A Basic Study on the Improvement for Liquidated Damages at Construction Delay (지체상금 개선방안에 관한 기초연구)

  • Kook, Dong-Hoon;Son, Ki-Young;Kim, Sun-Kuk
    • Proceedings of the Korean Institute Of Construction Engineering and Management
    • /
    • 2006.11a
    • /
    • pp.458-461
    • /
    • 2006
  • With the opening in construction market, more diversified and internationalized construction culture is imported, but the level of our construction culture and policy is still not met the international standards. For example, there is a difference in the liquidated damages at delay due to the reason of builder imputation during the public construction project comparing the international standards like damages. It may lead to the potential claim. In this study, via comparing and analysis on the relevant international standards and extension expense for terms of work, actual compensation is selected, and improvement of liquidated damages like damages is presented.

  • PDF

An Integrated Expert Model for Delay Management in Construction Projects

  • jalal, Majid Parchami;Yousefi, Elham
    • Journal of Construction Engineering and Project Management
    • /
    • v.7 no.3
    • /
    • pp.1-14
    • /
    • 2017
  • Delay claim should actually be supported by a set of proper information so that the contractors could prove their validity. The so-called information should be able to clarify the relationship between delay events and how they impact on the whole project. Therefore, exploiting an integrated system by people who are involved in construction business would certainly prove helpful. In the present study, delay analysis methods have been investigated along with selecting a relatively comprehensive method which has been modified, and eventually, a novel model and its required modules have been proposed for evaluating delay claims. The suggested integrated model is formed to identify delayed events, to classify delays, to measure the impacts of delays on the project scheduling, and finally to estimate the damages which were caused by those so-called delays. A decision support system (DSS) model which is related to the integrated system is actually extracted from Iran's general contract conditions, that is, 4311 magazine (equivalent to red FIDIC book). It is then programmed and coded by C# program. This DSS model can be used as an input of Easy Plan program. In addition, at the end of this research, the coded DSS has been used along with the so-called program so that a modified and developed model could be generated.

Development Scheme of Transport Infrastructure in Poland as the European Union Member by Public Private Partnership

  • Stanislaw Barbuzynski;Kim Soo-Yong;Lee Young-Dai
    • Korean Journal of Construction Engineering and Management
    • /
    • v.5 no.3 s.19
    • /
    • pp.120-127
    • /
    • 2004
  • In May 2004, Poland with nine other Eastern European countries joined the European Union(EU). After accession to the EU, Poland will accelerate the realization of investment in road sector, and wants to achieve important development of its road network condition in year 2005. Polish government is not able to afford the whole investment needed for construction of its motorways, so it wants to develop effective techniques of project funding based on the Public Private Partnerships(PPP). Without having high-performance transport networks, one country's economy cannot be competitive. It was the reason for establishing the Trans European Network(TEN) in the European Union. It creates the links, which are still missing between the fifteen countries of Western Europe and the new member countries like Poland. Consequently, Poland will also need to establish a proper transport infrastructure network. This paper will discuss how the PPP scheme can be applied for the transport infrastructure development in Poland as a EU member.

A Study on First Demand Guarantees in International Construction Projects -Disputes arising from the DG and Recommendations for their Drafting- (해외건설공사에서 독립보증에 관한 분쟁과 그 대책)

  • Choi, Myung-Kook
    • THE INTERNATIONAL COMMERCE & LAW REVIEW
    • /
    • v.47
    • /
    • pp.129-156
    • /
    • 2010
  • Since the 1970s, international construction employers have commonly requested first demand guarantees upon their contractors as a form of security for due performance of their works. Contractors prefer the greater protection offered by more traditional forms of security requiring presentation of an arbitral award or other evidence of the caller's entitlement to compensation. Many contractors nonetheless feel that they have no alternative but to provide these unconditional guarantees in order to compete. However, these unconditional first demand guarantees are controversial and have given rise to numerous disputes both in arbitration and litigation. Disputes arising from first demand guarantees can be broken down into a) applications to prevent a perceived fraudulent or otherwise unfair or improper calling of a guarantee, b) claims arising from such abusive calls and c) claims relating to the consequences of such calls even if the call itself may not be abusive as such. The contractors should carefully assess the risk of an abusive call being made bearing in mind the difficulties he may face in seeking to prevent such a call. He should also bear in mind the difficulties, delays and cost he is likely to encounter in seeking to recover any monies wrongfully called. One option would be to provide that the call can only be made once and to the extent that the employer's damages have been assessed or even incurred or even for the default to have been established by an arbitral tribunal or court. Another option would be to provide that any call be accompanied by a decision of a competent and impartial third party stating that the contractor is in breach. For example, such a requirement could be incorporated into a construction contract based on the FIDIC Conditions by submitting this decision to a Dispute Adjudication Board. Another option would be to provide for the "ICC Counter-Guarantee Scheme". In sum, there would appear to be room for compromise between the employer and the contractor in respect of first demand guarantees by conditioning the entitlement to call such guarantees to the determination of a competent and impartial third party.

  • PDF

Risk Assessment Model for the Delay Protocol in the Conditions of Contract of International Construction Projects (해외 건설공사 공기지연사건의 합리적 대응을 위한 계약조건 리스크 평가 방법)

  • Lee, Hwangku;Shin, Dongwoo;Kim, Kyungrai;Cha, Heesung;Kim, Youngjae
    • Korean Journal of Construction Engineering and Management
    • /
    • v.18 no.6
    • /
    • pp.65-77
    • /
    • 2017
  • Recently, many Korean major construction companies are suffering from profit loss mainly due to a direct impact from delays in their overseas projects. In general, changes are inevitable in a large-scale project, and most of changes are directly linked to construction delay. Therefore, in the event that an extension of time is necessary due to a change, the contractor must manage the delay based on the condition of the contract to effectively manage risks from delay to the completion date. Thus it is important to understand delay protocol defined in the condition of the contract early in the project, but there have been few or no study to propose methodology or tool to support this effort. This paper presents a review on the project planning and controling practices of major Korean construction companies along with the issues on delay claims and disputes in mega-international projects and suggests a tool to assess delay risk in the condition of the contract. To propose a delay risk assessment model for international construction projects, major standard conditions of contract have been reviewed including FIDIC Red Book(1999), PSSCOC(2014) and SIA 9th Edition(2010). To reflect recent trend of major international owners, standard conditions which they are utilizing for their projects also have been reviewed including those of ARAMCO and QP. The model provides a categories of risks to be reviewed on the condition of the contract along with standard level of the risk which is common in the international standard form of the contracts. This study also performed a case study on an actual international project to confirm the effectiveness of proposed model to identify and respond to a delay risk of a project.

Research on ITB Contract Terms Classification Model for Risk Management in EPC Projects: Deep Learning-Based PLM Ensemble Techniques (EPC 프로젝트의 위험 관리를 위한 ITB 문서 조항 분류 모델 연구: 딥러닝 기반 PLM 앙상블 기법 활용)

  • Hyunsang Lee;Wonseok Lee;Bogeun Jo;Heejun Lee;Sangjin Oh;Sangwoo You;Maru Nam;Hyunsik Lee
    • KIPS Transactions on Software and Data Engineering
    • /
    • v.12 no.11
    • /
    • pp.471-480
    • /
    • 2023
  • The Korean construction order volume in South Korea grew significantly from 91.3 trillion won in public orders in 2013 to a total of 212 trillion won in 2021, particularly in the private sector. As the size of the domestic and overseas markets grew, the scale and complexity of EPC (Engineering, Procurement, Construction) projects increased, and risk management of project management and ITB (Invitation to Bid) documents became a critical issue. The time granted to actual construction companies in the bidding process following the EPC project award is not only limited, but also extremely challenging to review all the risk terms in the ITB document due to manpower and cost issues. Previous research attempted to categorize the risk terms in EPC contract documents and detect them based on AI, but there were limitations to practical use due to problems related to data, such as the limit of labeled data utilization and class imbalance. Therefore, this study aims to develop an AI model that can categorize the contract terms based on the FIDIC Yellow 2017(Federation Internationale Des Ingenieurs-Conseils Contract terms) standard in detail, rather than defining and classifying risk terms like previous research. A multi-text classification function is necessary because the contract terms that need to be reviewed in detail may vary depending on the scale and type of the project. To enhance the performance of the multi-text classification model, we developed the ELECTRA PLM (Pre-trained Language Model) capable of efficiently learning the context of text data from the pre-training stage, and conducted a four-step experiment to validate the performance of the model. As a result, the ensemble version of the self-developed ITB-ELECTRA model and Legal-BERT achieved the best performance with a weighted average F1-Score of 76% in the classification of 57 contract terms.