Journal of Fisheries and Marine Sciences Education
/
v.28
no.5
/
pp.1358-1364
/
2016
Maritime accidents caused by a ship include collisions, sinking, stranding and fire etc. This study is intending to consider fire accidents among such diverse marine accidents. It is much likely that various sorts of fires break out because crewmen are living in a narrow space for long periods of time consequent on the ship's characteristic of sailing on the sea. According to the ship fire survey, about 50% of the total fire accidents occurred at an engine room, and the main fire origin was analyzed to be oil. In addition, ship fire breaks out in the order of baggage racks and living quarter. In short, the survey indicates that all sorts of fires belonging to A, B, C and D-class have occurred. This study, targeting an actual passenger ship 'A', found the response time to evacuation, during which the people on board a ship recognize the outbreak of fire, and act, and the travel time for evacuation which is the actual travel time. In addition, this study carried out a simulation through the special program for fire analysis - FDS (Fire Dynamics Simulator) in order to find the effective evacuation time, i.e. life survival time. Particularly, this study did comparative analysis of the influence on the survival of passengers and crew based on the collected simulation data by fire size and sort. As a result of the analysis, it was found that when examining the only actual evacuation movement time excepting the response time to evacuation, people are safe by completing evacuation before the effective evacuation time only in case fire size is 100Kw among all sorts of fires. In other words, in case of the outbreak of fire more than 1 MW, it was found to fail to meet evacuation safety regardless of fire size.
Objective: The aim of this study is to reclassify human errors and to develop hands-on tools to apply the new classification for preventing human error accidents in highway construction site. Background: The main cause of accidents in highway construction was reported as the carelessness of workers. However, such diagnosis could not help us operationally prevent accidents in real workplace. Method: The accidents in highway construction were reanalyzed and the causes of human error were reclassified in order to educate and improve the awareness of human error in highway construction. Field survey and interview with safety managers and workers were conducted to find the causal relationship between the actual accidents and the human errors. Results: The most frequently observed human errors in highway construction were classified into six categories such as mis-perception, distraction, memory fail, slip, cognition error and mis-judgment. In order to provide hands-on tools to increase the awareness of human error in construction field, the human error checklist and card sorting diary were developed. Especially, the card sorting diary was designed to increase the ability in human error inspection of safety manager at construction site. Moreover, posters were developed based on actual accident cases. Conclusion: We suggested that the improved awareness and analytical report on checklist, card sorting diary and posters for construction field could collectively prevent the accident. Application: The classification of human error, hands-on tools and posters can be directly applicable on highway construction site. This analytical and collective approach preventing human error-related accident could be extended to other construction workplaces.
Journal of the Korean Society for Aeronautical & Space Sciences
/
v.37
no.2
/
pp.181-186
/
2009
The objective of this study is ensuring safety of cabin when the blade impacts into a obstacle by verifying safety of the rotor mast and the transmission using impact loads calculated from the simulation. The rotor mast shall not fail and the transmission shall not be displaced into occupiable space when the main rotor composite blade impact into a 8 inch rigid cylinder in diameter on the outer 10% of the blade at operational rotor speed. To calculate the reaction loads at the spherical bearing and lead-lag damper, blade impact analysis was performed with FE model consist of composite blade, tree(or rigid cylinder) using elastic-plastic with damage material and several contact surfaces which were created to describe a progress of actual failure. Also, the reaction loads were investigated in change of blade rotation speed and pitch angle.
This study is to suggest some developmental policies by analyzing the activities of first aid party in Kwangju and Chonnam regions for two years from Jan. 1, 1991 to the end of December, 1995. First, the residents in Kwangju and Chonnam regions have the sufficient benefits of emergency medical center, but it will be desirable that general hospital should be established and managed in Kohung peninsula which forms the wide island area far away from big cities. Second, the classification of the degree of severe case in the field by rescue members should be strengthened as the means which can reduce the number of patients transferred to the emergency room and the legal method which rescue members can select the medical agency. Third, children less than 10 are most frequent emergent patients and it is due to parent's indifference and children's in sensibility to safety. So the safely education in the course of infant and elementary education should be strengthened and the method which can keep the self safety through the legal system. Fourth, to increase the rate of emergency measure by rescue members, the reasons of fail of emergency treatment are suggested, the treatment results of each rescue member are analyzed every year and it is desirable that the system which can evaluate the personal ability should be introduced. Fifth, the medical accidents occurred in the case of medical act, by rescue members must lake the legal responsibility, but such a problem can he solved with the compensation of insurance system by government. Sixth, to reduce the time required for transfer, traveling service system for the fixed period in beach should be complemented and extended more and service system at ordinary times should be examined at mountains, the area of traffic jams and large special industrial park. Seventh, since service system with one team of two members of 119 rescue party in expressway cannot be mobilized when multiple accidents occur at the same time, it is considered that service system of two teams of four members should be extended. Eighth, first-aid service in expressway is conducted with rescue and emergency treatment by the rescue party at the same time, but the professional rescue lacks and it may result in the injury of patients. Therefore the creation of rescue party in expressway is the urgent problem.
For the past decade, South Korea had experienced catastrophic building fires, which resulted in consider-ably high number of casualties. This motivated research to develop fire-safe wall assemblies. In this study Fire Risk Analysis (FRA) is conducted as part of the project designing phase to ensure fire safety of the final product. Traditional approach was to consider fire performance at the end of the designing stage, when PASS/FAIL fire test results are required to be submitted to the Authority Having Jurisdiction (AHJ). By applying a fire risk analysis to guide the designing phase, overall fire safety of a wall assembly can be achieved more systematically as conducting FRA allows designers to clearly identify elements that are more vulnerable to fire and simply replace them with other practical options. Severity of fire risk is determined by considering the fire hazards of a wall assembly such as the exterior layer, insulation, vertical connectivity, and external ignition sources (e.g., photovoltaic panels). Frequency of fire risk is assessed based on the factors affecting fire likelihood, which are air cavity and fire-stopping applied in the design, and random design changes occurring during on-site construction. Fire risk matrix is proposed based on these fire risk factors and efforts to reduce the fire risk level associated with the wall assembly are given by systematically assessing the fire risk factors identified from fire risk analysis. Current study demonstrates how fire risk analysis can be applied to develop fire-safe walls by reducing the relevant fire risks- both severity and frequency.
When the vertical load-bearing members in high-rise structures fail locally, the beam-column joints play an important role in the redistribution of the internal forces. In this paper, a static laboratory test of three full-scale flush flange beam-reinforced connections with side and cover plates (CP-FBSP connection) with double half-span steel beams and single L-shaped columns composed of concrete-filled steel tubes (L-CFST columns) was conducted. The influence of the side plate width and cover plate thickness on the progressive collapse resistance of the substructure was thoroughly analyzed. The failure mode, vertical force-displacement curves, strain variation, reaction force of the pin support and development of internal force in the section with the assumed plastic hinge were discussed. Then, through the verified finite element model, the corresponding analyses of the thickness and length of the side plates, the connecting length between the steel beam flange and cover plate, and the vertical-force eccentricity were carried out. The results show that the failure of all the specimens occurred through the cracking of the beam flange or the cover plate, and the beam chord rotations measured by the test were all greater than 0.085 rad. Increasing the length, thickness and width of the side plates slightly reduced the progressive collapse resistance of the substructures. The vertical-force eccentricity along the beam length reduced the progressive collapse resistance of the substructure. An increase in the connecting length between the beam flange and cover plate can significantly improve the progressive collapse resistance of substructures.
This study analyzes the operational characteristics of 311 aged and non-aged residual current circuit breakers (RCCBs) in low-voltage consumer contexts. It investigates the influence of external temperature and harmonics based on the rated current multiples. To simulate temperature variations, a convectional oven was used around the circuit breakers. Additionally, the generation of harmonic reference signals and data measurement for overcurrent experiments were conducted using NI SCXI, myDAQ, and LabVIEW. An observation revealed that as the ambient temperature increased, the operating time of RCCBs decreased in the time delay region. This was attributed to the faster response or bending of the bimetal, which is the tripping element. However, aged RCCBs encountered challenges with tripping outside the protective curve. The operating time of the circuit breakers exhibited an acceleration influenced by the order and content of harmonic currents, potentially leading to malfunctions. Aged RCCBs demonstrated faster operating times than their non-aged counterparts. However, the difference in operating time varied based on the manufacturer's and operating environment of the RCCBs. Frequent malfunctions of RCCBs can result in power outages. In cases where these circuit breakers fail to operate, they can lead to secondary damages, including electrical fires and shocks. Consequently, it is imperative to consider the operating environment of RCCBs and provide appropriate replacement cycles to mitigate these risks.
Journal of the Earthquake Engineering Society of Korea
/
v.28
no.2
/
pp.77-83
/
2024
The design shear strength equations of RC shear walls have been developed based on their performance under in-plane (IP) loads, thereby failing to account for the potential performance degradation of shear strength when subjected to simultaneous out-of-plane (OOP) loading. Most of the previous experimental studies on RC walls have been conducted in one direction under quasi-static conditions, and due to the difficulty in experimental planning, there is a lack of research on cyclic loading and results under multi-axial loading conditions. During an earthquake, shear walls may yield earlier than their design strength or fail unexpectedly when subjected to multi-directional forces, deviating from their intended failure mode. In this paper, nonlinear analysis in finite element models was performed based on the results of cyclic loading experiments on reinforced concrete shear walls of auxiliary buildings. To investigate the reduction trend in IP shear capacity concerning the OOP load ratio, parametric analysis was conducted using the shear wall FEM. The analysis results showed that as the magnitude of the OOP load increased, the IP strength decreased, with a more significant effect observed as the size of the opening increased. Thus, the necessity to incorporate this strength reduction as a factor for the OOP load effect in the wall design strength equation should be discussed by performing various parametric studies.
The Dynamic Positioning System consists of 7 elements which are namely Power system, Human machine interface, DP Computer, Position Reference System(PRS), Sensors, Thruster system and DP Operator. Incidents like loss of position(LOP) on DP vessel usually occur due to errors in these 7 elements. The purpose of this study is to find out safety operation method of DP vessel through qualitative and quantitative analyze of DP LOP incidents which are submitted to IMCA every year. The 612 DP LOP incidents submitted from 2001 to 2010 were analyzed to find out the main cause of the incidents and its rate among other causes. Consequently, the highest rate of incidents involving DP elements are PRS errors. DP computer, Power system, Human error and thruster system came next. The PRS has been analyzed and a flowchart was drawn through expert brainstorming. Also, the conditional probability has been analyzed through Bayesian Networks based on this flowchart. Consequentially, the main causes of drive off incidents were DGPS, microwave radar and HPR. Also, this study identified the main causes of DGPS errors through Bayesian Networks. These causes are signal blocked, electric components failure, relative mode error, signal weak or fail.
Particulate filtering facepiece respirators (PFFR) is one of the most widely used items of personal protective equipments, and a tight fit of the respirators on the wearers is critical for the protection effectiveness. In order to effectively protect the workers through the respirators, it is important to find and evaluate the ways that can be readily applicable at the workplace to improve the fit of the respirators. This study was designed to evaluate effects of mask style (cup or foldable type) and donning training on fit factors (FF) of the respirators, since these are available at various workplace, especially at small business workplace. A total of 40 study subjects, comprised of 30~50s aged male and female workers in metalworking industries, were enrolled in this study. The FF were quantitatively measured before and after training related to the proper donning and use of cup or foldable-type respirators. The pass/fail criterion of FF was set at 100. After the donning training for the cup-type mask, subjects who passed the fit test were increased from 10 to 33. Moreover, the geometric mean (GM) of FF was increased by 340% in subjects who failed the test. In addition, the training effects for the cup-type mask were significant in female and 50s aged subjects. On the other hand, although the GM of FF for the foldable-type mask was also increased after the donning training, the GM of FF for the foldable-type mask and it's increase rate were smaller as compared to the cup-type mask. Furthermore, the differences of the increase rates of the GM of FF in sex and aged of the subjects were not significantly for the foldable-type mask. The multi-distribution of leak points for the foldable-type mask may be one of causes for the less effect of training on the fit of the foldable-type mask. These results imply that the raining on the donning and use of PFFR can enhance the protection effectiveness of cup or foldable-type mask, and that the training effects for the foldable-type mask is less significant than that for the cup-type mask. Therefore, It is recommended that the donning training and fit tests should be conducted before the use of the PFFR, and that efficient tranining programs for the foldable-type mask are required.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.