Costal fisheries use small boat. The boats are frequently substituted with newly made boat or proper boat. When the boat which is substituted with another one after the fixed date for compensation is estimated for fisheries loss by public project, it is matter that which boat is the object for estimating average catch of fish. There are three ways in practical business. They are based on the date of spot probe, the date of conference for compensation and fixed date for compensation. In case of applying the first and the second ways, as the object of compensation is not fixed, there is problem that estimated result can be changed depending on changing boat tons even after the date of spot probe and the fixed date for compensation. Most of all, these ways are against Attached Form No.4 of the Enforcement Ordinance of Fisheries Law which regulate to calculate average catch of fish applying result of fishery for retroactively counted 3 years from the year before the year in which administrative measure day is. The other side, in applying boat tons based on the fixed date for compensation, estimated result of compensation will not change even boat substituted after the fixed date for compensation. Even though applying tons based on the fixed date for compensation, a problem still remains. If the boat get bigger after the fixed date for compensation, the then boat size must be applied for calculating average catch. But the boat get smaller, the changed boat size must be applied. Because changed small boat would be damaged less than the previous boat. And decrease in catch by changing boat into small one is not due to the project but due to the personal responsibility. This will help to increase objectivity and reliance on the compensation result. As the other objects are fixed based on the fixed date for compensation in the Act on Acquisition and Compensation of Land and Others for Public Project, it can be balanced with other object.
Due-date is an important factor in Flexible Manufacturing System scheduling. Even though most of researchers have focused part selection and loading problem using fixed due-date assignment rules, FMSs consist of multi-function machines which facilitate alternative processes. This research investigates interactions of three dispatching mechanisms, three NSS (Next Station Selection) rules and four due-date assignment rules using simulation. Both cost-based and time-based performance measures are considered in this research.
In the previous research, we considered a logistics brokerage problem with the objective of minimizing total transportation lead time of freights in a logistics e-marketplace, in which a logistics brokerage agent intermediates empty vehicles and freights registered by car owners and shippers [7]. However, in the logistics e-marketplace, transportation due date tardiness is more important than the transportation lead time, since transportation service level is critically determined by whether the due date is met or not. Therefore, in this paper, we deal with the logistics brokerage problem with the objective of minimizing total tardiness of freights. Hungarian method based matching algorithms, real time matching(RTM), periodic matching(PM), and fixed matching(FM), are used for solving the problem considered in this paper. In order to test performance of the proposed algorithms, we perform computational experiments on a various problem instances. The results show that the waiting-and-matching algorithms, PM and FM, also give better performance than real time matching strategy, RTM, for the total tardiness minimization problem as the algorithms did for the total lead time minimization problem.
In this paper, scheduling problem is dealt for the minimization of due date penalty for the customer order. Multiproduct batch processes have been dealt with for their suitability for high value added low volume products. Their scheduling problems take minimization of process operation for objective function, which is not enough to meet the customer satisfaction and the process efficiency simultaneously because of increasing requirement of fast adaptation for rapid changing market condition. So new target function has been suggested by other researches to meet two goals. Penalty function minimization is one of them. To present more precisely production scheduling, we develop new scheduling model with penalty function of earliness and tardiness We can find many real cases that penalty parameters are divergent by the difference between the completion time of operation and due date. That is to say, the penalty parameter values for the product change by the customer demand condition. If the order charges different value for due date, we can solve it with the due date period. The period means the time scope where penalty parameter value is 0. If we make use of the due date period, the optimal sequence of our model is not always same with that of fixed due date point. And if every product have due date period, due date of them are overlapped which needs optimization for the maximum profit and minimum penalty. Due date period extension can be enlarged to makespan minimization if every product has the same abundant due date period and same penalty parameter. We solve this new scheduling model by simulated annealing method. We also develop the program, which can calculate the optimal sequence and display the Gantt chart showing the unit progress and time allocation only with processing data.
Proceedings of the Korean Society of Crop Science Conference
/
2022.10a
/
pp.63-63
/
2022
Wheat flour can be categorized into bread, all-purpose, cake flour according to its protein content. Since optimal wheat flour protein content is different for each end use, it is necessary to diversify the nitrogen fertilizer methods depending on the end use and cultivar. Optimal wheat flour protein content of soft wheat (for cake flour) is lowest (<=10%) among all end use, it is necessary to develop nitrogen fertilizer methods for high yield and low protein content. In order to analyze the yield and quality changes of soft wheat as nitrogen fertilizer amount and splitting timing, soft wheat cultivar 'goso' was sown on paddy soil in jeunju, Republic of Korea ('21.10). the amount of nitrogen fertilizer was divided into 4 levels by adjusting 2kg/10a increments from 5.1 to ll.lkg/lOa, and in the N 7.1 and 9.1 kg/1 Oa(standard) treatment, N amount divided into sowing date:regrowing stage=3:7,4:6(standard), 5:5. In regrowing stage, Tiller number and N fertilizer amount at sowing date showed a correlation; y=-121.14x2+792.66x-525.41 (R2=0.77*, y: Tiller number/m2, x: N amount at sowing date(kg/10a)). Tiller number in regrowing stage was the highest when the nitrogen fertilizer amount at sowing date was 3.23kg/10a. spike number per m2 was the highest when N fertilizer was divided into sowing date:regrowing stage=3:7(N amount: 9.1kg/10a). If N fertilizer amount was fixed, grain yield was also the highest when N fertilizer was divided into sowing date :regrowing stage=3:7. Also, N amount at sowing date and grain yield showed no correlation, but N amount at regrowing stage and grain yield showed significant correlation. As N amount increased, protein content also showed a tendency to increase.
Objectives : The OunyukgiUihakbogam authored by Cho, Wonhee, despite its relevance to application of the five circuit theory today, has been under-researched. Methods : Contents on the unique treatment approach through the 'visiting circuit and visiting qi(客運客氣)' of the date of conception was studied. Results & Conclusions : The theory of calculating the date of conception with the date of birth applies the theory of the various combinations of the ten heavenly stems. The gestation period for those born on the day of the rabbit and chicken are either 246 or 306 days, while for those born on the day of the tiger and monkey, 256 days. For those born on the day of the cow or the lamb, 266; for those born on the day of the rat or horse, 276; for those born on the day of the snake or the pig, 286; for those born on the day of the dragon or the dog, 296 days. Once the date of conception is fixed, the visiting circuit and qi is estimated, and a matching formula is chosen and applied.
Under CISG the places of delivery by the seller of the goods are: If the seller is not bound to deliver the goods at any other particular place and the contract of sale involves carriage of the goods, the seller has to hand the goods over to the first carrier for transmission to the buyer. However, if the contract does not involve carriage of the goods, he has to place them at the buyer's disposal at the place where, at the time of the conclusion of the contract, both the seller and the buyer knew that the goods were at, or were to be manufactured or produced. This rule applies when the contract relates to specific goods, or unidentified goods to be drawn from a specific stock or to be manufactured or produced. Finally, in ant other cases the seller has to place the goods at the buyer's disposal at the place where the seller had his place of business at the time of the conclusion of the contract. As to time of delivery, if a date is fixed by or determinable from the contract, the seller has to deliver the goods on that date. If a period for delivery is fixed by or determinable from the contract, he has to deliver the goods on any date within that period. In this way the seller chooses the specific date of delivery within that period, while circumstances indicate otherwise that the choice is to be made by the buyer. There no such date or period, the seller has to deliver the goods within a reasonable time after the conclusion of the contract. If the seller delivers the goods before such the date or period, the buyer is entitled to take delivery or refuse to take delivery. Under these backgrounds of provisions of CISG, this study first suggests the concepts of the handing over of the goods by the seller to the carrier and the placing them at the buyer's disposal. Then it goes further to looks into exactly where and when the delivery has to occur. In these context, this study more examines what happens if there is a breach of contract by the seller in connection with the delivery. That is, if the seller delivers non-conforming goods or at wrong place; what if there is a partial delivery or a premature delivery.
According to the Housing Lease Protection Act, even though it is not registered, if the lessee has completed delivery of a house and the resident registration, the lease shall take effect against the third person from the following day thereof. Any lessee who has met the requirements for opposing power and obtained the fixed date on the lease contract document, shall be entitled to receive the repayment of the deposit from the converted price of the leased house, in preference to any junior obligors and other creditors, at the time of an auction as provided by the Civil Execution Act and a public sale as prescribed by the National Tax Collection Act. The lessee shall be entitled to receive a repayment of a specified amount of the deposit in preference to other persons having the security rights in the leased house. However those provisions give rise to many problems because the Housing Lease Protection Act allows the opposing power and the right of preferential payment from the following date of fulfillment of the requirement. For the purpose of solving the problems, this study suggests that the Housing Lease Protection Act need to be amended as follows. The fixed date should be added to the requirement of opposing power and the preferential right of specified deposit repayment. In addition, the commencement of opposing power and preferential right of deposit repayment need to be taken effect from the day that the requirement is fulfilled.
Various changes in ocular position are possible during general anesthesia as opposed to the awakening state. However, unexpected ocular deviation under general anesthesia is a disconcerting event as it can lead to difficult complications intraoperatively. To date, sudden fixed upward ocular deviation has been rarely reported previously. This phenomenon was observed in an 8-year-old boy during strabismus surgery. Suddenly fixed upward ocular deviation occurred when the speculum was inserted into the right eye. When the eyeball was pulled down, using forceps, there was some resistance, such as contracture of superior rectus. The eyeball sprang back into the upward position when the forceps was released. These changes could hamper the good exposition of the surgical field, leading to significant intraoperative difficulties and complications. Surgeons should be aware of this possibility, despite general anesthesia; if it occurs, proceed with the surgery as planned preoperatively, and both ophthalmic and anesthetic interventions should be used to solve this problem.
Researchers have examined how individuals' preferred ways of comparing achievements differ according to their mindset. However, studies investigating the concomitant impact of such differences on individuals' happiness are relatively scant. Using a variety of scenarios, the present study examined how fixed-mindset and growth-mindset individuals' different achievement-comparison styles (more than others, less than others, better than before, and worse than before) affected their subjective happiness. A total of 880 participants were recruited. Fixed-mindset individuals felt happy when they felt they achieved more than others and unhappy when they felt the opposite, but were not influenced significantly when their achievement was better or worse than before. Conversely, growth-mindset individuals felt happy when their achievement was better than before but unhappy when it was the opposite, without being influenced significantly by achieving more or less than others. This study examined mindset, achievement comparison, and subjective happiness comprehensively, which, to date, have only been examined independently.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.