• Title/Summary/Keyword: Feasibility studies

Search Result 1,126, Processing Time 0.03 seconds

A Study on the Effective System of the Construction Arbitration (건설중재 활성화를 위한 시스템 구축방안 연구 - 미국의 건설중재운영시스템을 중심으로 -)

  • Kim Suk-Chul
    • Journal of Arbitration Studies
    • /
    • v.14 no.1
    • /
    • pp.103-132
    • /
    • 2004
  • This paper suggests the establishment of construction arbitration tribunal in The Korean Commercial Arbitration Board or the construction arbitration institution under the Ministry of Construction for effective system of Construction Arbitration. Our conclusion tells that it is desirable to establish construction arbitration institution under the Ministry of Construction upon the result of analyzing some factors such as participation of construction workers, sophistication of construction field. In contrast, it is more desirable to establish the construction arbitration tribunal in The Korean Commercial Arbitration Board when we consider the feasibility, sophistication of ADR, organization, rules, arbitrator availability, internationalization Therefore, our final suggestion is to establish construction arbitration tribunal in The Korean Commercial Arbitration Board for effective system of Construction Arbitration. More detailed are as follows: . Establishment of the committee for resolution of construction disputes consisting of experts and specialists from construction-related institution, union, law firm and universities. 1 The committee manages finance, rules on construction arbitration and arbitrator members. 1 Establishment of intermediation team, construction arbitration team, housing arbitration team, real estate arbitration team under the construction arbitration tribunal . Establishment of a committee of arrangements consisting of experts and specialists from The Korean Association of Arbitration Studies, Korea Arbitrators Association, The Korean Commercial Arbitration Board, The Construction Association of Korea in order to accomplish effective system for construction arbitration.

  • PDF

Issues in the Design of Molecular and Genetic Epidemiologic Studies

  • Fowke, Jay H.
    • Journal of Preventive Medicine and Public Health
    • /
    • v.42 no.6
    • /
    • pp.343-348
    • /
    • 2009
  • The final decision of study design in molecular and genetic epidemiology is usually a compromise between the research study aims and a number of logistical and ethical barriers that may limit the feasibility of the study or the interpretation of results. Although biomarker measurements may improve exposure or disease assessments, it is necessary to address the possibility that biomarker measurement inserts additional sources of misclassification and confounding that may lead to inconsistencies across the research literature. Studies targeting multi-causal diseases and investigating gene-environment interactions must not only meet the needs of a traditional epidemiologic study but also the needs of the biomarker investigation. This paper is intended to highlight the major issues that need to be considered when developing an epidemiologic study utilizing biomarkers. These issues covers from molecular and genetic epidemiology (MGE) study designs including cross-sectional, cohort, case-control, clinical trials, nested case-control, and case-only studies to matching the study design to the MGE research goals. This review summarizes logistical barriers and the most common epidemiological study designs most relevant to MGE and describes the strengths and limitations of each approach in the context of common MGE research aims to meet specific MEG objectives.

Application of steel-concrete composite pile foundation system as energy storage medium

  • Agibayeva, Aidana;Lee, Deuckhang;Ju, Hyunjin;Zhang, Dichuan;Kim, Jong R.
    • Structural Engineering and Mechanics
    • /
    • v.77 no.6
    • /
    • pp.753-763
    • /
    • 2021
  • Feasibility studies of a reinforced concrete (RC) deep pile foundation system with the compressed air energy storage (CAES) technology were conducted in previous studies. However, those studies showed some technical limitations in its serviceability and durability performances. To overcome such drawbacks of the conventional RC energy pile system, various steel-concrete composite pile foundations are addressed in this study to be utilized as a dual functional system for an energy storage medium and load-resistant foundation. This study conducts finite element analyses to examine the applicability of various composite energy pile foundation systems considering the combined effects of structural loading, soil boundary forces, and internal air pressures induced by the thermos-dynamic cycle of compressed air. On this basis, it was clearly confirmed that the role of inner and outer tubes is essential in terms of reliable storage tank and better constructability of pile, respectively, and the steel tubes in the composite pile foundation can also ensure improved serviceability and durability performances compared to the conventional RC pile system.

Feasibility Study of CNN-based Super-Resolution Algorithm Applied to Low-Resolution CT Images

  • Doo Bin KIM;Mi Jo LEE;Joo Wan HONG
    • Korean Journal of Artificial Intelligence
    • /
    • v.12 no.1
    • /
    • pp.1-6
    • /
    • 2024
  • Recently, various techniques are being applied through the development of medical AI, and research has been conducted on the application of super-resolution AI models. In this study, evaluate the results of the application of the super-resolution AI model to brain CT as the basic data for future research. Acquiring CT images of the brain, algorithm for brain and bone windowing setting, and the resolution was downscaled to 5 types resolution image based on the original resolution image, and then upscaled to resolution to create an LR image and used for network input with the original imaging. The SRCNN model was applied to each of these images and analyzed using PSNR, SSIM, Loss. As a result of quantitative index analysis, the results were the best at 256×256, the brain and bone window setting PSNR were the same at 33.72, 35.2, and SSIM at 0.98 respectively, and the loss was 0.0004 and 0.0003, respectively, showing relatively excellent performance in the bone window setting CT image. The possibility of future studies aimed image quality and exposure dose is confirmed, and additional studies that need to be verified are also presented, which can be used as basic data for the above studies.

A financial feasibility study of the Mini-Solar Penal Subsidy Program in Seoul (서울시 태양광 보급 정책의 적정보조금 산정에 관한 연구 - 수용자적 입장에서의 재무성 분석을 중심으로 -)

  • Yeom, Sungchan;Lee, Eungkyoon
    • Journal of Environmental Impact Assessment
    • /
    • v.24 no.4
    • /
    • pp.317-331
    • /
    • 2015
  • A major barrier to the spread and vitalization of renewable energy lies in its economic infeasibility. And yet, there is a disparity in estimating the economic feasibility between supply and demand sides. Taking this into account, we calculate an appropriate level of mini-solar panel subsidies provided by the Seoul metropolitan government. More pointedly, this research investigates the receptivity and social equity of the subsidy program based on the analysis of the program's financial feasibility. The results show that the subsidies can have anticipated effects for the heavy electricity consumption group but not for the low electricity consumption group. Specifically, estimated pay-back periods for groups of 401kWh ~ 500kWh (per month) users, 201 kWh ~ 400kWh users and 101kWh ~ 200kWh were approximately 5years, 8 ~ 9 years and 12 years, respectively. This implies that differential scales of the subsidies can better contribute to reducing regressive difference between the groups and meeting the goal of social equity in regards to energy justice.

A Study on the Direct connection Service Effectiveness in Gyeongbu(KTX) (경부선(KTX) 직결운행 도입 효과에 관한 연구)

  • Kim, Ik-Hui;Kim, Yeong-Jin
    • Journal of Korean Society of Transportation
    • /
    • v.25 no.5
    • /
    • pp.91-100
    • /
    • 2007
  • This study suggests direct connection service which has advantage of high-speed operation of KTX and access convenience of general train, and Pre-feasibility studies on the direct connection service. And analyze transportation demand change by the method as follows; It is to analyze the demand change of before and after KTX operation by previous transport data of Gyeongbu line, and calculate the coefficient of utilization using triggering demand by opening the 2nd phase of Gyeongbu line (Dongdaegu${\sim}$Busan). Through Pre-feasibility analysis, reduction $70{\sim}100$ minutes of train travel time and total revenue will increase about $100 thousand per day. Also, there will be environment-friendly effects of decreasing $CO_2$ emissions. But, Direct connection service need to highly cost ; Buying and Operation cost of KTX train. Therefore, we will be get more correct result of Pre-feasibility study on direct connection service, if there are concrete on buying the KTX action plans.

A new Direction for the Preliminary Feasibility Study of Public Healthcare Facilities (공공의료시설 예비타당성조사 방법론 개선 방향에 관한 연구)

  • KIM, MIN JAE
    • Journal of the Korean Regional Science Association
    • /
    • v.37 no.1
    • /
    • pp.3-14
    • /
    • 2021
  • Due to COVID-19, the importance of public medical facilities, especially hospitals specializing in infectious diseases, is rising. Despite the government's strong will, the establishment of public medical facilities and infectious disease hospitals has not been properly established. This is because the overall system related to the construction of public medical facilities does not sufficiently reflect social and economic changes and the trend of the times. The purpose of this study is to derive limitations and problems related to the guidelines for preliminary feasibility studies of public medical facilities and to present alternatives. This study proposes 'Option Value' as an alternative. Since the option value is a willingness to pay for an uncertain situation, it is theoretically reasonable and reasonable to reflect it as an additional benefit. Normally, the value of existence is not seen, but the system that is seen in a crisis is in the 'medical and health'. Therefore, it is necessary to find a system that is invisible even in the feasibility evaluation in the medical and health, and constantly improve and develop a methodology that can estimate changes in the welfare of citizens within the system. I expect this study to play a role as a catalyst.

Evaluation of Park Re-planning by Feasibility Study in Korea National Parks - Focusing on Area Adjustment of Hallyeohaesang National Park - (국립공원 타당성검토에 따른 공원재계획 평가 - 한려해상국립공원 구역조정을 중심으로 -)

  • Woo Cho
    • Korean Journal of Environment and Ecology
    • /
    • v.38 no.1
    • /
    • pp.79-89
    • /
    • 2024
  • The purpose of this study was to evaluate the area adjustment criteria and methods of the feasibility study of national park plans by applying them to Hallyeohaesang National Park. As a result of the ecological-based assessment used to identify the adjustment target areas, the ecological-based assessment Grades I and II that can be considered for inclusion were analyzed as 10.0% and 40.4%, respectively. Grade V, which can be considered for release, was 9.9%. As a result of the inclusion and release suitability assessment, the area subject to inclusion was 35.150 km2 (3.669 km2 on land and 31.481 km2 at sea), and the area subject to release was 0.071 km2 on land. When local governments and residents request the release of a park area for public interest or convenience, the release can be considered as long as the total area does not change, which is called a mutual exchange. The release area determined by mutual exchange was 10.386 km2. It was 146 times the area determined by the suitability assessment for release. Matching the areas released by the mutual exchange with the ecological-based assessment, 70.6% (7.321 km2) was in Grades I and II, which can never be released. As a result, it was determined that the area adjustment of the feasibility study of Hallyeohaesang National Park was based on a very limited application of the results of the ecological-based assessment or the release suitability assessment. Also, mutual exchange was the key to area adjustment of the feasibility studies of national parks.

Feasibility and safety of endoscopic submucosal dissection for lesions in proximity to a colonic diverticulum

  • Nobuaki Ikezawa;Takashi Toyonaga;Shinwa Tanaka;Tetsuya Yoshizaki;Toshitatsu Takao;Hirofumi Abe;Hiroya Sakaguchi;Kazunori Tsuda;Satoshi Urakami;Tatsuya Nakai;Taku Harada;Kou Miura;Takahisa Yamasaki;Stuart Kostalas;Yoshinori Morita;Yuzo Kodama
    • Clinical Endoscopy
    • /
    • v.55 no.3
    • /
    • pp.417-425
    • /
    • 2022
  • Background/Aims: Endoscopic submucosal dissection (ESD) for diverticulum-associated colorectal lesions is generally contraindicated because of the high risk of perforation. Several studies on patients with such lesions treated with ESD have been reported recently. However, the feasibility and safety of ESD for lesions in proximity to a colonic diverticulum (D-ESD) have not been fully clarified. The aim of this study was to evaluate the feasibility and safety of D-ESD. Methods: D-ESD was defined as ESD for lesions within approximately 3 mm of a diverticulum. Twenty-six consecutive patients who underwent D-ESD were included. Two strategic approaches were used depending on whether submucosal dissection of the diverticulum-related part was required (strategy B) or not (strategy A). Treatment outcomes and adverse events associated with each strategy were analyzed. Results: The en bloc resection rate was 96.2%. The R0 and curative resection rates were 76.4% and 70.6% in strategy A and 88.9% and 77.8% in strategy B, respectively. Two cases of intraoperative perforation and one case of delayed perforation occurred. The delayed perforation case required emergency surgery, but the other cases were managed conservatively. Conclusions: D-ESD may be a feasible treatment option. However, it should be performed in a high-volume center by expert hands because it requires highly skilled endoscopic techniques.

An Analysis of the Uncertainty Factors for the Life Cycle Cost of Light Railroad Transit (경량전철 교량 LCC분석을 위한 불확실성 인자 분석)

  • Won, Seo-Kyung;Lee, Du-Heon;Kim, Kyoon-Tai;Kim, Hyun-Bae;Jun, Jin-Taek;Han, Choong-Hee
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2007.11a
    • /
    • pp.396-400
    • /
    • 2007
  • Various ways of automated guideway transit construction are being planned recently owing to the policies of the national government and local municipalities as well as increasing investment from the private sector. Particularly, the increase in the private investment is increasing greatly in SOC (Social Overhead Cost). This trend of promoting private sector investment must be conducted on the basis of a thorough analysis of the economic feasibility of the project from the government and construction companies in the private sector. In other words, an accurate cost analysis of initial investment cost (Construction cost), maintenance/repair cost, profit making through the operation of the concerned facilities, cost of dissolution, etc. in terms of the life cycle is very much in need. Nevertheless, the analysis of uncertainty factors and its probabilistic theory are in need of development so that they can be used in the analysis of the economic feasibility of a construction project. First of all, the actual studies on maintenance/repair cost of automated guideway transit are scarce as of yet, prohibiting an accurate computation of the cost and its economic analysis. Accordingly, this study focused on the uncertainty analysis of the economic feasibility for civil engineering structures among automated guideway transit construction projects based on the rapidly increasing investment on such structures from the private sector. For this research purpose, a cost classification system for the automated guideway transit is proposed, first of all, and the data On the cost cycle of the civil structure facilities and their unit cost are collected and analyzed. Then, the uncertainty in the cost is analyzed from the perspective of LCC. In consideration of the current status with almost no. studies on maintenance/repair of such facilities, it is expected that the cost classification system and the uncertainty analysis technique proposed in this study will greatly enhance LCC analysis and economic feasibility studies for automated guideway transit projects in the future.

  • PDF