• Title/Summary/Keyword: Field installation test

Search Result 275, Processing Time 0.031 seconds

Improvement of the PVC Window Frame Installation Method Integrated with Gangform and Field Applicability Analysis

  • Choi, Hyo-Sung;Lee, Jeong-Ho;Yoo, Huyn-Seok;Kim, Young-Suk;Han, Seung-Woo
    • Journal of the Korea Institute of Building Construction
    • /
    • v.11 no.5
    • /
    • pp.482-500
    • /
    • 2011
  • In apartment housing construction, window frame installation work, which is conducted after the structural framework, is very important, because its completion time directly affects the starting time of successive interior finishing works, as well as the overall construction period. Construction delays in interior finishing works might occur due to problems inherent to the conventional window frame installation method, such as the poor verticality of window frames, and the water leakage around them. The primary objective of this study is to analyze the problems of a 'Gangform integrated PVC window frame pre-installation method' based on its pilot test results. Next, this study proposes an improved conceptual model that enables the end users to enhance the field applicability of this method in terms of productivity, time, and cost. The field applicability of the proposed 'Gangform integrated PVC window frame pre-installation method' was also verified through a survey.

A Study About the Application Feasibility of EMS IEC 61000-4-6 Test Standard on Electronic Power Meter (전자식 계기 IEC 61000-4-6 EMS 시험표준 적용 타당성 연구)

  • Kim, Seok-Gon;Park, Chang-Ho;Shin, Dong-Yeol;Song, Tae-Seung;Choi, Yong-Sung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.60 no.6
    • /
    • pp.1261-1267
    • /
    • 2011
  • Electricity meters using in Korea are about 1.8 million units. From among these, electronic meters for high voltage, about 170 thousand units were installed to the digital type meter and ones for low voltage installed hundreds of thou-sands of meters through a model project. Recently, low voltage meter are expected to complete the installation within several years. Domestic power metering technology is being beyond a simple framework with an electronic type and is rapidly evolving to intelligent smart metering systems in conjunction with promotion of a national smart grid project. Accordingly, it is important to ensure an immunity of meter for electromagnetic field and environmental noise at the installation site. In this paper, we are going to check the validity of international standard that focusing on RF electromagnetic field immunity of meter to secure the quality and improve the reliability in field operation of meter. And we will verify the validity of test specification focused on actual installation environment and are going to offer the improvement plan of test standard.

Evaluation of Installation Damage Factor for Geogrid using Maximum Particle Size of Backfill Material (뒤채움 최대입도를 이용한 지오그리드 보강재의 시공손상계수 산정 방법)

  • Kim, Kyung-Suk;Choi, Young-Chul;Kim, Tae-Soo;Lim, Seoung-Yoon
    • Journal of the Korean Geosynthetics Society
    • /
    • v.6 no.4
    • /
    • pp.29-37
    • /
    • 2007
  • Reduction Factor for Installation Damage required for calculation of design strength of geogrid used in MSEW(mechanically stabilized earth wall) design is usually obtained in the field test simulating real construction condition. However, damages occurred in geogrid during backfill work are influenced by many factors such as polymer types, unit weight per area, backfill construction method and gradation of backfill material and field test considering these factors demands lots of time and costs. In this study, factors affecting installation damage are analyzed and empirical method for evaluating reduction factor for installation damage using maximum particle size in backfill material is suggested.

  • PDF

Study on the dataset conformance testing IEC 61850 based IED (IEC 61850 IED대상 데이터세트 적합성 시험에 관한 연구)

  • Lee, N.H.;Jang, B.T.;Kim, J.H.
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2008.10a
    • /
    • pp.371-374
    • /
    • 2008
  • KEPRI has carried out IEC61850 communication conformance test about the IED trial products. This paper describes dataset conformance testing, one of the IEC 61850-10 conformance test items, and test procedures on IED. KEPRI plans to construct the testing field of IEC 61850 based substation automation system with domestic IEDs confirmed their IEC 61850 communication service including dataset.

  • PDF

The field-test for single line-to-ground fault by an artificial fault generator (인공고장 발생장치(AFG)를 이용한 지락고장 실증시험)

  • Choi, Sun-Kyu;Kim, Dong-Myung;Kang, Moon-Ho
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.11a
    • /
    • pp.97-100
    • /
    • 2004
  • This paper introduced an artificial fault generator which was operated in the Go-Chang field-test center and explained the result of single line-to-ground fault by AFG. The AFG can basically experiment line-to-line and line-to-ground faults. This facility directly connected distribution transmission lines, so the test results are very useful for power system analysis and protection. Using the function of the AFG, we briefly said the test methods ud results for the 22.9[kV-v] and $6.6[kV-{\Delta}]$ system.

  • PDF

A Tuning Method for the Power System Stabilizer of a Large Thermal Power Plant and Its Application to Real Power System : PART II - Field Tests and Verification of PSS Performance (대형 화력발전기 전력계통 안정화장치(IEEEST-PSS)의 정수선정 기법과 실계통 적용: PART II - PSS 현장 성능시험 절차 및 성능검증)

  • Shin, Jeong-Hoon;Nam, Su-Chul;Baek, Seung-Mook;Song, Ji-Young;Lee, Jae-Gul;Kim, Tae-Kyun
    • Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
    • /
    • v.25 no.8
    • /
    • pp.114-121
    • /
    • 2011
  • This paper, as the second part of the paper, dealt with the field test and test results to validate PSS(Power System Stabilizer) parameters which are previously tuned in Part 1 paper. In Part 1 of the paper, the selection of parameters such as lead-lag time constants for phase compensation and system gain was optimized by using linear & eigenvalue analyses and they were verified through the time-domain transient stability analysis. In part 2, the performance of PSS was finally verified by the generator's on-line field test. Through the comparisons of simulation results and measured data before and after tuning of the PSS, the models of generator and its controllers including AVR, Governor and PSS used in the simulation are verified and confirmed.

Long-Term Performance of Geosynthetic Reinforcement Materials with Field Installation Condition

  • Jeon, Han-Yong;Mok, Mun-Sung;Cho, Seong-Ho;Byun, Sung-Weon;Lee, Joon-Seok
    • Proceedings of the Korean Fiber Society Conference
    • /
    • 2003.10b
    • /
    • pp.305-306
    • /
    • 2003
  • In the case of the geosynthetics usage to soil structure, there are some damages by compaction. And these damages by the installation compaction result in the unexpected changes of short and long term properties of the structure. So in the case of index test, there are some problems to the exact evaluation on the installation damage. Therefore, to the more definite evaluation on the installation damage of geosynthetics, the real site installation damage test is encouraged. (omitted)

  • PDF

A Study on the Test and Installation Standards of the Video Fire Detector (영상화재감지기 시험과 설치기준에 관한 연구)

  • Lee, Jeong-Hyun;Baek, Dong-Hyun
    • Fire Science and Engineering
    • /
    • v.30 no.4
    • /
    • pp.1-5
    • /
    • 2016
  • This research performed tests of Video Fire Detector and criteria of installation to make suggestions regarding the criteria that must be reflected in NFSC 203 by comparing the standards of FM Approvals, UL, ISO7240 and NFPA 72. FM Standard related to Video Fire Detector test has been classified as Smoke, Flame type, but the UL Standard has classified only as a Smoke type. This research examined 6 cases of fire phenomenon detection case in ISO 7240 and 3 cases in NFPA 72, respectively. There are 15 items required for the installation standard of a Video Fire Detector and each field standard is presented as a per installation method. To apply a Video Fire Detector, the pertinent items (the definition of term, detector's classification, structure and function among its test item) must be inserted. In addition, 7 items of the fire test, i.e., the sensitivity adjustment, prevent false alarm, ambient temperature test, the effective sensitivity and detection distance and viewing angle, aging test, flood test, must be applied to the actual test. For installation in the field, the operation environment and levels of illumination, and NFSC 203 must be set, and standards relevant to the sound system, indicators' installation distance, etc. need to be inserted.

Analysis on the Discharge Capacity of Vertical Drains Installed in the Field (현장에 타설된 연직배수재의 통수능력 분석)

  • 박영목;진규남;정하익;정길수
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2000.03b
    • /
    • pp.512-519
    • /
    • 2000
  • The discharge capacity of vertical drains installed in the field is reduced with time elapsed after installation due to deformation of drains and clogging effect. Discharge capacity of two types of vertical drains was analysed about three years after installation in the subsoil. Discharge capacity of two types of vertical drains were measured by small, middle, and large scale test apparatus. The results indicate that the discharge capacity of vertical drains after three years operation dramatically decreased compare to the initial discharge capacity.

  • PDF

Introduction of the field - test evaluation system in KEPCO (배전 실증시험장 시스템 현황 소개)

  • Kim, Dong-Myung;Choi, Sun-Kyu;Jang, Sang-Ok;Oh, Jae-Hyoung
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2004.05a
    • /
    • pp.81-85
    • /
    • 2004
  • This paper describes the testing facility to demonstrate the performance of the distribution class circuit breakers and switchgears and the testing methods. The field-test evaluation system consists of two parts. One is the distribution system for simulation of the condition on interruption mode of switches which are installed in the system and tested by the AFG(Artificial Fault Generator) and the thunderbolt generator just like in the real field. The other is a laboratory for confirmation or the important characteristics regarding to the insulation, gas, environment durability of equipment. For the fatal failure mode, a FMEA(Failure Modes and Effects Analysis) technique which is a kind of a structural analysis to consider a counter-plan was emploved.

  • PDF