• 제목/요약/키워드: Final Disposal

검색결과 141건 처리시간 0.021초

물질흐름분석을 통한 사업장폐기물의 실제적인 재활용률과 최종처분율의 산정 및 분석 (Calculation and Analysis of Actual Recycling Rate and Final Disposal Rate of Industrial Waste by Material Flow Analysis)

  • 오길종;조윤아;김지연;김기헌
    • 한국폐기물자원순환학회지
    • /
    • 제35권8호
    • /
    • pp.785-798
    • /
    • 2018
  • Since the Framework Act on Resource Circulation was enacted in 2018, the government should establish a National Resource Circulation Master Plan every 10 years, which defines mid- to long-term policy goals and directions on the efficient use of resources, prevention of waste generation and recycling of waste. In addition, we must set mid- to long-term and stepwise targets for the final disposal rate, recycling rate (based on sorted recyclable materials and recycled products), and energy recovery rate of wastes, and relevant measures should be taken to achieve these targets. However, the current industrial waste (IW) statistics have limitations in setting these targets because the final disposal rate and recycling rate are calculated as the ratio of the recycling facility input to the IW generation. In this study, the material flow from the collection stage to the final disposal of industrial waste was analyzed based on the generation of 2016, and the actual recycling amount, actual incineration amount, final disposal amount and their rates were calculated. The effect on the recycling, incineration and final disposal rates was examined by changing the treatment method of nonhazardous wastes from the factory and construction and demolition wastes, which were put in landfills in 2016. In addition, the variation of the waste treatment charge was investigated according to the change of treatment methods. The results of this study are expected to be effectively used to establish the National Resource Circulation Master Plan and industrial waste management policy in the future in South Korea.

PLUTONIUM MANAGEMENT OPTIONS: LIABILITY OR RESOURCE

  • Bairiot, Hubert
    • Nuclear Engineering and Technology
    • /
    • 제40권1호
    • /
    • pp.9-20
    • /
    • 2008
  • Since plutonium accounts for 40-50% of the power produced by uranium fuels, spent fuel contains only residual plutonium. Management of this plutonium is one of the aspects influencing the choice of a fuel cycle back-end option: reprocessing, direct disposal or wait-and-see. Different grades and qualities of plutonium exist depending from their specific generation conditions; all are valuable fissile material. Safeguard authorities watch the inventories of civil plutonium, but access to those data is restricted. Independent evaluations have led to an estimated current inventory of 220t plutonium in total (spent fuel, separated civil plutonium and military plutonium). If used as MOX fuel, it would be sufficient to feed all the PWRs and BWRs worldwide during 7 years or to deploy a FBR park corresponding to 150% of today' s installed nuclear capacity worldwide, which could then be exploited for centuries with the current stockpile of depleted and spent uranium. The energy potential of plutonium deteriorates with storage time of spent fuel and of separated plutonium, due to the decay of $^{241}Pu$, the best fissile isotope, into americium, a neutron absorber. The loss of fissile value of plutonium is more pronounced for usage in LWRs than in FBR. However, keeping the current plutonium inventory for an expected future deployment of FBRs is counterproductive. Recycling plutonium reduce the required volume for final disposal in an underground repository and the cost of final disposal. However, the benefits of utilizing an energy resource and of reducing final disposal liabilities are not the only aspects that determine the choice of a back-end policy.

사용후핵연료 심층처분을 위한 지하연구시설(URL)의 필요성 및 접근 방안 (Preliminary Review on Function, Needs and Approach of Underground Research Laboratory for Deep Geological Disposal of Spent Nuclear Fuel in Korea)

  • 배대석;고용권;이상진;김현주;최병일
    • 방사성폐기물학회지
    • /
    • 제11권2호
    • /
    • pp.157-178
    • /
    • 2013
  • 사용후핵연료 최종처분을 위해 심층처분은 세계적으로 가장 선호되는 방법이다. 이를 위해 선진국들은 자국 여건에 가장 잘 부합되는 고유의 처분시스템 개발에 주력하고 있거나, 일부 확보하여 상용처분사업에 적용하고 있다. 현재까지 알려진 대부분의 심층처분시스템은 공학적 및 천연방벽으로 구성된 다중방벽시스템이다. 이들 처분시스템은 수 천 년 ~ 수 십만 년 이상의 성능기간이 대하여 성능 안전성의 입증이 확인되어야 후속 상용처분사업에 적용 가능하다. 입증 현안과제들은 처분시스템의 상능 안전성 확보를 위해 수행되는 모든 행위 즉, 조사, 분석, 해석, 평가, 설계, 건설, 운영 및 폐쇄에 이르는 전 과정에 있어서 추진 과정과 결과에 대한 실현 가능성과 실증에 필요한 내용들이 해당된다. 이를 위해 대부분의 선진국들은 자국내 분포하는 대표적인 선호암종 지역에서 지하연구시설(URL)을 건설하여 실증 시연프로그램을 수행하거나 완성단계에 있다. 이 과정과 결과들은 후속되는 최종처분장 부지선정 과정에 평가기준으로 활용될 것이며, 최종처분시설의 성능 안전성평가에 필수적으로 적용하게 된다. 지하연구시설은 또한 규제-일반대중-전문가 등 다양한 이해당사자들로 하여금 심층처분의 안전성 수준에 대한 이해제고와 토론의 마당으로서 핵심적인 역할과 기능을 할 것으로 기대된다.

고리 1호기 원자로 압력용기 절단과 포장 방법에 따른 처분 물량 산정 (Evaluation on Radioactive Waste Disposal Amount of Kori Unit 1 Reactor Vessel Considering Cutting and Packaging Methods)

  • 최유정;이성철;김창락
    • 방사성폐기물학회지
    • /
    • 제14권2호
    • /
    • pp.123-134
    • /
    • 2016
  • 최근 국내에서는 월성 1호기 및 고리 1호기를 포함하여 운영 중인 원자력발전소가 노후화함에 따라 원전 해체에 대한 관심이 많이 증대되고 있다. 이와 관련하여 월성 1호기의 계속운전이 최근 결정되었으며, 고리 1호기의 경우 2017년 6월 영구정지하기로 결정되었다. 이에 본 논문에서는 상업용 원자로로서는 국내 최초로 해체가 예정된 고리 1호기에 대해, 원자로 압력용기 자체의 해체로 인해 발생하는 방사성폐기물 최종 처분량을 원자로 압력용기 절단 방법 및 방사성폐기물 처분용기를 고려하여 산정하였다. 처분용기를 고려한 방사성폐기물 처분량을 산정한 결과 원자로 압력용기 몸통 부위보다는 반구 형태의 헤드 부분을 작게 절단할수록 최종 처분량이 감소하는 것으로 예측되었다. 또한 경주 방폐장의 200 L 및 320 L 드럼 처분용 처분용기의 경우 무게 제한으로 인해 적재효율이 좋지 못한 것으로 나타났다.

Deployment of Radioactive Waste Disposal Facility with the Introduction of Nuclear Power Plants (NPP) in Kenya

  • Shadrack, A.;Kim, C.L.
    • Journal of Nuclear Fuel Cycle and Waste Technology
    • /
    • 제1권1호
    • /
    • pp.37-47
    • /
    • 2013
  • This paper describes basic plans for the development of a radioactive waste disposal facility with the introduction of Nuclear Power Plants (NPPs) for Kenya. The specific objective of this study was to estimate the total projected waste volumes of low- and intermediate-level radioactive waste (LILW) expected to be generated from the Kenyan nuclear power programme. The facility is expected to accommodate LILW to be generated from operation and decommissioning of nuclear power plants for a period of 50 years. An on-site storage capacity of 700 $m^3$ at nuclear power plant sites and a final disposal repository facility of more than 7,000 $m^3$ capacity were derived by considering Korean nuclear power programme radioactive waste generation data, including Kori, Hanbit, and APR 1400 nuclear reactor data. The repository program is best suited to be introduced roughly 10 years after reactor operation. This study is important as an initial implementation of a national LILW disposal program for Kenya and other newcomer countries interested in nuclear power technology.

폐기물처리시설 입지선정에 따른 사례연구 (A Case Study for Site Selection of the Waste Treatment Facilities)

  • 이해승
    • 환경위생공학
    • /
    • 제19권1호
    • /
    • pp.24-36
    • /
    • 2004
  • This study is to investigate the present condition of waste disposal establishment and to analysis problems which could be produced at location selection formalities of waste disposal establishment. It proposed building methods of waste disposal establishment to lead spontaneous participation of local resident according to case analysis of waste disposal establishment. There are research results; i) Opposition of inhabitants was the majority of reason at the business abandonment or delay of waste disposal establishment. Therefore agreement formation course with local inhabitants is most important position. ii) Many estimate have been needed for waste disposal establishment, but support estimate of government was 30-50% that is really low compare with other environmental establishment. So that it need to increase of government estimate. iii) Location collection is carried out based on law and final collected location must be executed without delay of relation business as soon as possible. iv) Standard of location collection has to divide into small, middle and large size and to apply with same rule according to divided location. v) It must be change public subscription before and location selection after and maintain continuance of information offer to local inhabitants and offered information. vi) after building of waste disposal establishment for solving distrust of waste disposal establishment. It must be planed and carried on useful support countermeasure to local inhabitants in actuality.

중수로 사용후핵연료 처분시스템의 방사선 안전성 평가 (Radiation Safety Assessment of CANDU Spent Fuel Disposal System)

  • 국동학;조동건;최희주
    • Journal of Radiation Protection and Research
    • /
    • 제35권4호
    • /
    • pp.142-150
    • /
    • 2010
  • 중수로 사용후핵연료의 처분 효율을 높이기 위하여 새롭게 제안된 처분 시스템에 대한 방사선량을 MCNPX를 사용하여 계산함으로써 이 시스템의 방사선 안전성을 예비적으로 평가하고자 하였다. 이를 위해서 처분시스템의 각 요소에 대한 구성, 제원, 재질 등을 분석하였으며, 그에 상응하는 모델링을 수행하였다. 선량평가는 주요 구성요소에 대하여 수행하였으며, 평가결과 내부 구성요소에 대해서는 방사선량이 높은 편이었으나, 최종적인 처분시스템은 방사선에 대한 안전성이 높은 것으로 나타났다.

수평 터널방식 고준위폐기물 처분시스템 주변 열 해석 (Thermal Analysis of a Horizontal Disposal System for High-level Radioactive Waste)

  • 최희주;김인영;이종열;김현아
    • 터널과지하공간
    • /
    • 제23권2호
    • /
    • pp.141-149
    • /
    • 2013
  • 경수로 사용 후 핵연료의 파이로 공정 처리를 통해 예상되는 고준위폐기물 처분시스템을 대상으로 열적 성능평가를 수행하였다. 처분방식으로 수평 처분터널 처분시스템을 고려하였다. 수평 처분터널 간격 25 미터와 처분공 간격 2미터를 대상으로 평가하였다. 세라믹폐기물 수평 처분터널 주변의 다양한 위치에 대해 장기간 동안 열 해석을 통하여 온도 변화를 해석하였다. 열 해석은 ABAQUS 프로그램을 이용하였다. 열 해석 결과에 의하면 처분시스템 중 어느 부분에서도 최고 온도가 $100^{\circ}$를 넘지 않아, 열적 성능 기준을 만족하였다. 열 해석 결과에 따르면, 처분시스템 중앙에 위치한 처분용기 주변이 외곽에 위치한 것의 주변보다 최고 온도 기준으로 약 $3^{\circ}$정도 높았다. 이것은 처분시스템 설계시 가능한 외곽에 위치한 처분용기가 많도록 설계하는 것이 처분밀도를 향상시킬 수 있음을 시사하였다.

사용후핵연료 최종처분장 건설과정에서의 굴착손상영역(EDZ)의 현장평가 방법 및 시공품질관리 체계에 관한 사례검토 (A Review of In-Situ Characterization and Quality Control of EDZ During Construction of Final Disposal Facility for Spent Nuclear Fuel)

  • 김형목;남명진;박의섭
    • 터널과지하공간
    • /
    • 제32권2호
    • /
    • pp.107-119
    • /
    • 2022
  • 사용후핵연료 최종처분장 건설 과정에서 발생하는 굴착손상영역(EDZ)은 처분시설의 역학적 안정성 및 처분공 간격 설정 등의 설계요소로서 고려해야 할 뿐만 아니라 영역 내 투수특성은 폐쇄 후 지하수 유입량 변화에 따른 처분용기 부식 속도 및 핵종유출 등에도 막대한 영향을 미치게 된다. 따라서, 처분시설 및 관련 지하연구시설(URL)의 건설과정에서는 EDZ의 발생양상을 현장에서 정확하게 파악하고 미리 규정된 요건을 만족할 수 있도록 철저하게 관리할 수 있어야 한다. 이 논문에서는 핀란드 온칼로 시설에서의 EDZ 관련 연구사례를 검토하고 처분시설 굴착과정에서의 EDZ의 현장평가방법 및 시공품질관리 체계에 대해 검토하였다. EDZ 현장 평가를 위해서는 굴찰 갱도 주변의 교란을 유발하는 시추공 굴착이 불필요한 GPR 탐사가 가장 적합함과 온칼로 처분시설의 EDZ는 바닥부에서 두드러지게 발생하여 0~70 cm의 두께로 발생함을 확인하였다. 이들 결과는 국내 처분환경에 적합한 EDZ 관련 규제요건 개발에 유용한 정보를 제공할 수 있을 것으로 기대된다.