In this paper, we analyzed the optimal configuration of protection wire that have been installed in the electric railway power supply system. Protection wires are to suppress the ground potential rise when the short circuit fault between contact wire-rail(C-F), and protect the electronics equipments(signalling and communication) that are facility the wayside. The role of protection wires must be feed back quickly the fault current to the substation when a short circuit fault occurs. In this paper, we proposed that only one line to install the protection wire. Comparing how to newly proposed and existing system, most of the performance is similar. The reason is that most of the current flowing in the protection wire near the location where the fault occurred. There is no problem even if in one line for human safe and the low impedance of the return circuit in dimension to ensure the safety of the facility during the fault. To ensure safety during an fault occurs, it is sufficient even by one line. But, In the protection wire of facilities planning it is necessary to design taking into account the potential utility.
The safe operation of electro railways is greatly dependant on its protective systems. The system so-called Fault Protection Wire(FW) is now widely adapted to protect in AT feeding systems. It is connected between the feeder and trolley circuit to return the fault current to autotransfonmers at substation. This paper computed the distribution of fault currents at FW in the system and also evaluated the safety from electric shock when ground fault or flashover occur in the feeding system. The results show FW is useful to protect power supply network from fault in electric railways
In case the fault occurs in railway high voltage power supply network, protective relaying system must selectively detect 1 wire ground fault of grounding or non-grounding system. And this study presents railway high voltage power supply system model using PSCAD/EMTDC Vet 3.08 for circuit analysis and fault studies. In this paper, we propose protection method of non-grounding system of railway high voltage power supply system. The result shows its usefulness.
Protective equipments have a very important protection role in power accident on catenary line. These equipments are installed on electrical pole. The poles have complicated with many bands(moveable bracket, branch wire anchor, shield wire, etc). So we have improved bands and installed bands on pole to test technical condition. The Result has showed effectiveness due to fixed position change of fault protective wire and to improve band shape. For example, reduction of band made cost, simplification of installing, correct position of protective wire and shield wire.
The automotive industry and academic research have been continuously conducting research on standardization such as AUTOSAR (AUTomotive Open System ARchitecture) and ISO26262 to solve problems such as safety and efficiency caused by the complexity of electric/electronic architecture of automotive. AUTOSAR is an automotive standard software platform that has a layered structure independent of MCU (Micro Controller Unit) hardware, and improves product reliability through software modularity and reusability. And, ISO26262, an international standard for automotive functional safety and suggests a method to minimize errors in automotive ECU (Electronic Control Unit)s by defining the development process and results for the entire life cycle of automotive electrical/electronic systems. These design methods are variously applied in representative automotive safety-critical systems. However, since the functional and safety requirements are different according to the characteristics of the safety-critical system, it is essential to research the AUTOSAR functional safety design method specialized for each application domain. In this paper, a software functional safety mechanism design method using AUTOSAR is proposed, and a new failure management framework is proposed to ensure the high reliability of the product. The AUTOSAR functional safety mechanism consists of memory partitioning protection, timing monitoring protection, and end-to-end protection. The fault management framework is composed of several safety SWCs to maintain the minimum function and performance even if a fault occurs during the operation of a safety-critical system. Finally, the proposed method is applied to the Shift-by-Wire system design to prove the validity of the proposed method.
In multi-ground distribution system, overhead ground wire and neutral wire are parallel connected to offer the electrical power energy and protect damage of lightning strokes. Therefore a case where the two wires become single wire, the power company can get the benefit such as installation cost saving and line fault protection by simplify of distribution line. In this paper we describe the result of impulse test in both system ; one is the present power system the other is unified power system parallel connected overhead ground wire and neutral wire. As a result of this impulse test, the present power system get lower impulse voltage than the unified power system.
철도 고압배전선로의 경우 궤도를 따라 양방향으로 선로연변에 통신 및 신호설비와 병행하여 가공 또는 지중선로로 설치되어 있다. 가공선로의 경우에는 대기중에 노출되어 있어 뇌격, 폭풍우, 염해 등 자연현상으로 인한 고장발생이 다수 발생하고 있으며, 이에 따른 보호장치의 오 부동작이 빈번하게 발생하고 있다. 철도 고압배전선로에서 발생하는 사고 중 가장 많은 것은 1선 지락이지만 이밖에 선간 단락, 심할 경우에는 3선 지락(단락)으로까지 진전되는 사고가 있을 뿐만 아니라 단선 사고까지 발생하는 경우도 있다. 따라서 사고를 방지하기 위해서는 보다 상세한 점검보수가 필요하며, 고장발생시 조기발견과 신속한 고장처리는 철도안전수송에 중요하다. 본 논문에서는 철도 고압배전계통의 주류를 이루게 될 22.9[kV] 직접접지 계통을 대상으로 고장 발생시 고장 위치를 신속하게 표정할 수 있는 고장점 표정 알고리즘 개발을 위해 22.9[kV] 고압배전계통을 모델링 하여 특성해석과 고장해석을 수행하였고, 정확한 고장점 표정이 가능한 반복계산법을 이용한 알고리즘을 제시하였으며, 사례연구를 통해 성능을 입증하였다.
The main cause of electrical fires are caused due to short circuit and open circuit. This is generates an instantaneous electric arc or spark accompanied with such electric faults. These arcs generate a pressed wire, contact badness, and a weakness in the wire coating etc.. This research proposes a protection circuit to prevent open-phase accident due to contact failure of electromagnetic contactor, tracking arc fault, open-phase within the three-phase electrical control panel which is the most commonly applied in the industry. The proposed circuit also alarms and cuts off of power system when electrical faults occurs. In addition, the proposed circuit is validated by various electric accident simulator.
This article develops a long-term condition assessment method for stay cables in cable stayed bridges using the monitored cable tension forces under operational condition. Based on the concept of influence surface, the matched cable tension ratio of two cables located at the same side (either in the upstream side or downstream side) is theoretically proven to be related to the condition of stay cables and independent of the positions of vehicles on the bridge. A sensor grouping scheme is designed to ensure that reliable damage detection result can be obtained even when sensor fault occurs in the neighbor of the damaged cable. Cable forces measured from an in-service cable-stayed bridge in China are used to demonstrate the accuracy and effectiveness of the proposed method. Damage detection results show that the proposed approach is sensitive to the rupture of wire damage in a specific cable and is robust to environmental effects, measurement noise, sensor fault and different traffic patterns. Using the damage sensitive feature in the proposed approach, the metrics such as accuracy, precision, recall and F1 score, which are used to evaluate the performance of damage detection, are 97.97%, 95.08%, 100% and 97.48%, respectively. These results indicate that the proposed approach can reliably detect the damage in stay cables. In addition, the proposed approach is efficient and promising with applications to the field monitoring of cables in cable-stayed bridges.
This paper have analyzed sheath induced voltage in underground transmission cable system which will be operated with cable cover protection unit(CCPU). Simulation was carried out to analyze sheath induced voltage using on real cable system in the case with and without CCPU. Sheath induced voltage was also analyzed according to grounding method, fault resistance and fault angle. Simulation was performed using EMTP and ATP Draw, the simulation results represent whether the arrester is necessary or not in cable system.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.