• Title/Summary/Keyword: Finish Drawing

Search Result 12, Processing Time 0.03 seconds

A Development of Finish Drawing Automation System for Improving Efficiency on BIM based Estimation (BIM 기반 견적업무 효율성 증대를 위한 마감설계자동화 시스템 개발)

  • Kim, Seong-Ah;Kang, Myung-Ku;Shin, Tea-Hong;Chin, Sang-Yoon;Yoon, Su-Won;Choi, Cheol-Ho
    • Proceedings of the Computational Structural Engineering Institute Conference
    • /
    • 2008.04a
    • /
    • pp.429-434
    • /
    • 2008
  • The objective of this paper is to introduce a project on developing Finish Drawing Automation System. The system aims to improve efficiency of the BIM-based estimation, which is realized by automatic derivation of three-dimensional geometry models of the finish details. First, overall workload differences between the drawing-based estimation methods and the BIM-based methods are analyzed. Second, an automated finish detail design method is proposed as a time-saving measure for the BIM-based estimation, as manual modeling accounts for the most time spent in the model-based estimation process. Finally, the proposed system is evaluated using a case of washboard design.

  • PDF

Drawing Segmentation Module for Management of Building Finish Details (마감상세도 관리를 위한 도면 블록화 모듈 개발)

  • Koo, Kyo-Jin;Park, Hyung-Jin;Joung, Jin-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.15 no.3
    • /
    • pp.329-337
    • /
    • 2015
  • Drawings in construction industry are an aggregation of knowledge containing various information generated in a number of projects. Finish details are generated by architects when they select details and methods of construction by spaces or elements. However it is so difficult to re-use details in existing drawing management systems because there are so many details in a sheet and there are several many kinds of sheets in a file. In this paper, a drawing segmentation algorithm is suggested for managing building finish details individually. Based on this algorithm, a system module for making detail blocks from files of finish details is developed. Using the drawing segmentation module, interfaces of drawing management system are suggested in the paper. Management of individual detail blocks helps to reduce of the time for searching and increases productivity of designed drawings. Also it would contribute to increase quality of designed drawings by reusing of knowledge in detail blocks.

Influence of Process Design Scheme on Product Qualities in Cylindrical Cup Drawing (원형컵 드로잉의 공정설계 변화에 따른 제품품질에 미치는 영향)

  • 이재명;이상민;최영윤;류호연;김종호
    • Proceedings of the Korean Society for Technology of Plasticity Conference
    • /
    • 2002.05a
    • /
    • pp.82-85
    • /
    • 2002
  • A systematic investigation for process design in deep drawing is necessary for quality improvement of drawn cups. This study has been concentrated mainly on the influence of process design scheme on product qualities in cylindrical cup drawing. Three types of process design scheme were chosen in this study. That is, Case 1 is to finish drawing a cup of 50m in diameter in one stage, Case 2 and Case 3 are redrawing the drawn cups of 55, 65 mm in diameter to the final size respectively. Though experiments the maximum drawing force in two-stage cup drawing could be reduced up to 35% as compared with that of one-stage cup drawing. In addition, the Case 2 and Case 3 processes showed better product qualities than the Case 1 process when comparing distributions of thickness, hardness, dimensional accuracy.

  • PDF

Delay Factors Based on the Importance of Finish Work in Apartment Construction Project (공동주택 마감공사 중요도 기반 작업지연 요인 분석)

  • Lee, Seung-Hoon;Lee, Sang-Hyo;Kim, Ju-Hyung;Kim, Jae-Jun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2010.05a
    • /
    • pp.125-129
    • /
    • 2010
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

  • PDF

A Case Study On The Suitability Of Drawings Through Application Of BIM In Construction Management (건설사업관리 분야에서 BIM적용을 통한 도서의 적합성 검토 사례)

  • Park, Young-Jin;Song, Kyung-Chul
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.05a
    • /
    • pp.33-34
    • /
    • 2017
  • The purpose of this case study is to reduce the flaw and reconstruction occur at the level of construction by determining the propriety of estimate and error on a drawing and specification at working design level through case studies of BIM application at the level of design review. As a preliminary to apply BIM technology, it is needed to review the drawing, and then it is required to define BIM range by selecting the section in which construction error occurs frequently except for the type of part that is constructed repeatedly. At the execution level, the drawing is reviewed vertically, horizontally and spatially by proceeding structure and finish modeling on the defined BIM range, and also the propriety of estimate and error on the drawing and specification are examined. We aim to raise the completion rate, improve quality of construction, reduce the cost for construction and shorten period of construction by preparing for the error on the drawing and specification in advance through this review procedures.

  • PDF

Analysis of Delay Factors Based on Importance of Construction Subject-classified in Apartment Finishing Works (공동주택 마감공사 공사주체별 작업지연 요인 분석)

  • Lee, Seung-Hoon;Kim, Yong-Man;Kim, Ju-Hyung;Kim, Jae-Junn
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.1
    • /
    • pp.73-81
    • /
    • 2011
  • The ultimate goal of construction is to complete the given work in the most economical and safest way within the required construction period while meeting the quality standards specified in the design drawing. There are a few characteristics of finish work. First, executed in subdivided processes, finish work involves a very diverse and complex structure. Second, there are no criteria for each segmented process with regard to the appropriate time of input. Third, it is not very necessary to set priorities for lead and lag works. This study intends to provide information on the completion of a project in accordance with the required duration by setting priorities in the delay of each detailed process of finish work to minimize delay in finish work. In this study, finish work is divided into wet work and other types of finish work, and the importance of each process is classified based on the given details of each process. In addition, the study employs a survey to analyze delay factors of a designer, a constructor, and a supplier. Using the survey results, the study sets priorities in delay of final work to provide information on the completion of an apartment project within the planned construction period.

Computer-Aided Process Planning and Die Design for Hot Forging of H-Shaped Plane Strain Components (평면변형 H-형재의 열간단조, 공정설계 및 금형설계)

  • Park, J.C.;Kim, B.M.;Kim, S.W.
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.11 no.2
    • /
    • pp.104-109
    • /
    • 1994
  • This research describes some developments of computer-aided process planning and die design for hot forging products of H-shaped plane strain produced by the press. The system is composed of three main modules(process planning module, die design module and simulation module) which are used independently or in all. Systm capabilities include as follows: 1. In die design module, using the results of process planning module, the shape and size of bolcker and finish die in each operation are determined and the ouput id generated in graphic form for manufacturing drawing. 3. In simulation module, the flow pattern of workpiece and the load/stroke curve are approximately predicted. Design rules for process planning and die design are extracted from plasticity theories, handbooks, relevant references and empirical know-how of field experts in hot forging companies. The developed system provides poweful capabilities for process planning and die design of hot forging products.

  • PDF

Documentation of the History of Ok-Cheon Catholic Church by standardized 2D CAD and 3D Digital Modeling (표준화된 2D CAD와 3D Digital Modeling을 이용한 옥천천주교회의 연혁 기록)

  • Kim, Myung-Sun;Choi, Soon-Yong
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.12 no.1
    • /
    • pp.523-528
    • /
    • 2011
  • Ok-Cheon catholic church has been changed 4 times since it's first construction in 1955. Prior three changes were small ones of windows, doors, roof finish etc. but the last alteration was the extension of it's plan from 一 shape to long cross shape and along with it the size, structure and form of it changed. This history of the church has not been recorded in drawing but only in text with indistinct features not documented. This study makes a new 2D CAD files using layers matched the changes and 3D digital models, these have not only present information but also change informations of the church. They are useful data for effective management, conservation restoration or possible reuse of it.

A Study on the Architectural Characteristics of Modern Railway Station in Gyeongju (경주관내 근대 철도역사(鐵道驛舍)의 건축적 특성에 관한 연구)

  • Choi, Moo-Hyun
    • Journal of the Korean Institute of Rural Architecture
    • /
    • v.14 no.3
    • /
    • pp.109-119
    • /
    • 2012
  • This study aims to analyze architectural characteristics of railway station facilities which were built with development of railroads from Japanese Colonial Period to 1950's. To achieve this goals, 7 railway stations in Gyeongju area that are worth preserving were set up as research targets. For this study, I analyzed literature of the railway station and drawings which the KORAL Daegu Branch is keeping. Railway stations without a construction drawing investigated a direct visit. After analyzing the railway station facilities, the architectural properties such as plan, elevation and section have been identified. The results are as follows. First, Each modern railway station is usually consisted of waiting room and office, and ancillary spaces have been added. Over the years, however, the space was expanded horizontally. In that case, the structure and finish materials have been changed, like now. Second, Most of the roof shape is 'Matbae'(gable roof), especially Gyeongju station and Bulguksa Station are 'Woojingak roof. The roof structure is truss structure, especially as Pratt and Scissors type, but Gyeongju Station's structure is a reinforced concrete. Third, main doorway of waiting room is located in the center of the front gable. However, small stations like 'Ahwa' and 'Ipsil' station to ensure the passengers' waiting area are placed next to the office area.

An Implementaion of Mobile e-storytelling Application for Creativity Development using Character Sticker Function (캐릭터스티커 기능을 활용한 창의력 증진용 모바일 e-동화 웹앱 구현)

  • Cho, Hee-Jung;Ahn, Da-Bin;Kim, Mung-Won;Park, Hwa-Jin
    • Journal of Digital Contents Society
    • /
    • v.13 no.4
    • /
    • pp.617-624
    • /
    • 2012
  • The purpose of this paper is to plan and implement e-storytelling for improving children's creativity, which consists of e-storytelling, thinking questions, and character sticker canvas. Especially It makes children draw paintings feel easier by character sticker. This webapp shows the flash animation e-storytelling and gives the question to answer by painting with a fertile imagination on the canvas as transforming the character sticker. A user can input the title of painting and store it when finish the drawing. This is an educational tool which makes educatees think more and express their ideas through questions. Therefore, we can check how much children's imagination is changed and diversed by the stored paintings.