• Title/Summary/Keyword: Facility Condition Assessment

Search Result 66, Processing Time 0.027 seconds

BIM Application Process for Facility Condition Assessment Documentation Work

  • Yoo, Seung Eun;Yu, Jung Ho
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.268-270
    • /
    • 2015
  • Overseas countries' government and facility management industries make efforts to ensure precise and fluent data from building information modeling (BIM). In facility management, a large amount of data and information are necessary to continue the process activities. Facility condition assessment, which is performed to make budget plan for the maintenance and operation requires the related facilities' documentation and information. However, it depends on the owner and the user of the facility to provide accurate and complete information to consultant. The problems as follows: (1) owner and user should provide documents and information, and (2) the consultant cannot verify the provided information. To solve these problems, we suggest a methodology to produce the information for FCA through BIM. First, all of the essential documentation and assessment elements are listed. Next, the documents and elements are separated out, whether they are able to be extracted from BIM or not. Then, the list indicates only the data that is linked with BIM. The suggestion is expected to provide the required information through the connection to BIM with accuracy and completeness and to present another BIM application use for facility management.

  • PDF

An Improved Facility Management System for Public Facility Management Corporations (공공 시설관리기관의 시설관리시스템 개선에 관한 연구)

  • Kim, ChangDuk;Lee, HyunChul
    • Korean Journal of Construction Engineering and Management
    • /
    • v.19 no.1
    • /
    • pp.32-42
    • /
    • 2018
  • The importance of facility maintenance management cannot be overemphasized in that not only the value but also the performance of the facility is determined by the level of maintenance. The maintenance cost of the facility ranges from 3 to 10 times the initial construction cost depending the type and use of the facility over the life span. This maintenance importance is increased for the group of facilities and even more critical when the facilities compete for the limited budget with the limited resources such as manpower and equipment. This study analyzed sixteen public facility management corporations primarily for three items: 1) facility management system, 2) long-term rehabilitation plan, 3) the rehabilitation selection system. This paper provides and recommends the key elements of the facility maintenance management system based on the analysis of the sixteen corporations.

A Study on the Facility Management Method through Actual Condition of Space Management - Based on the National University (공간관리 현황조사를 통한 대학시설관리방안에 관한 연구 - 국립대학의 사례를 중심으로)

  • Ryu, Soo-Hoon;Lee, Hwa-Ryoung
    • Journal of the Korean Institute of Educational Facilities
    • /
    • v.16 no.4
    • /
    • pp.79-88
    • /
    • 2009
  • To enhance the administrational efficiency and for university facility and space management to be public, this research suggests a competent and an objective evaluation system and index. The study will assist national and university finances to contribute towards advanced education. Furthermore, figure out the space management condition of national university by utilizing the evaluation system, and through that suggesting efficient special management method. According to the result of this study, evaluation system for university facility can be widely divided into seven categories; system preparation, members conference, propriety of space allocation, propriety of management system, space use ratio, time control of space use, imposition index of surplus use. Based on these subdivisions, the space management category contains 19 evaluation items and the marking system allows perfect score of 100 points. In result of examining space management condition using the evaluation system, space management was well enforced in research focused university group where as in education centered university group, it shows relatively low enforcement. It also illustrated that efforts of evaluation items were required in categories of imposition index of surplus use and special use ratio in order for efficient space management.

The Development of Structural Test Facility for the Strength Assessment of CFRP Marine Leisure Boat (탄소섬유강화플라스틱 재료 레저선박의 구조강도 평가를 위한 시험설비 구축과 운용에 관한 연구)

  • Jeong, Han Koo;Zhang, Yang;Yum, Deuk Joon
    • Journal of the Society of Naval Architects of Korea
    • /
    • v.54 no.4
    • /
    • pp.312-320
    • /
    • 2017
  • This paper deals with the development of structural test facility for the strength assessment of marine leisure boat built from carbon fiber reinforced plastics (CFRP) materials. The structural test facility consists of test jig, load application and control system, and data acquisition system. Test jig, and load application and control system are designed to accommodate various size and short span to depth ratios of single skin, top-hat stiffened and sandwich constructions in plated structural format such as square and rectangular shapes. A lateral pressure load, typical and important applied load condition to the plates of the hull structure for marine leisure boat, is simulated by employing a number of hydraulic cylinders operated automatically and manually. To examine and operate the structural test facility, five carbon/epoxy based FRP square plates having the test section area of $1m^2$, which are part of CFRP marine leisure boat hull, are prepared and they are subjected to monotonically increasing lateral pressure loads. In the test preparation, considering the symmetry of the plates geometry, various strain gauges and linear variable displacement transformer are used in conjunction with data acquisition system utilizing LabVIEW. From the test observation, the responses of the CFRP hull structure of marine leisure boat are understood by obtaining load to deflection and strain to load curves.

A study on the performance improving of the dielectric test facilities for UHV heavy electric apparatus (초고압 중전기기 절연시험설비 성능개선 연구)

  • Lee, J.G.;Kim, M.K.;Jeong, J.Y.;Kim, I.S.;Kim, M.H.
    • Proceedings of the KIEE Conference
    • /
    • 2005.07c
    • /
    • pp.2100-2102
    • /
    • 2005
  • In this Paper, there have been brief review about the important consideration in laboratory planning and designing the dielectric testing facilities for heavy electric apparatus up to 800kV-class in the high voltage testing fields. To improve and reinforce the existing dielectric test facilities in the way of econo-mical and optimal condition, wide investigation and an analysis for a solution, especially overshoot compensation method. have been suggested. With the brief description about those matters in constructing and improving the test facilities, the specification of each facility has been shown in the paper.

  • PDF

Vulnerability Evaluation of Groundwater Well Efficiency and Capacity in Drought Vulnerable Areas (가뭄 취약지역의 관정 효율 및 능력에 대한 취약성평가)

  • Shin, Hyung-jin;Lee, Jae-young;Jo, Sung-mun;Jeon, Sang-min;Kim, Mi-sol;Cha, Sang-sun;Park, Chan-gi
    • Journal of The Korean Society of Agricultural Engineers
    • /
    • v.61 no.6
    • /
    • pp.41-53
    • /
    • 2019
  • Recently, the damage caused by climate change has been distinguished in the world. The Korean Peninsula is also suffering from drought, so it is necessary to study the vulnerability assessment to identify and predict the state of the irrigation facility, which is a irrigation facility. As the damage caused by drought is occurring in the Korean peninsula, it is necessary to study the vulnerability assessment to know the condition of the irrigation facility, and to predict it. The target areas were Yeongdong-gun, Cheonan-si, Mungyeong-si, Geochang-gun, Muju-gun, and Yeonggwang-gun. The survey items were selected as positive impacts survey items, including precipitation, groundwater level, and pumping capacity per groundwater well. The negative impacts were selected as the cultivation acreage, Number of days without rain, and the ratio of private underground wells. The survey method was investigated by various methods such as "weather data portal", "groundwater level status information", "agricultural drought management system", "groundwater survey yearbook". The results of vulnerability assessment were expressed by the score by conducting survey and standardization. As a result, Yeonggwang-gun showed normal vulnerability, and other areas showed "vulnerable" or "very vulnerable".

Measurement Uncertainty Assessment of Altitude Performance Test for a Turboshaft Engine (터보샤프트 엔진 고공성능시험의 측정 불확도 평가)

  • Yang, In-Young;Lee, Bo-Hwa
    • Journal of the Korean Society of Propulsion Engineers
    • /
    • v.14 no.4
    • /
    • pp.59-64
    • /
    • 2010
  • Measurement uncertainty assessment was performed for altitude performance test for a turboshaft engine. Mathematical models of measurement were suggested for major performance parameters such as shaft horse power, fuel flow, specific fuel consumption, and airflow. The procedure was compared with the test of turbojet or turbofan engines. Uncertainty involved with the test condition measurement was assessed. Influence of the test condition measurement uncertainty on the corrected performance data was discussed. Uncertainty assessment result was provided for a example test case using a real altitude test facility. For major performance parameters, measurement uncertainties were assessed as 0.65~1.09% including the test condition measurement uncertainty, 0.36~0.94% not including it.

A Study to define the range of sample size for setting Intensive Care Unit(ICU) facility guidelines - Focused on analysis of guidelines and present of ICUs facilities by general hospitals size (중환자실 시설기준 작성을 위한 기본시설 수준 설정 연구 - 국내·외 시설기준 및 국내 종합병원 병상규모 별 시설 현황분석을 기초로 하여)

  • Yoon, Hyung Jin;Cho, Jun Young
    • Journal of The Korea Institute of Healthcare Architecture
    • /
    • v.23 no.3
    • /
    • pp.47-56
    • /
    • 2017
  • Purpose : This study is a basic research to establish guidelines for healthcare facility in Korean healthcare market. As a first step, it is a main purpose for making beginning point of ICU guideline to set a basic level of ICU facility size and quality by analysis current ICU facilities and existed domestic guidelines : law, criteria of healthcare insurance review and assessment service, credit of Korea institute for healthcare accreditation. Methods : First of all, the all requirements of existed guidelines are put together and summarized. The summary is compared with that of US, UK, and Australia to know its quality difference with international market. In addition, all hospitals in Korean market are classified based on total bed number and ICU bed number to know the most occupied facility size range in the market. Second of all, by comparing 15 ICUs' current setting of the public general hospital, a general condition of ICU facility would be extracted based on function, floor area per bed, services Results : 72.8% of hospitals in Korea are belonging below 500 beds hospital. Among them 200-299 beds hospitals occupied 35.3% and are shown as the most occupied hospital size. As 15 public general hospitals are analyzed, it is clear that the more bed size and services the more ICU area per bed. As a result it is sure that the 300~500 bed may be a clear line as a general ICU condition whose function and bed number relatively consistent in the range. Implications : to keep the qualified medical environment and contemporary hospital trend, the guideline as a minimum requirement keep naturally out from current healthcare settings and should reflect their limit to reconcile with the new trend in the market.

Assessment of Degree and Safety Inspection Based on Maintenance Level in Domestic Youth Training Facility (국내 청소년시설 대상 유지관리기반 안전점검 및 안전성 평가 연구)

  • Lee, Jeong-Seok
    • Journal of the Korea institute for structural maintenance and inspection
    • /
    • v.24 no.3
    • /
    • pp.1-8
    • /
    • 2020
  • Recent the number, size and accident on Youth Training Facility have increased annually. Also, the discussion and interest relation to safety and maintenance of youth culture and education. This study asserts the necessity and importance of present condition and characteristic based on Youth Training Facility in domestic. Therefore, Results of this study, it is appeared that very vulnerable to improve safety and maintenance in them. Accordingly, The purpose of this study is to investigate the current status for the whole youth facilities. second it estimate on main damage and defect of them for the period four years.

Preliminary design and assessment of a heat pipe residual heat removal system for the reactor driven subcritical facility

  • Zhang, Wenwen;Sun, Kaichao;Wang, Chenglong;Zhang, Dalin;Tian, Wenxi;Qiu, Suizheng;Su, G.H.
    • Nuclear Engineering and Technology
    • /
    • v.53 no.12
    • /
    • pp.3879-3891
    • /
    • 2021
  • A heat pipe residual heat removal system is proposed to be incorporated into the reactor driven subcritical (RDS) facility, which has been proposed by MIT Nuclear Reactor Laboratory for testing and demonstrating the Fluoride-salt-cooled High-temperature Reactor (FHR). It aims to reduce the risk of the system operation after the shutdown of the facility. One of the main components of the system is an air-cooled heat pipe heat exchanger. The alkali-metal high-temperature heat pipe was designed to meet the operation temperature and residual heat removal requirement of the facility. The heat pipe model developed in the previous work was adopted to simulate the designed heat pipe and assess the heat transport capability. 3D numerical simulation of the subcritical facility active zone was performed by the commercial CFD software STAR CCM + to investigate the operation characteristics of this proposed system. The thermal resistance network of the heat pipe was built and incorporated into the CFD model. The nominal condition, partial loss of air flow accident and partial heat pipe failure accident were simulated and analyzed. The results show that the residual heat removal system can provide sufficient cooling of the subcritical facility with a remarkable safety margin. The heat pipe can work under the recommended operation temperature range and the heat flux is below all thermal limits. The facility peak temperature is also lower than the safety limits.