Development of a Finishing-Mill Set Up Program for Calculating Pass Schedule In Mini Process (미니밀 마무리압연기의 Pass Schedule 설정 프로그램 개발)

  • 이호국;박해두;최갑춘
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 1996.03a
    • /
    • pp.101-109
    • /
    • 1996
  • Mini-mill process which is one of the new steel -marking technologies to be able to produce the hot rolled coils by thin slab caster of ISP(In-Line Strip Production) type, will be completed in the Kwangyang Steel Works of POSCO in August, 1996, SEt-Up Model of finishing mill which consists of 5 stands is the most basic and essential in mini-mill plant. Therefore, the simulation program of Finishing-mill Set-Up model were developed in this research , using new temeprature prediction model, roll gap model and rolling physical model. Using the developed FSU program , pass schedules to produce the strips with target strip thickness of 1.8mm, 2.0mm, 2.3mm, 2.7mm an d3.0mm were also determined respectively.

  • PDF

A Study on the Productivity Analysis of Finishing Works on Super High-rise Mixed_use Building (초고층 주상복합 건축물 마감공사의 공종별 생산성 비교에 관한 연구)

  • Hong, Bo-Bae;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Jun
    • KIEAE Journal
    • /
    • v.10 no.5
    • /
    • pp.165-170
    • /
    • 2010
  • Super high-rise mixed use buildings require a longer period for construction. Especially finishing work takes up about 40% of the whole construction period. Thus, finishing work is becoming an important factor in determining the construction period along with earth work and frame work. As the expected returns added by the reduction of the period and cost in constructing super high-rise mixed use buildings are huge, the expectations are now increasing for the possible gains. In this respect, as the period of finishing work is easier to be shortened than that of frame work, the efforts to acquire the technical knowledge to reduce the finishing work period are now being required. Accordingly, in this study, we aimed at suggesting the basic data for designing an economic plan for finishing-work procedure by analyzing the productivity of each work type of finishing work procedure on the basis of the execution and results of a construction method as a time-flexible finishing work plan. For this, we categorized the work types of finishing work procedure into each work unit and provided a work-system for each of them. Also, with case studies, we calculated the detailed amounts of the work-loads, required materials, productivity, and productivity index of the main work types of finishing work procedure and each of their separate work units as well as analyzed the relationship between the value results to suggest a better way to improve its productivity.

A study on characteristics of accidents involving horse scaffolds at construction sites (말비계 건설재해 특성 분석에 관한 연구)

  • Jeong, Seong-Chun
    • Journal of the Korea Safety Management & Science
    • /
    • v.18 no.1
    • /
    • pp.17-24
    • /
    • 2016
  • Many fatal and non-fatal injuries occurred as a result of unexpected falls from horse scaffolds during structural or finishing works such as painting, plastering, or plumbing. Therefore, this study is to improve safety standards for horse scaffolds used mostly in the interior finishing works. But hazard elements for the horse scaffolds has not been specifically identified. This study has analyzed the accidents of horse scaffolds to prevent construction accidents and the characteristics of a serious accidents related the horse scaffolds. It was suggested a safety management plan and a group of accidents characteristics. The results of this study are expected to be utilized as basic data for prviding a reference related to the horse scaffolds and to be unified the regulations associated with the horse scaffolds.

A Study on the Tendancy of Architecturalizing in lighting for a Residential building - Focus on the Interior Magazine from 2000 to 2009 - (주거공간조명의 건축화에 관한 연구 - 2000년부터 2009년까지 인테리어잡지를 중심으로 -)

  • Kim, Su-Jung;Lee, Sung-Me
    • Korean Institute of Interior Design Journal
    • /
    • v.20 no.1
    • /
    • pp.61-70
    • /
    • 2011
  • Based on the trend of architectural lighting of residential building, this study is to examine architectural lighting for residential buildings, and deduce the value and significance of architectural lighting by analyzing architectural lighting and characteristics of residential building through the analysis of works according to the types of works and by analyzing discourse relating to works of architectural lighting of residential building. First, architectural lighting for residential buildings can be categorized according to continuity and extensibility, lighting method and lighting factor. Second, architectural lighting of residential building has come into play since 2000 due to diversified activities at home. Third, architectural lighting had been introduced for living room and used in the form of structure or foundation up until early 2000s, but since mid 2000s, it has been used in intellectual and abstract form using various shapes, finishing material or objects. Fourth characteristic is a space of changing functions overcoming limited space, suggesting an alternative space, and using finishing material and object.

Comparing Performances of Natural Finishing Material for Finish on Earth Wall (흙벽 마감을 위한 천연 마감재 성능 비교 연구)

  • Hwang, Hey zoo;Kang, Nam Yi;Kim, Tae Hoon
    • KIEAE Journal
    • /
    • v.12 no.5
    • /
    • pp.71-76
    • /
    • 2012
  • As reviewed of developments of Korean earth architecture, earth-made buildings have been dwindled gradually since "the new community movement" and earth have been recognized as materials which are not so good to human health and in result, earth-related techniques have been also forgotten. However, recently the earth architecture has been more attracting back many attentions thanks to the people who are interested in health and wellbeing and the earth related techniques or skills got keenly required. The present study has investigated and reproduced earth finishing materials which are based on natural materials as basic stuffs to use them as the finishing materials of the modern earth architecture. For the test, the finishing materials have been divided roughly into sorts of pastes and oils. In case of applying finishing materials onto earth surfaces, the moisture permeability test was conducted to measure a water-absorbing speed, and at the case of using finishing materials for interior works moisture adsorption/desorption test was performed to verify the indoor humidity regulation ability, and further a test to check whether to be stained when contacted with the finishing materials, was conducted. If there is not any stain it might be recognized to be high quality of moisture adsorption/desorption and so seaweed pastes or starches might be used for paste finishing materials and for natural oils, beans are desirable in practical ways. As low-quantity of moisture adsorption materials, linseed oil is most desirable and also beaned water over75% are thought to be useful.

A Study on Analysis and Improvement of the Process of Furniture Work for High-rise Residential Building (초고층주거건축의 가구공사 프로세스 분석 및 개선방안에 관한 연구)

  • Kim Hyun-Woo;Song Young-Woong;Choi Yoon-Ki
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • autumn
    • /
    • pp.446-449
    • /
    • 2003
  • Recently, large residental buildings including high-rise apartment and a multi-business and commercial-residential building are appearing in the form of Korean construction work. According to this large-size trend a tenn and cost of construction works was largely increased. Therefore, studies of techniques construction management for successful project are lively being progressed. This study introduced Just-In-Time form and Lean Construction concept in order to establish management system of a house construction work taking up much portion on aspects of work scale and materials transportation in finishing works of high-rise residental building architecture. The process of house construction works will be analyzed with these two principles for productivity improvement and then the improvement plan will be suggested. This analysis and proposal can induce the flow of finishing works smoothly and contribute to success of project through saving of a tenn and cost of construction works.

  • PDF

Safety Management Information System in Plants Construction Work (플랜트 건설공사의 안전관리 정보시스템 개발)

  • Park, Jong-Keun
    • Journal of the Korea Safety Management & Science
    • /
    • v.14 no.4
    • /
    • pp.23-29
    • /
    • 2012
  • There are insufficient models that find problems and solutions for accident prevention through risk assessment and suggest safe work process and work instruction from foundation works to finish work for accident decrease. This paper presents a quantitative risk assessment model by analysis of risk factors in each process such as appurtenant works, temporary works, structural works, equipment work, finishing work and etc based on accident examples and investigation on actual condition in plants construction work. In addition, the safety management system was developed to perform risk assessment of plants construction and use it for effective safety training for labor.

A Study on the Secure method of Construction Workspace by using Building Information Modeling (BIM을 활용한 작업공간 확보 방안에 관한 연구)

  • Song, Dong-Hyeon;Lee, Sang-Beom;Song, Ho-San
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2011.11a
    • /
    • pp.9-10
    • /
    • 2011
  • Domestic construction industry suffered from the IMF and makes a great effort to improve in 'cost management', 'strengthening the competitiveness of the construction industry'. Therefore, the industry has become interested in improving the productivity of construction and ongoing research is being progressed in various angles. In such circumstances, the needs for a study of concepts and space of the actual construction work place is emerging. This study were utilized BIM to understand the types and causes of problems in space during the finishing work in construction and categorize importance and frequency of occurence through a survey of experts and AHP to analyze the realtive effects of importance then modeling to them to aware of issues and give direction for efficient management. This study is anylize the problem which is caused by same time process in finishing work progress of apartment applied by BIM. and categorize the type of work interference management in finishing work, and anylize by the type of occurence then predict the work interference management through in BIM 3D VIEW and suggest the solutions.

  • PDF

Special Technician Jeong Woo-tae's Activity and Role in the Governmental Construction Works during the Reign of King Jeong-jo and King Sun-jo of the Joseon Dynasty (정조.순조연간 관영공사에서 별간역(別看役) 정우태(丁遇泰)의 조영활동)

  • Kim, Dong-Uk
    • Journal of architectural history
    • /
    • v.16 no.3
    • /
    • pp.115-131
    • /
    • 2007
  • Jeong Woo-tae(?-1809) was a military official who had worked as Byeol-Gan-Yeok in the governmental construction works during the late 18th century through the early 19th century. Byel-Gan-Yeok, literally a special technician, was an official post in the governmental construction works that carries specific technical tasks from the mid 18th century. Over 30 years, Jeong Woo-tae had devoted himself in the construction of various royal tombs, city walls, and palace buildings. He showed superb and various techniques in the works of stone carving and architectural details. After finishing the construction of the tomb of King Jeong-jo's father successfully, he was appointed as a governor of a rural town. Being on duty of the governor, he used to participate in the construction works as a technician. He also made a couple of innovative devices in the field of construction, like a carrying apparatus, Byel-Nok-No. His works secured the setting up of the post of Byel-Gan-Yeok in the governmental construction system in the 19th century. But his technical achievement remained as his own private works rather than developing to the universal growth of the craftsmen's skill. This might be a limitation of the Byel-gan-Yeok's role, whose position was remained in the midway between official and craftsman.

  • PDF

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.