• Title/Summary/Keyword: Field Construction Process

Search Result 873, Processing Time 0.029 seconds

A Study on the Online Fault Detection System to construct the knowledge based Maintenance System of Intelligent Highway Information System (지능형 도로정보체계의 유지관리 지식기반 구축을 위한 온라인 고장검출 시스템 연구)

  • Ryu, Seung-Ki;Choi, Do-Hyuk;Choi, Tae-Soon;Moon, Hak-Yong;Kim, Young-Chun;Hong, Gyu-Jang
    • Proceedings of the KIEE Conference
    • /
    • 1999.07b
    • /
    • pp.677-679
    • /
    • 1999
  • This paper introduces a implementation of fault detection for national highway line 3. Fault detection system was installed and operated on national highway line 3, environmental elements caused by abnormal status or faults has often happened. Therefore, the function of fault detection system is to speedy notify fault site, cause as well as scale of fault to manager. Though the fault detection and diagnosis system has been imported in the field of process of water and electric power, it is just beginning step in the field of ITS(Intelligent Transportation Systems). In general, Maintenance system is performed the online/offline process of detection, diagnosis and measure. This paper is studied online detection process, which is realtime remote detection.

  • PDF

Application of Geomagnetic Field-Based Indoor Positioning Technology in the Formwork Stage (거푸집공사 단계에서의 지구자기장 기반 작업자 실내측위기술 적용 방법)

  • Kim, Hyungjun;Lee, Changwoo;Kim, Hyeonmin;Ahn, Heejae;Lee, Changsu;Cho, Hunhee
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2023.05a
    • /
    • pp.213-214
    • /
    • 2023
  • Positioning information of workers is important for safety management at construction sites. Among the various indoor positioning technologies, geomagnetic fields-based technology is more economical and has less error than other technologies. However, there is a problem that the installation and dismantling of materials such as formwork at construction sites can cause degradation in positioning performance. Therefore, in this study, the distortion of the geomagnetic field near euro-form was quantitatively measured and the application method of geomagnetic field-based indoor positioning technology on formwork stage was presented. The results showed that the distortion occurred within 10cm of the wall and column form, but positioning accuracy could be affected up to 60cm from the form due to the characteristic of geomagnetic field-collecting technology. Therefore, applying this technology to the formwork stage requires complementary measures, such as using other positioning techniques up to 60 cm near the formwork, or excluding distorted area when positioning. It is expected that this study can contribute to the efficient safety management of workers by suggesting ways to prevent an increase in positioning error when applying geomagnetic field sequence-based indoor positioning technology during the formwork stage.

  • PDF

An Analytic Hierarchy Process based Decision Support System for Selecting Foundation Practice (계층분석법 기반의 기초공법 선정 의사결정지원시스템)

  • Lee, Chung-Hyun;Jeong, Keun-Chae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.13 no.1
    • /
    • pp.129-139
    • /
    • 2012
  • It is one of the most important decision making problems to select the adequate foundation practice for the downtown construction project. However the foundation practice has not been selected systematically yet by considering various construction field conditions in many projects. The foundation practice is often informally selected on the basis of only past experiences and skilled engineer's opinion. For making the selection process systematically, in this study, we propose a decision support system (DSS) for selecting foundation practices based on the Analytic Hierarchy Process (AHP) and the Preference Function (PF). In the proposed DSS, the AHP is used for making the selection process more reasonable and the PF is used for considering the decision maker's preference. To validate the proposed DSS, we apply the proposed DSS to the pre-performed construction projects. The application results show that the proposed DSS gives the same foundation practices with the implemented foundation practices that the skilled foundation engineers select after carefully analyzing construction field conditions. The proposed DSS can be used as a useful tool for making decisions to select the foundation practice in the construction fields.

The Use of Orbital TIG Welding Process for the Construction and the Repair of Field Piping (자동 오비탈 TIG 용접기술을 이용한 배관 용접)

  • 정인철;심덕남
    • Proceedings of the KWS Conference
    • /
    • 2004.05a
    • /
    • pp.27-29
    • /
    • 2004
  • Orbital TIG welding process being used fur the new construction, the repair of nuclear piping system ana other critical piping. When weld quality is important or there are a large number of similar weld to be made or when access is restricted with manual torch, Orbital TIG welding is most effective process because of practical for out-of-position and high weld quality. Furthermore, typically superior to manual TIG welding process where the pipe remains in place and the tungsten electrode orbits the weld. As smaller and more compact welding head is being developed, could operate in tight spaces and lend itself to this type of application better than any other welding process. Orbital TIG welding has become more and more field practical process.

  • PDF

CONCEPTUAL MODEL OF RFID APPLICATION IN PREFABRICATION INSTALLATION PROCESS

  • V. Peansupap;T. Tongthong;B. Hasiholan
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.279-288
    • /
    • 2007
  • Attempts to achieve a higher productivity have led studies to focus on process improvement. Information has been found as an essential element for process improvement. This research has introduced and focused on two types of information, namely: related jobsite information along the process and feedback information. Related jobsite information along the process which needs to be processed and delivered in a timely manner, accurate, and real time is required to streamline the decision making process. Whereas feedback information about process' current practices which have to be captured and stored is a useful for continuous improvement in identifying the problem origin and determining corrective action. In the current practices, although these two types of information are essential for process improvement, construction process has faced barriers in obtaining that information. Therefore, this research will propose a new information system to overcome the aforementioned barriers. The new information system consists of RFID as an automatic identification and data collection device integrated with database to support construction processes. The new system attempts to provide related jobsite information along the process and feedback information to support decision making process and continuous process improvement respectively. A case study of prefabrication installation process in housing projects has been selected to be implemented in conceptual model of RFID application in construction industry. Conceptual model will be presented in this paper as an initial stage of this ongoing research. Expected outcomes of the new system and future works will be discussed briefly.

  • PDF

Development and Application of Construction Control System for Excavation (굴착 관리 정보화 시스템의 개발 및 적용)

  • 권오순;정충기;김재관;이해성;김명모
    • Journal of the Korean Geotechnical Society
    • /
    • v.15 no.4
    • /
    • pp.153-166
    • /
    • 1999
  • Since the reliability of results by the existing analyzing method is low, in the case of for excavation performed in urban area whose stability is of great importance, construction control based on field monitoring is always necessary. But the field monitoring reflects only the behavior of construction process that has already been carried out, and it has limitations in predicting the behavior of the expected construction process, which is practically more important for construction control. In this study, construction control system for excavation which can predict the behavior of the expected processes during construction with high degree of accuracy, is developed by adopting inverse analysis. The inverse analied applied field monitoring results to excavation analysis can improve the reliability of predicted results. The developed system uses an elasto-plastic soil spring model for the excavation analysis and the minimization of least squared errors between measured displacements and calculated displacements for the inverse analysis. All the required processes for construction control can be performed as an integrated work within the system reflecting real time application and user's convenience. Their applicabilitis are confirmed by two case studies.

  • PDF

Construction Lean Process Development and Application for Field Productivity Improvement (건설 현장 생산성 향상을 위한 Lean 프로세스 개발과 적용에 대한 연구)

  • Kim, Yong-pyo;Jeong, Yong-ho;Lee, Min-jae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.21 no.2
    • /
    • pp.88-97
    • /
    • 2020
  • Practical and efficient application of lean construction, which has been proposed as an alternative to the limitations of traditional construction management methods, was developed to facilitate application on site and improve productivity through the fusion of traditional construction management methods. The concepts of Lean Time and Lean Cycle Time, which are the principles of lean construction, were introduced to eliminate waste and smooth flow production and pursuit of perfection, and the goal of establishing and improving the criteria for measurement and improvement was established and the information collection template was configured and applied to ensure reliability of measurement and analysis. Based on this, the project feasibility, reliability, and continuous improvement process were applied to the Field case to verify its effectiveness.

Developing an Optimized Scheduling Process Model for Controlling the Noise in Construction Field (건설현장 소음제한을 고려한 최적 스케줄링 프로세스 모델 개발)

  • Lee, Seung-Hak;Son, Jea-Ho;Lee, Seung-Hyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.14 no.5
    • /
    • pp.467-476
    • /
    • 2014
  • According to the expanding of construction machinery works, the number of civil complaints demanding compensations are increasing continuously from surrounding residents due to the noise from construction fields. However, the noise is usually managed restrictedly during the construction phase rather than prevented in advance. So, the efforts to solve the noise problem are occurring only after complaints have been made. Also, excessive cost and time consuming in order to solve the complaints negatively affects to construction companies. Therefore, the purpose of this study is to develop an optimized scheduling process model for controlling the noise in construction field by considering the planned time, cost, and the number of equipment before construction. In addition, this process model is expected to provide a useful information about the cost comparison between the original planned cost plus compensation and the optimized cost considering noise limitation so that the site managers can manage their projects effectively.

A Study on Application of Lean Construction Theory in Schedule Management (린 건설 공정관리이론의 현장적용에 관한 연구)

  • Jung, Joo-Young;Kwon, Won;Park, Sang-Jun;Chun, Jae-Youl
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.515-518
    • /
    • 2006
  • Construction project has various effective factor and many producer in multifarious process of the work. Thus it has many variation. However, Process management up to now is management method of conclusion oriented. So, it do not consider sequency and variation occurrence. In a result that a lot of problems happen. Lean Construction can solve limit of the present management method. And Lean Construction is estimated new management method of process management for reliance on process plan, safety of process and promotion of effectiveness. This study analysed application of real construction project in Lean Construction theory and examined to utilize VSM and TACT for field application.

  • PDF

LIFT CYCLE PREDICTION METHOD FOR THE SELECTION OF LIFT EQUIPMENT IN SUPER TALL BUILDING CONSTRUCTION

  • Seo-kyung Won;Choong-hee Han;Junbok Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.153-160
    • /
    • 2009
  • The demand for super tall building construction is increasing worldwide. There has been a constant request for achieving early payback on investment by shortening the construction time. This pertains especially for the case of huge investment projects such as super tall building construction. It is very important to shorten the construction time for the building framework, which requires substantial construction time and cost, and this is directly related to the establishment of an optimum lift plan for construction. When there is a problem in the selection of the lift equipment, it is almost impossible to revise the selection, resulting in a possible failure of the project. Thus, the purpose of this study is to analyze the function and logic for the development of the process for the selection of lift equipment for super tall building projects and further development of making the analyzed process into a system. In line with this research objective, the process of selecting the optimum lift equipment by domestic construction company was investigated and analyzed as well as collecting the actual field data. The actual data were obtained by sensors installed on tower cranes at three construction sites with the help from the construction company.

  • PDF