• Title/Summary/Keyword: Finishing works

Search Result 93, Processing Time 0.025 seconds

An Investigation into the PID Control for the Electro- Hydraulic Servo System of Skin Pass Mill

  • Lee, Jae-Cheon;Kim, Seong-Jin
    • International Journal of Precision Engineering and Manufacturing
    • /
    • v.2 no.4
    • /
    • pp.47-53
    • /
    • 2001
  • This study is to investigate the problem of the SPM(Skin Pass Mil7) system which is a finishing treatment of steel sheet. and to develop a PID control scheme to minimize process instability. An electrohydraulic servo system with conventional proportional controller used to regulate the force on the strip works inadequately to yield very undesirable transient responses at the moments welding parts of the strip conte into and pass through the rolls. Both linearized and nonlinear models of a typical SPM system ware simulated first by using Simulink. Then Ziegler-Nichols ultimate cycling method was used for an initial reference guide to tune PID gains, and further fine tuning was performed to get desirable response. The test result in the plant show that proposed PID control scheme successfully improves the process instability in a SPM system.

  • PDF

Burn-up Characteristics of Polymer-Modified Cement Mortar Used for Building Repair (고온시에서의 폴리머 시멘트 모르타르의 연소특성에 관한 연구)

  • Kim, Hyung-Jun;Noguchi, Takahumi
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2012.05a
    • /
    • pp.295-298
    • /
    • 2012
  • Repair and strengthening is necessary to extend the service life of existing buildings. Polymer-modified cement mortar (PCM) has been extensively used as a high performance material particularly for finishing and repairing works in concrete building because of itsexcellent adhesion, waterproofing, resistance to chemical attack, and workability. As PCM contains organic polymer, it is necessary to clarify its properties at high temperature under fire, on which sufficient data are not available. This paper evaluated the burn-up characteristics of polymer-modified cement mortar with cone calorimeter test, non-combustibility test and flammability test with experimental parameters such as the types of polymer, unit-polymer content, polymer-cement ratio and thickness of the specimen.

  • PDF

DEVELOPMENT OF ELECTRICAL CONTROL DEVICE FOR AUTONOMOUS TRACTOR

  • Kim, S.C.;Park, W.P.;Jung, I.J.;Chung, S.O.;Lee, W.Y.
    • Proceedings of the Korean Society for Agricultural Machinery Conference
    • /
    • 2000.11b
    • /
    • pp.460-471
    • /
    • 2000
  • The Higher industerialization, The shorter labor for fanning with not also reduction of quantity like as agricultural population but also deterioration of quality like as old age or womon in Korea. Most of Farmers magnified their farm land for increasing income, but they have been in difficulties because of employment of skillful driver of farm machinery and ensurance farm labor which need finishing seasonable works. (omitted)

  • PDF

Preparation of Multifuctional Wool Fibers with Nano-Silver Colloid (나노 은 콜로이드를 이용한 다기능성 양모섬유의 제조)

  • Ki, Hee-Yeon;Yeo, Sang-Young;Jeong, Sung-Hoon
    • Proceedings of the Korean Fiber Society Conference
    • /
    • 2003.10b
    • /
    • pp.239-240
    • /
    • 2003
  • Recently, the works about antibacterial finishing have been actively investigated in textile industry because of increasing environmental pollution. Wool can easily be an medium for microorganisms growth under proper temperature and humid condition. These microorganisms can result in damages, skin irritations, and infections in wool products. For this reason, the wool materials must be protected against microorganisms in order to suppress their growth and dissemination as well as fiber damage. (omitted)

  • PDF

A Heuristic Approach to the Shift-scheduling Considering the Balance of Work-load in Nuclear Power Plants (호텔 요리사의 인간공학적 작업 위험성 평가)

  • Kim, Dae-Ho;Yun, Young-Su;Lee, Yong-Hee
    • Journal of the Ergonomics Society of Korea
    • /
    • v.25 no.4
    • /
    • pp.1-7
    • /
    • 2006
  • The purpose of this study is to develop an efficient algorithm for the management of the shift schedule in nuclear power plants in consideration with the ergonomic criteria and the regulatory codes. The ergonomic criteria considered are the work hours, overtime-work frequency and working time, start and finishing time of works, allocation of rest times and duty-offs, rotating of shifts, etc. to comply with the regulations such as the Labor Standard Act, the ILO Convention No. 171, 178, "the detailed content of a periodic safety review," enforcement regulations 19-2 of the Atomic Energy Act. The developed algorithm for the shift schedule program adopts a heuristic method to minimize the difference the workload for shift workers in nuclear power plants.

A Study on the Vernacular Characteristics of Contemporary Earth Architecture (현대 흙건축의 버나큘러 특성에 관한 연구)

  • Kim, Tae-Hoon;Kim, Soon-Wung
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.18 no.2
    • /
    • pp.1-9
    • /
    • 2016
  • Vernacular perspectives had been ignored in the movement of modern architecture. This study's purpose was to review vernacular perspectives and to identify vernacular characteristics of earth architecture. Six representative contemporary earth architects were selected, and then their works were analyzed. Themes of vernacular architecture based of Frampton's critical regionalism were emerged. Findings were as following: 1) constructed by considering the local climate and the region's natural characteristics, 2) constructed with local materials seeking integration of structure and finishing work, 3) having tectonic form included regional characteristics, 4) creating space of various senses and expression of texture through earth modeling, 5) presenting homogeneity of sense of place between site and architecture, and 6) pursuing ecological and sustainable architecture. These characteristics of contemporary earth architecture reflect the vernacular architecture inherited continually in architectural history. Therefore, contemporary earth architecture has been in line with contemporary architecture aiming for sustainability.

Analysis of the Work Breakdown Structure and Cost-Rate for Small Interior Works in Apartment (아파트 소규모 인테리어공사의 공종별 분류와 보할의 분석)

  • Kim, Chae-Yong;Lee, Jong-Gyu;Lee, Jae-Yong;Lee, Soo-Yong
    • Journal of the Korea Institute of Building Construction
    • /
    • v.10 no.1
    • /
    • pp.213-219
    • /
    • 2010
  • The research, based on 200 cases of small interior works in6 different floor area types of apartment in Busan, intended to compare the architectural work with the breakdown structure and analyze the cost of general small-scale interior work, by work type. The outcome of the research is outlined as follows. (1) Given the cost of small interior works for apartmentsranges from 10 million to 15 million won, which correspond to apartments ranging in size from $79.2m^2$ (24PY) to $105.6m^2$, it is necessary to implement a cost analysis for material cost and labor cost for these two types. (2) Given that small interior work for apartments comprises mostly finishing work, unlike the categoriesof general architectural work, it is more reasonable to classify the works into 9 categories,which include embellishment, wood, tile, paint, metal, toilet, sink & furniture, electric & mechanical and other works, instead of the 22 divisions stipulated in the Korean Architectural Standard Specification. (3) After reviewing the average cost of small interior work and rate by floor area, it was found thatthe average cost of 24PY was 10.5 million won, of which metal work accounts for 12.8%, embellishment work 17.8%, and toilet 19.7%, while sink & furniture appeared to be the highest with 22.1%, while for 32PY, average cost was 12.5 million won,which comprises 7.4% wood work, sink & furniture 20.2%, toilet 23.4% and embellishment work the highest at 28.6%, indicating that embellishment work accounts for the greater portion.

Preliminary Tests of Mortars Containing Magnetite as Fine Aggregate (자철석 혼입 모르터의 기초물성 연구)

  • Yoon, Sang Chun;Yang, Sung Chul
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.17 no.3
    • /
    • pp.82-88
    • /
    • 2013
  • In this project a preliminary experimental research work was done to apply mortars containing magnetite as fine aggregates unto floor finishing materials in order to make indoor environment eco-friendly and to have noiseproof control between floors. Crushed magnetites were substituted as sands in the mix design with a range of 0, 20, 40, 60, 100%. First far-infrared radiation tests to determine emissivity and emission power were done in accordance with the KICM test standard and an outstanding result was obtained. Density and compressive strength test results also showed that as the substitution increases, test values increase in a linear trend. However dry shrinkage test results revealed that as the substitution increases, shrinkage strain also increases. To clearly seek a solution about this problem, more experimental works should be done on oncoming experimental program.

Analysis of Defect Repair Cost by Work Type based on Defect Inspection of Apartments (공동주택의 하자진단에 기초한 공종별 하자보수비용의 분석)

  • Lee, Jin-Eung;Kim, Byung-Yun;Jeong, Byung-Joo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.5
    • /
    • pp.491-500
    • /
    • 2015
  • This study investigated defect status by work type, based on the report data of defect inspection results, acquired by consumers' request to safety inspection agencies, before the expiration of legal defect repair warranty period. In fact, the data was not acquired by centering on suppliers, namely, construction companies in relation with the defects becoming causes to increase construction cost of apartments. This study aims to provide objective and basic data for quality improvement at construction stage and for solution to defect disputes. The study results are presented below: (1) The number of defect cases occurring from architectural work among total work types were 1,986, defect occurrence rate was 62.5%, and defect repair cost was KRW $25,851/m^2$, which stood at 78.2% of the total work types. This means the defect occurrence rate and defect repair cost in architectural work are bigger than those of other work types. (2) Major defects in architectural work were revealed in the following order: cracks from frame work, inferior interior finishing work, inferior finishing work of plaster/masonry works, water leak/damage from waterproof work and withering/omission from landscape work. The total repair cost of the major selected defects was KRW $12,220/m^2$, and was analyzed to take up 37% of the total defect repair cost.

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.