• Title/Summary/Keyword: External Project

Search Result 353, Processing Time 0.028 seconds

A Study on Activities of Architecture Craftsmen and Major Carpenters of Court Palace Performance Stages in the Late Joseon Dynasty (조선후기 궁중 연희무대 건축 장인(建築匠人)의 활동과 주요 목수(木手) 연구)

  • Seok, Jin-Young;Han, Dong-Soo
    • Journal of architectural history
    • /
    • v.28 no.3
    • /
    • pp.29-44
    • /
    • 2019
  • A major performance stage carpenter, Jang Insang led performance stages from the 1719 Sukjong Royal Banquet and was confirmed by historical records to be the first craftsman. Lee Wandeuk led the Hwaseong Fortress performance stages of the Jeongjo period and Gichuk Jinchan performance stages of the Sunjo period. The carpenter techniques he used during the Jeongjo period were succeeded to the Sunjo period. Ahn Sungil was the head craftsman who led the performance stages of Jagyeongjeon Jinjak, Muja Jinjak, and Gichuk Jinchan of the Sujo period, under which the foundation for court palace performances was laid. The progression of major carpenters includes Jang Insang of the Sukjong period, Jeon Yoochu of the Yeongjo period, Ahn Sugil of the Sunjo period, Yoon Seoksin of the Heonjong period, Kim Yoonsik of the Gojong period, Lee Jongyoon, Kim Soongil, Seo Sangmook, and Han Sujoon. In addition, the Major Repair of Injeongjeon Hall (1857) of the Cheoljong period was the most important palace construction project for transferring the carpenters' skills. Through this project, Ahn Sungil of the Sunjo period, Kim Myeonggap, Yoon Seoksin of the Heonjong period, Kwon Deuknyang, and Kim Sungil of the Gojong period were able to interact with each other. That is, this major repair project of Injeongjeon Hall reflected the major carpenters' best techniques through performance stage construction, showing the progression of Ahn Sungil, Yoon Seokshin, and Kim Sungil, who led the constructions of Gichuk Jinchan of the Sunjo period (1829), Mushin Jinchan of the Heonjong period (1848), and Jeonghae Jinchan of the Gojong period (1887), the most impressive performance stages of the late Joseon period. The carpenters of the court performance stages participated in important construction projects of the royal palace, reflecting the superior technical skills of the carpenters in the construction of court palace performance stages. The carpenters who played a leading role in the construction of performance stages were able to interact with one another and transfer their excellent technical skills, providing the driving force that allowed court performance stages to blossom into splendid and high-quality court stages in the late Joseon Dynasty.

OPTIMIZING QUALITY AND COST OF METAL CURTAIN WALL USING MULTI-OBJECTIVE GENETIC ALGORITHM AND QUALITY FUNCTION DEPLOYMENT

  • Tae-Kyung Lim;Chang-Baek Son;Jae-Jin Son;Dong-Eun Lee
    • International conference on construction engineering and project management
    • /
    • 2009.05a
    • /
    • pp.409-416
    • /
    • 2009
  • This paper presents a tool called Quality-Cost optimization system (QCOS), which integrates Multi-Objective Genetic Algorithm (MOGA) and Quality Function Deployment (QFD), for tradeoff between quality and cost of the unitized metal curtain-wall unit. A construction owner as the external customer pursues to maximize the quality of the curtain-wall unit. However, the contractor as the internal customer pursues to minimize the cost involved in designing, manufacturing and installing the curtain-wall unit. It is crucial for project manager to find the tradeoff point which satisfies the conflicting interests pursued by the both parties. The system would be beneficial to establish a quality plan satisfying the both parties. Survey questionnaires were administered to the construction owner who has an experience of curtain-wall project, the architects who are the independent assessor, and the contractors who were involved in curtain-wall design and installation. The Customer Requirements (CRs) and their importance weights, the relationship between CRs and Technical Attributes (TAs) consisting of a curtain-wall unit, and the cost ratios of each components consisting curtain-wall unit are obtained from the three groups mentioned previously. The data obtained from the surveys were used as the QFD input to compute the Owner Satisfaction (OS) and Contractor Satisfaction (CS). MOGA is applied to optimize resource allocation under limited budget when multi-objectives, OS and CS, are pursued at the same time. The deterministic multi-objective optimization method using MOGA and QFD is extended to stochastic model to better deal with the uncertainties of QFD input and the variability of QFD output. A case study demonstrates the system and verifies the system conformance.

  • PDF

South-South Collaborations: A Policy Recommendation Model for Sustainable Win-Win Infrastructure Partnerships Based on Sino - Ghana and Nigeria Case.

  • Eshun, Bridget Tawiah Badu;Chan, Albert P.C.;Oteng, Daniel;Antwi-Afari, Maxwell Fordjour
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.33-41
    • /
    • 2022
  • Infrastructure procurement has been a major engagement route between China and Africa. This contributes immensely to the gradual infrastructure development seen on the continent. However, maturing discourse purports that these infrastructure collaborations lack intentionality in the continuous development of strategic guidelines and policies for effective implementation despite their uniqueness and criticality. This study proposes that an efficient approach to policy recommendations is through the political and economic analysis (PEA) of these partnerships using public-private partnership (PPP) optics. Unquestionably, these partnerships are representative of the concept of diplomatic transnational public-private partnership (DT-PPP) where infrastructure is procured through the collaboration of public (African governments) and private sector (Chinese state-owned corporations) who provide the managerial, financial, and technical resources for the project implementation. Given the quest for sustainable win-win, this study identifies strategies towards the realization of win-win in the implementation (i.e enablers of win-win) such that fairness and co-benefit, as well as interests, will be achieved. Thus, based on the PEA framework, case scenarios from Ghana and Nigeria using expert interviews identify the criticalities and best practices for the realization of these enablers at the development phase. Findings indicate more effort is required of the public sector (African host countries) in terms of people, structure/institutions, and the implementation processes. Recommendations include improvement of environmental management structures, contract administration procedures, external stakeholders/local community engagement mechanisms, knowledge and technology transfer procedures, and sector-based project operation and maintenance culture and systems. Additionally, actors must have emotional intelligence, good problem-solving abilities, and overall ensure cordial relationships for continued bilateral cooperation.

  • PDF

Measuring the Impact of Supply Network Topology on the Material Delivery Robustness in Construction Projects

  • Heo, Chan;Ahn, Changbum;Yoon, Sungboo;Jung, Minhyeok;Park, Moonseo
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.269-276
    • /
    • 2022
  • The robustness of a supply chain (i.e., the ability to cope with external and internal disruptions and disturbances) becomes more critical in ensuring the success of a construction project because the supply chain of today's construction project includes more and diverse suppliers. Previous studies indicate that topological features of the supply chain critically affect its robustness, but there is still a great challenge in characterizing and quantifying the impact of network topological features on its robustness. In this context, this study aims to identify network measures that characterize topological features of the supply chain and evaluate their impact on the robustness of the supply chain. Network centrality measures that are commonly used in assessing topological features in social network analysis are identified. Their validity in capturing the impact on the robustness of the supply chain was evaluated through an experiment using randomly generated networks and their simulations. Among those network centrality measures, the PageRank centrality and its standard deviation are found to have the strongest association with the robustness of the network, with a positive correlation coefficient of 0.6 at the node level and 0.74 at the network level. The findings in this study allows for the evaluation of the supply chain network's robustness based only on its topological design, thereby enabling practitioners to better design a robust supply chain and easily identify vulnerable links in their supply chains.

  • PDF

Novel anatomical proposal for botulinum neurotoxin injection targeting depressor anguli oris for treating drooping mouth corner

  • Kyu-Ho Yi;Ji-Hyun Lee;Hye-Won Hu;You-Jin Choi;Kangwoo Lee;Hyung-Jin Lee;Hee-Jin Kim
    • Anatomy and Cell Biology
    • /
    • v.56 no.2
    • /
    • pp.161-165
    • /
    • 2023
  • The depressor anguli oris (DAO) muscle is a thin, superficial muscle located below the corner of the mouth. It is the target for botulinum neurotoxin (BoNT) injection therapy, aimed at treating drooping mouth corners. Hyperactivity of the DAO muscle can lead to a sad, tired, or angry appearance in some patients. However, it is difficult to inject BoNT into the DAO muscle because its medial border overlaps with the depressor labii inferioris and its lateral border is adjacent to the risorius, zygomaticus major, and platysma muscles. Moreover, a lack of knowledge of the anatomy of the DAO muscle and the properties of BoNT can lead to side effects, such as asymmetrical smiles. Anatomical-based injection sites were provided for the DAO muscle, and the proper injection technique was reviewed. We proposed optimal injection sites based on the external anatomical landmarks of the face. The aim of these guidelines is to standardize the procedure and maximize the effects of BoNT injections while minimizing adverse events, all by reducing the dose unit and injection points.

Three dimensional finite element analysis of 4 inch smart flange on offshore pipeline

  • Moghaddam, Ali Shaghaghi;Mohammadnia, Saeid
    • Ocean Systems Engineering
    • /
    • v.4 no.4
    • /
    • pp.279-291
    • /
    • 2014
  • Smart flanges are used for pipeline and riser repair in subsea. In a typical case in the gas export pipeline project, the end cap bolts of a 4inch smart flange were broken during operation, and in turn leakage occurred. This work presents the detail of three dimensional finite element analysis of the smart flange to support the observed end cap bolts failure. From finite element analysis it turns out that in the presence of external bending moment, an uneven contact distribution is present between seal and end cap, which in turn changes the uniform load distribution on bolts and threaten the integrity of bolts. On the other hand, 3D finite element analysis of interaction between pipeline and seabed is presented by means of Abaqus to explore the distribution of bending moment along the pipeline route. It is found that lateral buckling occurs in the pipeline which introduces large bending moment.

Assessment of transient vibrations of graphene oxide reinforced plates under pulse loads using finite strip method

  • Mirjavadi, Seyed Sajad;Forsat, Masoud;Barati, Mohammad Reza;Hamouda, A.M.S.
    • Computers and Concrete
    • /
    • v.25 no.6
    • /
    • pp.575-585
    • /
    • 2020
  • Based on a refined shear deformation finite strip, transient vibrations of graphene oxide powder (GOP) reinforced plates due to external pulse loads have been investigated. The plate has uniformly and linearly distributed GOPs inside material structure. Applied pulse loads have been selected as sinusoidal, linear and blast types. Such pulse loads result in transient vibrations of the GOP-reinforced plates which are not explored before. Finite strip method (FSM) has been performed for solving the equations of motion and then inverse Laplace transform technique has been employed to derive transient responses due to pulse loading. It is reported in this study that the transient responses of GOP-reinforced plates are dependent on GOP dispersions, GOP volume fraction, type of pulse loading, loading time and load locations.

Synthesis of p-Type ZnO Thin Film Prepared by As Diffusion Method and Fabrication of ZnO p-n Homojunction

  • Kim, Deok Kyu
    • Journal of the Korean Institute of Electrical and Electronic Material Engineers
    • /
    • v.30 no.6
    • /
    • pp.372-375
    • /
    • 2017
  • ZnO thin films were deposited by RF magnetron sputtering and then diffused by using an As source in the ampouletube. Also, the ZnO p-n homojunction was made by using As-doped ZnO thin films, and its properties were analyzed. After the As doping, the surface roughness increased, the crystal quality deteriorated, and the full width at half maximum was increased. The As-doped ZnO thin films showed typical p-type properties, and their resistivity was as low as $2.19{\times}10^{-3}{\Omega}cm$, probably because of the in-diffusion from an external As source and out-diffusion from the GaAs substrate. Also, the ZnO p-n junction displayed the typical rectification properties of a p-n junction. Therefore, the As diffusion method is effective for obtaining ZnO films with p-type properties.

Development of the EAI Solution Selection Criteria : Focused on the case of KRA (EAI(Enterprise Application Integration) 도입을 위한 평가기준 개발 적용에 관한 연구 : KRA 적용사례 중심으로)

  • Juhn Sung-Hyun;Park Chan Uk
    • Journal of Information Technology Applications and Management
    • /
    • v.12 no.4
    • /
    • pp.157-171
    • /
    • 2005
  • Recently companies are aggressively Pushing ahead with integrating the systematical applications of internal and external information systems such as Data level, Application level, Process level in the company, Process level between companies. The EAI solution is generally considered as the necessary tool to integrate companies, but the appraisal standard for the EAI solution has not Vet settled in Korea, so the companies have difficulty in deciding whether to adopt the EAI solution or not. Through this report, we first introduce the KRA Project as the best practice in making an application of the settled standard to evaluate and adopt the EAI solution, and then suggest that it can be adapted to companies considering applying to the EAI solution.

  • PDF

International Competitive Improvement through Stream Supply Chain Cooperative System Building of Textile Industry in the Daegu District (대구지역 섬유산업 스트림 공급망 협력체계 구축과 국제경쟁력 강화 방안)

  • Ryu, Geun-Woo;Kim, Seung-Ho
    • International Commerce and Information Review
    • /
    • v.12 no.2
    • /
    • pp.3-27
    • /
    • 2010
  • This paper covers a plan to build supply chain cooperation systems among stream of the textile industry to strengthen international competitiveness. To obtain the study objective, it has been reviewed the theoretical rationale relating to organizational cooperation model and discussion and performed the case study that analyzed stream group and participated firms to the textile stream policy project. The analyzed stream cooperative types that measured configuration of cooperative degree and productive type are new market creation, technology improvement, relation maintenance, and relation cease. Two types - new market creation and technology improvement - have significant effect of the textile stream cooperation. Key successful factors of these two effective types are the external intervention of specialized consulting organization and build internal coordination and integrated mechanism to the cooperative stream group and participated firms.

  • PDF