manufacturing system is consisted of multi-stage in series. All kinds of parts are processed in same in processing time. No buffer space is allowed between stages, and no part waiting is allowed in each stage. Part flow control method for determining the optimal production sequence of all parts and the production starting time of each part is proposed.

  • PDF

A Simulation-based Genetic Algorithm for a Dispatching Rule in a Flexible Flow Shop with Rework Process (시뮬레이션 기반 유전알고리즘을 이용한 디스패칭 연구: 재작업이 존재하는 유연흐름라인을 대상으로)

  • Gwangheon Lee;Gwanguk Han;Bonggwon Kang;Seonghwan Lee;Soondo Hong
    • The Journal of Bigdata
    • /
    • v.7 no.1
    • /
    • pp.75-87
    • /
    • 2022
  • This study investigates a dynamic flexible flow shop scheduling problem under uncertain rework operations for an automobile pipe production line. We propose a weighted dispatching rule (WDR) based on the multiple dispatching rules to minimize the weighted sum of average flowtime and tardiness. The set of weights in WDR should be carefully determined because it significantly affects the performance measures. We build a discrete-event simulation model and propose a genetic algorithm to optimize the set of weights considering complex and variant operations. The simulation experiments demonstrate that WDR outperforms the baseline dispatching rules in average flowtime and tardiness.