• Title/Summary/Keyword: Facility Maintenance

Search Result 873, Processing Time 0.028 seconds

A Study on the maintenance status of Special Education Facility (지역별 특수교육시설 정비현황에 관한 연구)

  • Lim, Chang-Hyun;Kim, Sung-Ryong
    • The Journal of Sustainable Design and Educational Environment Research
    • /
    • v.19 no.2
    • /
    • pp.32-40
    • /
    • 2020
  • In order to establish a special school considering the rights of disabled students to receive education and the principle of fair regional placement, this study identified the deviation of regional maintenance status of special education facilities and analyzed and examined their characteristics to provide desirable basic data for the establishment of facilities in the future. As a research method, the main status and maintenance index for each region were calculated based on the status of each special education subject and the disability area by using the statistics and facility data of the Ministry of Education, Special Education Policy Division, and the Ministry of Education of each province. According to the analysis results, large cities tended to rely on special classes and general classes due to the lack of facilities at special schools, and local cities showed uneven results for each disability area and supplemented the system lacking special education support centers. In overall evaluation, special education facilities have not yet been leveled across the country.

Risk Priority Number of Chemical Facilities by the Risk Assessment of Injury Analysis in the Chemical Plant (재해분석을 통한 화학공장의 위험성 평가에 따른 화학설비의 위험도 우선순위)

  • Shin, Woonchul
    • Journal of the Korean Institute of Gas
    • /
    • v.17 no.4
    • /
    • pp.39-44
    • /
    • 2013
  • There have been large explosions at some chemical plants recently. Accidents in chemical plants have been caused mainly by servicing for maintenance. There is a need to find a key target for effective injury prevention in maintenance. In this paper, facilities were selected as a key target and the risk priority numbers of the facilities were calculated in order to prioritize preventative measures. The research method was based on the followings; the list of the facilities is found through injury analysis. Then, the risk of each facility was calculated by the frequency of accidents and the working day loss through injuries. In addition, the risk of the facilities was calculated again by the frequency and the severity based on knowledge and experience of experts. As a result, the facilities in chemical plant maintenance are ranked in order of high to low risk priority number; reactor, dryer, tank lorry, etc. In the future, special measures and attention should be directed according to the risk priority number during the maintenance of chemical plants.

Study on Coal Combustion Characteristics with 1MWth Test Facility (1MWth 실험연소로를 이용한 석탄의 연소특성 연구)

  • Jang, Gil Hong;Chang, In Gab;Jeong, Seok Yong
    • Transactions of the Korean Society of Mechanical Engineers B
    • /
    • v.23 no.11
    • /
    • pp.1464-1472
    • /
    • 1999
  • Design and operation of $1MW_{th}$ pulverized coal combustion testing facility are described. Also the influence of air staging on NOx emission and burnout of coal flames was investigated in this facility. The test facility consisted of coal feeding system, firing system and flue gas treatment system. A top-fired externally air staging burner was adopted in order to avoid influence of gravity on the coal particles and for easy maintenance. Distribution of temperature and chemical species concentration of coal flames could be measured in vertical pass of furnace. Main fuel was pulverized (83.4% less than $80{\mu}m$) Australian high bituminous coal. From variety of test conditions, overall excess air ratio was selected at 1.2(20% excess air). Tho study showed that increasing the staged air resulted in lower NOx omission, and it was suggested to be more than 40% of the total combustion air for the substantial NOx reduction. Sufficient burnout was not achievable when NOx emission was less than 500ppm. Also, the amount of core air did not influence tho NOx reduction.

The Concept and Application of Sensor-based Integrated Intelligent Management of Urban Facilities for the u-City (센서 기반 지능형 u-City 도시시설물 통합관리의 개념 및 적용)

  • Lee, Jae Wook;Baik, Song Hoon;Seo, Myung Woo;Song, Kyu Seog
    • KIEAE Journal
    • /
    • v.9 no.5
    • /
    • pp.97-104
    • /
    • 2009
  • In the process of urban development, the increase in the number and the complexity of urban facilities gives rise to a variety of problems, such as increase in construction and maintenance cost. In particular, taking into account the fact that an emergency situation in an urban facility can cause substantial loss of property as well as casualties, it becomes important to intelligently perceive states of facilities and properly execute countermeasures through real-time monitoring. In recent years, practitioners and researchers have made efforts to improve current passive and manpower-dependent facility management systems to be more active and intelligent, by applying diverse ubiquitous computing technologies for the u-City project. In this study, after discussing major drawbacks of the conventional facilities management, the concept and the model of a sensor-based integrated intelligent management system for urban facilities are proposed. The proposed model, by analyzing and processing real-time sensor data from urban facilities, not only supports the management of individual facilities, but also enables the detection of complex facility-related events and the process of their countermeasures. This active and intelligent management of urban facilities is expected to overcome the limitation of the conventional facilities management, and provide more suitable facility management services for the u-City development.

Design of a Real-Time Facility Diagnosis & Complex Data Management System Using IT Convergence Technology (IT융합기술을 활용한 실시간 설비진단 및 복합정보 관리시스템 설계)

  • Kang, Moon-Sik
    • Journal of the Korea Society of Computer and Information
    • /
    • v.19 no.5
    • /
    • pp.53-60
    • /
    • 2014
  • With the rapid development of IT technology, recently, the development of IT convergence technology related to the facility diagnosis is prevalent, and the study for the efficient integrated management scheme is required to handle all relevant information, from the design to the maintenance, including the stage of repair. In this paper, an efficient scheme to process the complex data for the facility and its diagnosis is proposed based on IT convergence technique and the real-time complex data management is designed. In order to evaluate the performance of the proposed system, the real-time management system is designed for a particular facility, and the comparative results show the good performance of the proposed system.

HOT CELL RENOVATION IN THE SPENT FUEL CONDITIONING PROCESS FACILITY AT THE KOREA ATOMIC ENERGY RESEARCH INSTITUTE

  • YU, SEUNG NAM;LEE, JONG KWANG;PARK, BYUNG SUK;CHO, ILJE;KIM, KIHO
    • Nuclear Engineering and Technology
    • /
    • v.47 no.6
    • /
    • pp.776-790
    • /
    • 2015
  • Background: The advanced spent fuel conditioning process facility (ACPF) of the irradiated materials examination facility (IMEF) at the Korea Atomic Energy Research Institute (KAERI) has been renovated to implement a lab scale electrolytic reduction process for pyroprocessing. The interior and exterior structures of the ACPF hot cell have been modified under the current renovation project for the experimentation of the electrolytic reduction process using spent nuclear fuel. The most important aspect of this renovation was the installation of the argon compartment within the hot cell. Method: For the design and system implementation of the argon compartment system, a full-scale mock-up test and a three-dimensional (3D) simulation test were conducted in advance. The remodeling and repairing of the process cell (M8a), the maintenance cell (M8b), the isolation room, and their utilities were also planned through this simulation to accommodate the designed argon compartment system. Results and conclusion: Based on the considered refurbishment workflow, previous equipment in the M8 cell, including vessels and pipes, were removed and disposed of successfully after a zoning smear survey and decontamination, and new equipment with advanced functions and specifications were installed in the hot cell. Finally, the operating area and isolation room were also refurbished to meet the requirements of the improved hot cell facility.

A Study on Constructing the RCM-based Failure Analysis System for Railway Facilities & Equipments (RCM 기반 철도시설물 고장분석시스템 구축 - 서울메트로 -)

  • Jung, Kwan-Soo;Seo, Kwang-Hyuk;Lee, Jung-Joo;Nam, Jin-Geun
    • Proceedings of the KSR Conference
    • /
    • 2011.10a
    • /
    • pp.881-895
    • /
    • 2011
  • Seoul Metro railway facilities' inspection and maintenance tasks cause failure analysis, but if there is trouble the diverse cause investigation and the systematic analysis and management among broken facilities, related facilities and components fell short and the conditions are different. And, excess and insufficiency, under inspection and maintenance, is being raised regardless of the introduction year and the operating environment including the number of use by applying the same facilities in the uniform inspection cycle. In this study, we will analysis systematically facility system information, failures, operational status, performance, fault and maintenance information resulting from the maintenance management of railway facilities and derive the relationship between associated equipment and its components. In addition, optimizing the inspection and the maintenance cycles of railway facilities, we will improve the reliability of operation. Considering the probability of risk, it is possible to predict the occurrence of accidents or faults and to minimize the frequency of breakdown by pre-inspection maintenance. Finally, This paper is to introduce the content of constructing the Seoul Metro RCM-based failure analysis system for railway facilities to support the optimal continuance of operation status of equipments and the securement of the safe operation of vehicles.

  • PDF

Development of a Knowledge-based Information Management System for Plant Maintenance (설비 관리를 위한 지식기반 정보관리 시스템의 개발)

  • Yim, Hyung-Sang;Park, Young-Jae;Lee, Sang-Min;Choi, Jae-Boong;Kim, Young-Jin;Roh, Eun-Chul;Lee, Byung-Ine
    • Proceedings of the KSME Conference
    • /
    • 2003.04a
    • /
    • pp.149-156
    • /
    • 2003
  • Recently, the importance of plant maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as riskbased inspection(RBI), fitness for service guidelines(FFS), plant lifecycle management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system, which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

  • PDF

Development of a Knowledge-Based Information Management System for Plant Maintenance (설비 관리를 위한 지식기반 정보관리 시스템의 개발)

  • Park, Young-Jae;Lee, Sang-Min;Yim, Hyung-Sang;Choi, Jae-Boong;Kim, Young-Jin;Roh, Eun-Chul;Lee, Byung-Ine
    • Transactions of the Korean Society of Mechanical Engineers A
    • /
    • v.27 no.11
    • /
    • pp.1933-1940
    • /
    • 2003
  • Recently, the importance of plant maintenance(PM) was highly raised to provide efficient plant operation which highly affects the productivity. For this reason, a number of engineering methodologies, such as risk-based inspection(RBI), fitness for service guidelines(FFS), plant lifecycle management(PLM), have been applied to improve the plant operation efficiency. Also, a network-based business operation system, which is called ERP(Enterprise Resource Planning), has been introduced in the field of plant maintenance. However, there was no attempt to connect engineering methodologies to the ERP PM system. In this paper, a knowledge-based information system for the plant operation of steel making company has been proposed. This system which is named as K-VRS(Knowledge-based Virtual Reality System), provides a connection between ERP plant maintenance module and knowledge-based engineering methodologies, and thus, enables network-based highly effective plant maintenance process. The developed system is expected to play a great role for more efficient and safer plant maintenance.

A Study on the Maintenance Work ${\cdot}$ Organization Problem and Improvement for Public Educational Buildings (공립학교 시설물 유지관리 업무 ${\cdot}$ 조직의 문제점 및 개선방안)

  • Kim, Soung-Jik;Kim, Tae-Hui
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.249-252
    • /
    • 2006
  • As of August 2005, there are 9,007 facilities for public primary, middle and high schools in Korea. But because of depopulation, hereafter it is expected to allocate much more budget and interest to utilizing the existing facilities reasonably rather than new buildings construction. At present the maintenance of educational facilities is depend on not a preventive but a post preservation. And there is no established maintenance organization and system, which causes both facility deterioration and squandering of the nation's resources. Thus the object of this paper is to examine a maintenance system of established public school facilities and to improve the system which is enable to maximize the efficiency for the existing maintenance organization.

  • PDF