• Title/Summary/Keyword: Feasibility improvement

Search Result 689, Processing Time 0.027 seconds

ANALYSIS AND IMPROVEMENT OF FINISHING WORK PROCESS FOR COST MANAGEMENT (FOCUSED ON INDOOR FINISHING WORK OF APARTMENT)

  • Hoon-Ku Lee;Yoon-sun Lee;Ja-Young Yoon;Jae-Jun Kim
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.711-720
    • /
    • 2007
  • Apartment housing in the Korean domestic construction industry has had various and high-quality finishing work since the enforcement of price deregulation in 1998. Before the enforcement of price deregulation, feasibility studies of housing projects have not had particular difficulties as uniform description of finishing work items were reflected and finishing work cost also was equalized. However, the recent distinction of finishing work based on the same floor plan brings about project cost variation, along with many effects on construction management due to project cost increment. Accordingly, this paper suggests the improved plan of cost management to control the feasibility study result consistently during the life cycle of a project through an analysis based on cost management phase due to cost blackout, appearing at the commencement of a project, cost gradation caused by high-quality finishing work item, and cost reduction due to the degradation of finishing work after analysis of current apartment construction process focused on finishing work using the IDEF process analysis technique.

  • PDF

The effect of game-based dual-task training for executive function and repetitive behaviors in patients with autism

  • Yu, Jae-ho
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2022.05a
    • /
    • pp.394-395
    • /
    • 2022
  • Exergames are playing an important role in healthcare/rehabilitation. It has also been used to improve motivation among patients with reduced cognition. The purpose of this pilot study was to evaluate the feasibility of using augmented reality (AR) with game-based cognitive-motor training programs for executive function, restricted and repetitive behaviors (RRBs) in children with autism spectrum disorder. Sixteen children aged 6 -16 years were randomly allocated to the experimental group and control group. Outcome measures were performed before and after the intervention and included executive function, restricted and repetitive behavior. A satisfactory survey was conducted post-intervention. A statistically significant improvement was observed in working memory and cognitive flexibility in the experimental group (P<0.05). However, despite no statistical improvements in cognitive inhibition and four subscales of RRBs, promising changes were observed in all the subscales of the executive function and the behavioral outcomes. Parents appreciated the program and children enjoyed the interaction with the AR game-based training. The findings of this preliminary feasibility study showed that AR using Kinect v2 motion with a cognitive-motor game content can be used for children with autism. However, there is a need for conducting a large-scale study to evaluate his effectiveness on executive function and restricted and repetitive behaviors.

  • PDF

A Study on the Development of Mist-CVD Equipment Using the ADRIGE Algorithm of the Problem-Solving Method TRIZ (문제해결기법 TRIZ의 ADRIGE 알고리즘을 이용한 초음파분무화학기상증착 장비 개발에 관한 연구)

  • Joohwan Ha;Seokyoon Shin;Changwoo Byun
    • Journal of the Semiconductor & Display Technology
    • /
    • v.22 no.2
    • /
    • pp.133-137
    • /
    • 2023
  • This study the problem of deposition uniformity observed during Mist-CVD deposition experiments. The TRIZ's ADRIGE algorithm, a problem-solving technique, is utilized to systematically analyze the issue and propose solutions. Through problem and resource analysis, technical contradictions are identified regarding the precursor's volume and its path when it encounters the substrate. To resolve these contradictions, the concept of applying the principle of dimensional change to transform the precursor's three-dimensional path into a one-dimensional path is suggested. The chosen solution involves the design of an enhanced Mist-CVD system, which is evaluated for feasibility and analyzed using computational fluid dynamics. The analysis confirms that the deposition uniformity consistently follows a pattern and demonstrates an improvement in uniformity. The improved Mist-CVD equipment is validated through analysis, providing evidence of its feasibility and yielding satisfactory results.

  • PDF

A Feasibility Study on RUNWAY GEN-2 for Generating Realistic Style Images

  • Yifan Cui;Xinyi Shan;Jeanhun Chung
    • International Journal of Internet, Broadcasting and Communication
    • /
    • v.16 no.1
    • /
    • pp.99-105
    • /
    • 2024
  • Runway released an updated version, Gen-2, in March 2023, which introduced new features that are different from Gen-1: it can convert text and images into videos, or convert text and images together into video images based on text instructions. This update will be officially open to the public in June 2023, so more people can enjoy and use their creativity. With this new feature, users can easily transform text and images into impressive video creations. However, as with all new technologies, comes the instability of AI, which also affects the results generated by Runway. This article verifies the feasibility of using Runway to generate the desired video from several aspects through personal practice. In practice, I discovered Runway generation problems and propose improvement methods to find ways to improve the accuracy of Runway generation. And found that although the instability of AI is a factor that needs attention, through careful adjustment and testing, users can still make full use of this feature and create stunning video works. This update marks the beginning of a more innovative and diverse future for the digital creative field.

Evaluation of Deployment Barriers to Solar Thermal and Ground Source Heat Pump for Buildings (건물용 태양열과 지열의 보급 장벽 평가)

  • Ilhyun Cho;Jaeseok Lee
    • New & Renewable Energy
    • /
    • v.20 no.1
    • /
    • pp.61-69
    • /
    • 2024
  • This study investigates the barriers to the deployment of solar thermal and ground source heat pump (GSHP) from the perspective of consumers and businesses, as well as evaluates priorities for improving the barriers via expert AHP evaluation. From a consumer's perspective, the overall satisfaction with solar thermal is significantly lower than that with PV and needs to be improved at the installation and use stages. GSHP needs to be improved at the prior-information search stage. From a business perspective, the non-distinction between heat and electricity in mandatory installations in public buildings, the difficulty in assessing the value of heat, and high initial costs impede the deployment. Based on the result of AHP analysis, the priorities for improving the barriers to the wide utilization of solar thermal are evaluated in the order of economic feasibility, policy, acceptability, and technology, where high installation cost is shown to be the greatest barrier. Barriers for GSHP are evaluated in the order of policy, acceptability, economic feasibility, and technology, where policy means improvement is evaluated as the most important factor in promoting the deployment of GSHP.

A Study on The Improvement of Related Regulation System for The Utility Tunnel Activation (지하공동구 활성화를 위한 관련규정 체계 개선에 관한 연구)

  • Oh, Won-Joon;Cho, Choong-Yeun;Lee, Min-Jae
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.21 no.8
    • /
    • pp.563-571
    • /
    • 2020
  • The purpose of a utility tunnel is to prevent repeated excavation as well as disasters and calamity. Domestic utility tunnels have been built in new town development plans. Currently, it is difficult to establish a utility tunnel due to a conflict of opinions by organization and financing. In this paper, research was conducted based on systematic procedures to suggest ways of improving the activation of utility tunnels in new cities and existing cities. First, a survey was conducted on the laws and status of utility tunnels, and problems were derived based on the review and analysis of the status. Finally, a method suggesting improvement measures to solve problems was applied. Based on the related laws and problems, the status of the development project was analyzed to select the installation scale in the utility tunnel, and the appropriate scale was reviewed through economic feasibility analysis of the installation scale under 2 million square meters. Considering the new city and the existing city, it was proposed to support administrative expenses to reduce the burden on additional installation areas and occupied institutions in a utility tunnel. In addition, improvement plans were presented for the details of the master plan for reviewing the installation regional of the utility tunnel. This paper will help officials to work smoothly when planning and installing utility tunnels in the future.

The Development of an End-Effector in Automated Pavement Crack Sealer and Technical Feasibility Analysis (도로면 크랙실링 자동화 장비 말단장치의 요구성능 분석을 통한 설계·제작 및 기술적 타당성 분석)

  • Lee, Jeong-Ho;Lee, Won-Jae;Yoo, Hyun-Seok;Kim, Young-Suk
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.32 no.4D
    • /
    • pp.367-376
    • /
    • 2012
  • Crack sealing is a maintenance technique commonly used to prevent water and debris penetration and reduce future degradation in pavement. The conventional crack sealing operations are, however, dangerous, costly, and labor-intensive. Automating crack sealing will improve productivity and quality, and offer safety benefits by getting worker off the road. During the last two decades, several teleoperated and machine-vision assisted systems have been developed to automate the overall process of routing and sealing pavement cracks. However, the developed systems have not been commonly used in the construction sites because of the technical problems. Especially, the performance of end-effector, related to the productivity and quality improvement, is very important factor to improve the practical use of the developed systems. The main objective of this research is to develop an end-effector in automated pavement crack sealing machine and to analyze the technical feasibility of the developed end-effector.

A Subjectivity Study on the Improvement of Government Employees Pension System (공무원연금제도 개선방안에 대한 주관성 연구)

  • Shin, Moung Joo;Lee, Jei Young
    • The Journal of the Korea Contents Association
    • /
    • v.20 no.10
    • /
    • pp.522-534
    • /
    • 2020
  • The purpose of this study is to suggest practical ways to improve the 5th Government Employees Pension System(GEPS) in the near future. This article surveyed the civil servants cognition in three different levels(validity, feasibility, efficiency) by Q methodology. The value and mean of GEPS in the validity level, procedure and participants of GEPS reform process in the feasibility level, and contribution rates, benefit rate, replacement rate of GEPS in the efficiency level were analyzed. There is no successful policy without securing compliance and acceptance of implementation organization and target group. So next 5th GEPS reform could proceed successfully when it took into account civil servant's-who is the implementation group and target group- thought about variances of the 3 levels of GEPS.

A Study on Meta Analysis of Preliminary Feasibility for Government R&D Programs to Improve Planning Project of the Government Funded Research Institutes (정부출연연구기관 주요사업 연구기획 강화를 위한 예비타당성조사 사업 메타분석연구)

  • Lee, Jong-Won
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.18 no.11
    • /
    • pp.445-453
    • /
    • 2017
  • The Korean government's recent R&D policy has focused on encouraging government-funded research institutes (GRIs) to develop mid-term, long-term, and large-scale R&D projects. It is necessary to prepare thoroughly for the new R&D strategy, but there is no systematic accumulation of planning expertise, and there has been continued demand for good examples of research planning. Therefore, this study analyzes the reports of preliminary feasibility for government R&D programs through a meta-analysis of detailed evaluation items and contents to help researchers enhance their project-planning ability. The evaluation items that can be applied to R&D planning for GRI were reviewed, and twelve detailed evaluation items were selected through content analysis. The results of this study could contribute to practical R&D project planning and the improvement of evaluations.

A Feasibility Study of Acupuncture for Chronic Pain in Patients with Osteoporotic Thoracolumbar Compression Fracture: A Prospective Case Series

  • Bae, Ji min;Choi, Ji won;Kim, Dae hun;Yang, Gi Young;Kim, Kun hyung
    • Journal of Acupuncture Research
    • /
    • v.35 no.2
    • /
    • pp.75-80
    • /
    • 2018
  • Background: The aim of this study was to assess the feasibility of conducting a clinical study of using acupuncture for chronic pain in patients with osteoporotic thoracolumbar vertebral compression fractures (VCFs) in the outpatient setting. Methods: A prospective case-series attempting to recruit 20 participants was performed from February 11, 2016, to December 31, 2016. We provided Manual and electrical acupuncture was provided one 1 to three 3 times a week, for 6 weeks, up to 18 sessions. The primary clinical outcome was the average pain intensity as measured by the visual analog scale (VAS) at 6 weeks. Secondary outcomes included back-specific dysfunction (Oswestry disability index), quality of life (quality of life questionnaire-26), patient-reported improvement, use of other healthcare resources, and adverse events at 6 weeks. Use of healthcare resources and adverse events were additionally followed-up at 12 weeks by telephone. Results: Of 33 patients screened, a total of 7 were enrolled in the study. Manual and electrical acupuncture was provided 1 to 3 times a week, for 6 weeks, up to 18 sessions. We observed reduced pain intensity at 6 weeks in all participants. The change in the quality of life and back-specific dysfunction was inconsistent among participants. Mild, temporary adverse events were observed in three patients. Conclusion: In our clinical setting, it was not feasible to recruit sufficient participants and to assess the efficacy of acupuncture for chronic pain after osteoporotic thoracolumbar VCFs under a year. Strategies to improve recruitment and to identify barriers to participation are required for future clinical trials.