• 제목/요약/키워드: Fault line

검색결과 1,138건 처리시간 0.027초

Operating Properties of Resistive Superconducting fault Current Limiters with Various Pattern Shapes

  • Park, Hyo-Sang
    • 한국전기전자재료학회논문지
    • /
    • 제16권12S호
    • /
    • pp.1286-1291
    • /
    • 2003
  • Quench behavior of resistive superconducting fault current limiters (SFCLS) with various pattern shapes was investigated. The pattern shapes employed were meander, bi-spiral, and spital shapes of identical line width, gap and margin. SFCLS were fabricated from YBCO thin films grown on two-inch diameter Al$_2$O$_3$ substrates under the same conditions. The total length of current limiting paths was the shortest at the spital shape due to its larger useless space. Inductance component of SFCLs with the spiral shape was around two times as high as those of other two shapes. This is not desirable since impedance characteristics of existing power systems can be changed. Resistance rise of current limiting elements was low at a spiral shape before the whole quench completion, which may act as a disadvantage for simultaneous quench in serial connection between current limiting elements, but the temperature tended to have similar values at higher voltages. On the other hand, hi-spital shape was severe at insulation level between current limiting lines. When these aspects were considered, we concluded that a meander shape was appropriate to design for a resistive SFCL based on thin films except the concentration of electric field at edge areas of strip lines.

운전 중인 송전선로의 철탑 전위강하시험과 해석 (Test and Analysis of Fall-Of-Potential at Towers of Energized Transmission Lines)

  • 강연욱;이동일;심응보;김경철;최종기
    • 대한전기학회논문지:전력기술부문A
    • /
    • 제55권5호
    • /
    • pp.195-201
    • /
    • 2006
  • Tower footing resistance and fault current division factor are important design factors for evaluation of the lightning performance of the transmission line and/or design of the grounding electrode system. The periodic measurement of those factors are also important to verify that the grounding performance of the towers has been maintained good. However, the direct measurement of those factors in operating or energized condition is very difficult because of many practical reasons, such as the difficulty of disconnecting overhead groundwires from the tower under test. With supports by GECOL (General Electricitiy Company of Libya), we had a special chance to conduct Fall-Of-Potential (FOP) test on the energized 220 kV transmission towers before and after disconnecting the overhead groundwires from the towers under test. In this paper, the FOP test results on the towers and the fault current division factors estimated from the comparision of the FOP tests with and without overhead groundwires were presented. The computer models for the FOP test simulations were also constructed to find that the simulated results agreed very well with the measured ones.

순시적인 전압 sag 보상기에 대한 제어 알고리즘의 해석 (Analysis of Control Algorithm for Instantaneous Voltage Sag Corrector)

  • 이상훈;김재식;최재호
    • 전력전자학회논문지
    • /
    • 제6권2호
    • /
    • pp.173-179
    • /
    • 2001
  • 본 논문은 배전계통의 전력품질 개선을 위한 순시 전압강하 보상기의 제어 알고리즘에 대한 연구를 수행하였다. 특별히 순시적인 전압강하의 원인중 가장 대표적인 1선 지락사고 시에 발생하는 불평형과 비대칭 문제를 해석하기 위하여 새로운 대칭성분 검출 기법을 제안하였다. 제안되 방법은 간단한 연산만을 사용하며, 전압보상을 위한 대칭성분의 제어 기준값이 별도의 위상검출 과정을 거치지 않고도 직류 값으로 표현되도록 하였다. 그리고 기준전압의 발생 시에 IEC에서 규정하고 있는 UF와 MF를 사용하도록 하였다. 제안된 제어기법을 사용하면 보상장치는 매우 빠른 응답특성을 가지고 보상된 전압 파형의 총고조파왜형률(THD)도 매우 낮게 된다. 마지막으로 EMTDC 시뮬레이션과 실험을 통하여 제안된 방법의 타당성을 입증하였다.

  • PDF

비접지 선박 3상 배전선로의 대지전압 벡터 모니터링 장치의 구성 (Configuration of a Module for Monitoring Voltages Between Power Lines and Hull Onboard Vessels Based on the Vector Diagram at 3 Phase Ungrounded Power Distribution System)

  • 최순만
    • Journal of Advanced Marine Engineering and Technology
    • /
    • 제35권8호
    • /
    • pp.1111-1116
    • /
    • 2011
  • 비접지방식 선박에서의 접지 고장은 대지 임피던스의 불평형을 가져오고 대지전압을 상승시켜 감전이나 전기화재의 염려가 높아진다. 접지에 따른 이 같은 대지전압의 왜곡 상태는 전기안전의 측면에서 실시간으로 감시할 필요가 있으며 이 경우 대지전압의 측정치를 위상변화 감시가 가능한 벡터다이어그램으로 나타내는 것이 효과적이다. 대지전압의 상태는 중성점 위치에 의해 표시될 수 있다는 점에서 우선 측정된 대지전압 입력에 대해 벡터 평면의 중성점을 출력하는 연산과정과 알고리즘의 해석이 필요하다. 이를 토대로 본 연구에서는 매 샘플링 주기마다 대지전압을 입력하여 컴퓨터 모니터 상에 중성점과 벡터 대지전압을 출력하는 모듈을 구성한 후 실제 배전선로에서의 실험을 통해 제시한 장치의 적정성을 확인하였다.

2차 권선과 초전도 사이의 중성선 유무에 따른 변압기형 초전도 한류기의 동작특성 (Operational Characteristics of Transformer-Type SFCL with or without Neutral Line between the Secondary windings and Superconducting units)

  • 조용선;최효상;고성필
    • 전기학회논문지
    • /
    • 제60권6호
    • /
    • pp.1268-1273
    • /
    • 2011
  • The study on power capacity increase of superconducting fault current limiter (SFCL) is one of the most important researches to apply a SFCL in the power system. To achieve this, we thought that the unbalanced quenching problem generated in series connection of superconducting units should be solved. In this paper, we investigated the quenching characteristics of superconducting units in the transformer-type SFCL with or without the neutral line between secondary windings and superconducting units. In case of transformer-type SFCL without neutral line, the connection structure of superconducting units is identical to that of the resistive-type SFCL connected in series. Therefore, the unbalanced quenching was occurred by difference of critical current between superconducting units. However, in case of transformer-type SFCL with neutral line, the superconducting units with different critical current were simultaneously quenched. It was because the currents induced by secondary winding were separately flowed through the superconducting units. By these results, we confirmed that the resistances and consumption powers of the superconducting units were equally generated.

Topological Locating of Power Quality Event Source

  • Won Dong-Jun;Moon Seung-Il
    • Journal of Electrical Engineering and Technology
    • /
    • 제1권2호
    • /
    • pp.170-176
    • /
    • 2006
  • This paper proposes a topological locating algorithm to determine the location of the power quality event source. This algorithm makes use of the information on the topology of the monitored network and on the direction of PQ events. As a result, the bus incidence matrix is modified using monitor location and the direction matrix is constructed. With this information, the algorithm determines the suspected locations of the PQ events. To reduce suspicious areas, it utilizes event cause and related equipment. In case of line fault event, it calculates the distance from the monitor to the location of event source. The overall algorithm is applied to the IEEE test feeder and accurately identifies the event source location.

PSCAD/EMTDC를 이용한 교류 전철급전시스템 해석 (Analysis of AC Electric Railway System using the PSCAD/EMTDC)

  • 이한민;한문섭;창상훈;오광해;이장무;김주락
    • 대한전기학회:학술대회논문집
    • /
    • 대한전기학회 2002년도 하계학술대회 논문집 B
    • /
    • pp.1241-1243
    • /
    • 2002
  • This study presents a AC electric railway system analysis using PSCAD/EMTDC for circuit analysis and fault studies. This PSCAD/EMTDC model includes feeder, contact line, rails. Scott-transformer. Auto-transformer and so on. This model is based on four-port network which is an extension of two-port network theory. In order to verify the proposed model, fault studies of a test system are performed.

  • PDF

Power Control and Ground Fault Simulations for a Distribution System with a Fuel Cell Power Plant

  • Hwang, Jin-Kwon;Choi, Tae-Il
    • 조명전기설비학회논문지
    • /
    • 제24권7호
    • /
    • pp.9-19
    • /
    • 2010
  • Fuel cell (FC) distributed generation (DG) is gradually becoming more attractive to mainstream electricity users as capacity improves and costs decrease. New technologies including inverters are becoming available to provide a uniform standard interconnection of DGs with an electric power system. Some of the operating conflicts and the effect of DG on power quality are addressed and investigated through simulations on a real distribution network with an FC power plant. The results of these simulations have proved load tracking capability following the real and reactive power change of the load and have shown the flow of overcurrent from an FC power plant during the ground fault of a distribution line.

Controller Optimization Algorithm for a 12-pulse Voltage Source Converter based HVDC System

  • Agarwal, Ruchi;Singh, Sanjeev
    • Journal of Electrical Engineering and Technology
    • /
    • 제12권2호
    • /
    • pp.643-653
    • /
    • 2017
  • The paper presents controller optimization algorithm for a 12-pulse voltage source converter (VSC) based high voltage direct current (HVDC) system. To get an optimum algorithm, three methods namely conventional-Zeigler-Nichols, linear-golden section search (GSS) and stochastic-particle swarm optimization (PSO) are applied to control of 12 pulse VSC based HVDC system and simulation results are presented to show the best among the three. The performance results are obtained under various dynamic conditions such as load perturbation, non-linear load condition, and voltage sag, tapped load fault at points-of-common coupling (PCC) and single-line-to ground (SLG) fault at input AC mains. The conventional GSS and PSO algorithm are modified to enhance their performances under dynamic conditions. The results of this study show that modified particle swarm optimization provides the best results in terms of quick response to the dynamic conditions as compared to other optimization methods.

Offset이 제거된 반주기 테이터를 사용하는 고속Haar 변환에 기초한 디지털 거리계전 알고리 (A New Digital Distance Relaying Algorithm Based on Fast Haar Transformation Techniques with Half a Cycle Offset Free Data)

  • 강상희;박종근
    • 대한전기학회논문지
    • /
    • 제41권9호
    • /
    • pp.973-983
    • /
    • 1992
  • A very fast algorithm, using fast Haar transformation with half a cycle dc-offset free data, to extract the power frequency components and to detect faults in power systems is proposed. For the speed-up, two important techniques are used. First, according to the symmetric characteristics of sine and cosine functions, fundamental frequency components are calculated with only half a cycle sample data. For using these characteristics, post-fault de-offset components must be removed beforehand. Therefore, secondly, a newly designed digital filter is used to remove exponentially decaying dc-offset from the post-fault signal. In accordance with series simulations, transmission line faults can be detected in around half a cycle after faults.