• Title/Summary/Keyword: Factors in Assessment

Search Result 4,345, Processing Time 0.033 seconds

The Risk Assessment Effects of SCM and the Strategy of Risk Management on Supply Chain Performance (공급사슬 위험평가 및 위험관리전략이 공급사슬 운영성과에 미치는 영향)

  • Kim, Dong Jeong;Lee, Young Jai
    • Journal of Information Technology Applications and Management
    • /
    • v.21 no.4
    • /
    • pp.173-186
    • /
    • 2014
  • This study outlines possible risk factors in the SCM of a company and correlates risk assessment, the strategy of risk management, and the supply chain performance. The data is surveyed from an international Korean company and is analyzed by the structure equation model of actual proof. The research model verifies the correlation between the risk assessment, the strategy of risk management, and the supply chain performance as dependent variables after the risk factors of the SCM are defined as independent variables. The research shows that there are consecutive links among the risk factors of the SCM, the risk assessment, and the strategy of risk management. The strategy of risk management was conclusively determined to have an effect on supply chain performance. Therefore, improving the supply chain performance of a company requires the constructive process for risk management based on a correlation between risk assessment and the strategy of risk management.

Market Expansion Strategies for Small or Medium-sized Construction Companies by Developing Quantitative Risk Assessment Model

  • Yoo, Jinhyuk;Koh, Seungyoon;Seo, Induck;Cha, Heesung
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.742-743
    • /
    • 2015
  • Korean construction industry has developed with national economy growth for a couple of decades. However, because of slump of real estate, the domestic construction industry was intimidated. In this situation, many construction company has no choice but to go abroad to find construction projects. However, almost small or medium-sized construction companies are very hard to operate their business because they have small funding ability and weak labor power. Therefore, this study aims to propose an assessment tool through analyzing risk factors of overseas construction projects for small or medium-sized companies by examining preceding research and interviewing industry experts. Weights of the risk factors are determined through the surveys of the industry practitioners. All of the data is configured into the assessment tool and this converts the quantitative information which leads to the optimal of strategies choice. This paper provides a quantitative measurement of possible performance and detailed assessment of each itemized risk factors. This assessment tool is qualified for industry experts so that it can safely be applied to the future projects. Ultimately, many small or medium sized construction companies will benefit from the tool proposed in this study to examine the potential of the overseas market expansion.

  • PDF

A Comparison of Excess Rates of Risk Factors among Ergonomic Assessment Tools for Automobile and Part Manufacturing Industry Workers (자동차 업종의 근골격계질환 발생 위험요인에 대한 인간공학적 평가도구간 초과율 비교)

  • Chung, Eun Kyo;Kim, Jung Man
    • Journal of Korean Society of Occupational and Environmental Hygiene
    • /
    • v.19 no.2
    • /
    • pp.88-95
    • /
    • 2009
  • There are many assessment techniques used for occupational risk factors of MSDs in the workplaces. However, because all ergonomic assesment techniques or tools are based on theoretical background derived from workphysiology, biomechanics, psychophysics, industrial hygiene, work system, and etc, it is impossible to compare the assessment techniques. This study was conducted to compare the excess rates of risk factors among ergonomic assessment techniques and to make alternative methods. Site-visits to 6 automobile products and parts company provided data for process repeated work where the produced data was examined for evaluating the relationship between workplace lay-out and work posture by using ergonomic assessment techniques. We evaluated 157 jobs for simple repeated work and 37 jobs for manual materials handling (MMH). In simple repeated work, the exceeded rates of AC were 36.3% in OWAS method and 93.0% in RULA method. The exceeded rate for RULA method was significantly higher than those for OWAS method (p<0.05). In MMH, the exceeded rates of AC were 80.0% in NLE method and 76.5% in WAC method. Statistically significant differences were not identified in the exceeded rates for NLE and MAC methods (p<0.05). The analyzed results among ergonomic assessment techniques (OWAS, RULA, NLE/WAC) were applied to the same work places performing simple repeated work and manual materials handling simultaneously. The applied results showed statistically significant differences (p<0.05) among ergonomic assessment techniques (OWAS, RULA, NLE/WAC). Exceeded rates of four ergonomic assessment techniques in decreasing order was "RULA>NLE>WAC>OWAS". The RULA method was the strongest assessment technique for automobile products and parts company. We discovered that the results could easily be overestimated or underestimated when the ergonomic assessment techniques were not applied correctly during the evaluation process. Therefore, we recommend using at least 2 methods when evaluating and analysing the results.

Construction Work by Type Risk Factors increased levels proposed model for the PCRA(Pre Construction Risk Assessment) - Focusing on building construction - (건설공사 공종별 위험성평가 위험요인 도출 수준 향상을 위한 PCRA 모델 제안 -건축공사 중심으로-)

  • Bok, Hoon;Kim, Hyeong-Tae;Kang, Kyung-Sik
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.3
    • /
    • pp.9-22
    • /
    • 2014
  • Constructions sites are affected by Diversity workplace, complexity of construction, Change of place, Mobility of workers and so on. In a single establishment, Prime contractors and subcontractors have to conduct their work at the same time. There are a lot of unpredictable risks when the construction is running, coordination between contractors is very important to do a risk assessment under the condition. Large Construction companies were investigated by previous studies. Survey research is applied to the risk assessment. In the writing, Risk assessment of the entire lower level. Because of the low level of risk factors to find. Also, There was a limit to investigate accidents. Confirmed that Effort to derive a risk factors were desperately of the risk assessment. Results were obtained through previous studies. The PCM is several experts should be joined. Experts Site Manager, Supervisor, Safety Manager, Director Contractor, Work team leader is required to participate. Construction plans, Process Planning to the risk find beforehand. And Determines how the operations and the control. Also, Made it into the database. and PCRA can be used in the risk assessment was developed.

A DEVELOPMENT OF MODEL FOR FIRE HAZARD ASSESSMENTS H THE BUILDINGS

  • Lee, Su-Kyung;Kim, Su-Tae;Ha, Dong-Myung
    • Proceedings of the Korea Institute of Fire Science and Engineering Conference
    • /
    • 1997.11a
    • /
    • pp.384-391
    • /
    • 1997
  • The hazard assessment in which the potential hazard factors In the buildings are investigated and the scale of the hazard is analyzed should be performed first in order to prevent personal and material damages due to building fire. In this study, the building fire hazard are assessed using 822-item checklist, for the qualitative evaluation of which the main factors are classified into 10 items, yielding 100 scale points with some weighting. It is shown that present model is applicable for the assessment of all general buildings through the examination of the suitability of assessment model by actual assessment of existing building. Also, the checklist is prepared in itemized questionnaire form for easy assessment of building fire hazard. Therefore, the present model will be helpful for those working in fire prevention, who are suffering from the lack of manifest evaluation model for the fire prevention assessment so far in Korea.

  • PDF

A Study on the Determining Factors For Assessment Criteria of Project Performance Capability of CM(Constuction Management) Considering Safety (안전을 고려한 건설사업관리 용역업자(CM) 사업수행능력 평가기준 요인 도출 연구)

  • Kim, Do-Su;Shin, Yoon-Seok
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2019.11a
    • /
    • pp.52-53
    • /
    • 2019
  • The construction industry has the most safety accidents among domestic industries. Special care must be taken because disasters in the construction industry lead to social problems caused by huge property losses and casualties. As a result of this, there is a growing awareness of disasters occurring in the construction industry, and government departments are tightening regulations on safety management. In particular, the OSHA(Occupational Safety and Health Agency) focuses on the expansion of protection targets and the clarification of responsibility in the full amendment OSHA. As a result, a study that focuses on safety management by client's responsibility is needed. In this study, the project performance capability assessment of construction project management contractors, which is being carried out with uniform assessment criteria without considering the characteristics of the construction project, is considered and all the amendments to the OSHA are considered, and the factors were derived for improvement measures.

  • PDF

A Note on Factors of Mathematical Creativity Assessment through Problem Posing (문제설정에서의 수학적 창의성 평가 요소에 대한 소고)

  • Kim, PanSoo
    • Journal of Gifted/Talented Education
    • /
    • v.24 no.6
    • /
    • pp.1053-1071
    • /
    • 2014
  • Problem posing is used to develop the creativity program and adaption for the gifted, and to screen the gifted students in the selection process. However existing creativity assessment factors(fluence, flexibility, originality) has been recognized to have it's limitation to assess the mathematical creativity. To improve the creativity assessment, we propose new set of assessment factors for mathematical creativity test through problem posing. For this study, we let 19 mathematically gifted students to pose two good mathematical problems for a limited time after solving a certain problem so called a reference problem. A week late, we let the subjects, pre-service teachers, and experts to evaluate the problems posed by the subjects, and leave the reasons for evaluating highest mark and lowest mark. With this date, we propose fluence, flexibility, originality, anti-similarity, complexity, elaboration as the set of mathematics creativity assessment factors.

A Study on the Category of Factors for the Landslide Risk Assessment: Focused on Feature Classification of the Digital Map(Ver 2.0) (산사태 위험도 항목 분류에 관한 연구 -수치지도(Ver 2.0) 지형지물 분류체계를 중심으로-)

  • Kim, Jung-Ok;Lee, Jeong-Ho;Kim, Yong-Il
    • Proceedings of the Korean Society of Surveying, Geodesy, Photogrammetry, and Cartography Conference
    • /
    • 2007.04a
    • /
    • pp.371-374
    • /
    • 2007
  • For development of landslide risk assessment techniques using GIS(Geographic Information System), this study classifies the category of socioeconomic factors. The landslide quantitative risk assessment performs first prediction of flow trajectory and runout distance of debris flow over natural terrain. Based on those results, it can be analyzed the factors of socioeconomic which are directly related to the magnitude of risk due to landslide hazards. Those risk assessment results can deliver factual damage situation prediction to policy making for the landslide damage mitigation. Therefore, this study is based on feature classification of the digital map ver. 2.0 provided by the National Geographic Information Institute. The category of factors can be used as useful data in preventing landslide.

  • PDF

Development of Korean Exposure Factors for Children in Korea (국내 어린이 위해성평가를 위한 노출계수 연구)

  • Yoon, Hyojung;Seo, Jungkwan;Kim, Taksoo;Kim, Joohyun;Jo, Areum;Lee, Byeongwoo;Lim, Hyunwoo;Lee, Daeyeop;Kim, Pilje;Choi, Kyunghee;Yang, Wonho
    • Journal of Environmental Health Sciences
    • /
    • v.43 no.3
    • /
    • pp.167-175
    • /
    • 2017
  • Objectives: Children may be more exposed to certain environmental contaminants because they react with greater sensitivity and have different food intakes and breathing rate per unit of body weight compared to adults. The aim of this study was to determine general exposure factors such as skin surface area, period and frequency of exposure, and others among Korean children aged ${\leq}18$ years old. This study was carried out as the first of its kind in Korea. Methods: We developed 23 recommended exposure factors for Korean children aged 0 to 18 years by reclassifying raw data from the National Health and Nutrition Examination Survey and the National Statistical Information Service, as well as through investigation by experiments in the absence of related data. Results: Reflecting the activity patterns of about 9,000 children, the daily inhalation rates for long-term exposure ranged from $9.49m^3/day$ for children from birth to <2 years to $14.98m^3/day$ for children aged 16 to <18 years. The research found that Korean children spent an average of 22.21 hours indoors, 0.67 hours outdoors, and 1.12 hours in-transit every day. Young children (${\leq}2$ years old) spent approximately 34 more minutes outdoors on weekends than they did on weekdays. Conclusion: Various physiological variables in the human body reflect characteristics of children that can directly influence risk exposure. Therefore, the identification of general exposure factors based on Korean children is required for appropriate risk assessment.

The Integrated Assessment Model for the Conservation of Natural Environment - Focused on Site Selection for the National Trust - (자연환경 보전을 위한 통합 평가모형 - 내셔널 트러스트 후보지 선정을 중심으로 -)

  • Jung, Sung-Gwan;You, Ju-Han
    • Journal of Environmental Impact Assessment
    • /
    • v.12 no.2
    • /
    • pp.87-98
    • /
    • 2003
  • The main purpose of this study is to propose the integrated assessment model for the rational and effective selection of proposed sites in National Trust (NT) and conserve the ruined natural environment by excessive land development. The results of this study are as follows; 1) The specialists thought that rare and endangered species were very important in plant and animal, in case of landscape and environment, naturality and water quality were too important. 2) In the result of the correlation measure on the indicator of assessment, 'erosion of soil'and 'air pollutant'was highly correlative. Secondly, 'suspended solids' and 'erosion of soil'was high correlation. 3) In the result of forming the factors into the integrated indicators, they were classified into conditional, stable, valuable and potential factors and the purpose of this formation is to evaluate proposed sites in NT objectively and rationally with organic assessment. 4) In the integrated assessment model, the degree of explanation was observed approximately 36.4% and the important factor was the conditional factor, but we have to consider all factors for the effective and objective assessment. Therefore we organically have to apply and use them for the assessment of proposed sites in NT. It turns out to offer raw data on the land conservation and carry out the role of the instrument of measurement. As for future directions, the follow are proposed: 1) adaptation of real proposed site, 2) verification of effect and problem, 3) practical survey for diverse types as mountain, coast and inland.