The vernacular houses with 田-shaped floor plan at Gangreung have been played important roles in tracing the vernacular living cultures including housing life. But due to the adoption of convenient facilities in vernacular housing lives caused by modernization and urbanization, many changes and transformations have happened at residential space of vernacular houses. This thesis targets to extract basic data to prepare and prevent various problems in process of renovation, extension and function change as installing housing life facilities, and to identify the changes and transformations of them to prepare the proper balances between their original form preservation and residents' convenience living. The results are as follows. The inner wall removal of rooms, the fuel change of cooking and heating, the leveling change of kitchen floor made possible the sedentary lifestyles. And its residential rooms were transformed from two row to one row by inner wall removal, the fuel heating change, the heating method change and the heat insulating materials. The residential extension materials were changed from the traditional materials such as soil, wood, etc to the modern materials such as cement block or brick, sandwich panel, etc. And the modern materials were used and attached to widen residential spaces to the vernacular house because of the easiness of execution. So, it is necessary for 田-shaped floor plan vernacular house owners to distribute printed execution guide book to prevent and minimize the various problems to be shown by extension, renovation and function change.
This study aims to establish the measures required for strengthening the internal stability of and executing the systematic plan for Gangwon-do in relation to the "urban regeneration preliminary project" launched by the Ministry of Land, Infrastructure, and Transport. The results of this study are as follows. The unit project carried out via the Gangwon-do urban regeneration preliminary project presented the tendency for the standardization of the H/W and S/W projects such as the establishment of the community anchor space and the resident competency reinforcement project. Further, rather than focusing on the contents that could objectively measure the effects of the project, it concentrated more on the performance indicators that are required for verifying the execution of unit projects like the establishment of buildings and operating programs. It was found to be insufficient with regard to the practicality of the project, the correlation with the New Deal Project, and the validity of the project contents. To improve these aspects, Gangwon-do would be required to highlight its distinguishability from the other regions and increase its practicality by operating the field-centered urban regeneration educational program, inducing the participation of experts in each of the areas in case there is a need to execute a project plan and discover a project with placeness. It also needs to focus on strengthening its connection with the urban regeneration new deal project by discovering the resident leaders and professional manpower, and establishing the performance indicators needed for systematically monitoring the regional changes in accordance to the urban regeneration preliminary project.
Companies are planning and executing IT projects using information technology as a means to secure external competitiveness. However, IT projects have high risks and uncertainties due to the invisibility of outputs (systems, services, products), and changes in plans frequently occur during project execution. As a result, most IT projects are closed without achieving the target performance. This can lead to a waste of resources and money for the company, which in turn leads to the loss of opportunities to enter new markets. This study intends to analyze the effect of changes in the project plan on customer satisfaction, which is the project performance. Also, we want to find the importance of project planning so that the target performance of the IT project can be achieved. For the empirical analysis of this study, about 500 actual project data were collected. As for the analysis method, statistical analysis such as simple and multiple regression analysis and control effect was performed. Looking at the results of the analysis, it was found that the scope change affects the cost change and the schedule change. Also, changes in scope and cost were found to affect project performance. The theoretical performance of this study proved the theoretical fact that good project performance comes out if the IT project is executed as planned. The practical performance suggested the need for a change in project management by proving that thorough execution of the project planning stage can improve the project performance in the Korean project management culture, where the project planning stage is poorly performed for the rapid implementation of the IT project.
The present study was designed to evaluate primary production organic matter in basin of lake around by execution of total maximum daily loading. BOD influent loading of Uiam lake was 2,819 kg/day, which was less then 28.3 percent, total effuluent loading as 3,619 kg/day, in comparision with BOD, total nitrogen influent loading was 4,681 kg/day, which was less then 10.0 percent, total effuluent loading as 5,150 kg/day. But in case of total phosphors influent loading was 73.3 kg/day, which was more then 34.2 percent, total run off loading as 48.3 kg/day. The result of survey reduction plan of primary production organic matter in basin of lake around which objectives of abstract is as follows. First plan was reduction of primary production organic matter by moving the outlet of municipal wastewater treatment center from present place to lake downstream. Secondary plan was improvement by diffusion type of outlet municipal wastewater treatment center. The third plan was reduction of environmental impact by passing and storing of municipal wastewater. Finally plan was decline water surface level which was present hydrouric retention time was reduction from 7.6 day to 6.0 day per meter.
Lifting plan in conjunction with the overall construction plan will be established. It is being created by executive director of the Corporation and other such as an experienced site manager. But, written lifting plan based on the limited information and experience is causing some problems such as decreasing productivity, workability loss, delay. The reasons for the problems are lack of prediction of construction execution, inappropriate materials on the past performance, individual experience, limits of knowledge, lack of technical materials, shortage of advisor. Therefore, to solve the problems, we have to overcome the situation in which we depends on lifting planner's experience and intuition, limited information by accumulating objective and reliable materials. Because unorganized lifting plan will lower efficiency of lifting equipment and make reducing construction period difficult. In this study, influence factors on lifting plans will be derived through reviewing literatures and lifting plan cases. Derived influence factors will be classified as components and classes, classified influence factors are assessed suitability. Also, Decision making items are derived from the factors. Finally, tower crane lifting plan process will be suggested from the result.
This study was conducted to analyze the policy impacts of the '2014 Rural Field Forum'. From 2013, Ministry of Agriculture, Food and Rural Affairs implemented Rural Field Forum to push forward rural development of inhabitants' initiative. In this study, we have evaluated that Rural Field Forum has crucial impacts on residents' competence, region capability and driving force of project by targeting the 374 residents of 350 villages in 9 states who participated in 2014 Rural Field Forum. We also sought for the solution to institutional improvement. Futhermore we analyzed each of leader group and normal residents for departmentalization of policy effects. Taken together, the analysis reveals that: 1)Rural field forum is demonstrated to have a positive effect on the establishment and execution of village development plan and all of its necessary components. 2)Regarding the effect on the village capabilities, the understanding and recognition of village organization was shown to be improved. 3)About regional capabilities, the interest in village project was advanced. 4)In terms of the project execution, Rural field forum turned out to affect the village council processes positively. 5)lastly, between the leader and the residents, the difference effectiveness between them revealed, with the same directivity and considerably bigger effect felt by the leader than by the residents overall.
최근에 동적으로, 즉 요구가 있는 즉시 서비스들을 조합하는 동적 웹 서비스 조합은 가장 큰 관심사 중 하나이다. 지금까지 동적 웹 서비스조합에 관한 많은 연구들이 수행되어졌는데 주로 사람이 개입된 반자동 대화식 조합 기법들이 제안되었다. 또한 이들 연구에서 탐색 알고리즘 및 워크플로우 설계 기법들이 부분적으로는 기술되어 있으나. 웹 서비스 조합 자동화를 위한 전반적인 워크플로우 처리과정을 기술한 연구는 아직 없다. 본 논문은 웹 서비스 조합 자동화 기법에 초점을 맞추고 있다. 주된 아이디어는 시멘틱 웹을 실현하기 위한 웹 온톨로지와 비즈니스분야에서 성공적으로 활용되고 있는 워크플로우 기법들을 적용하여 웹 서비스 조합 자동화 시스템을 구현하는 것이다. 본 연구에서는 웹 서비스발견을 위해 매칭 알고리즘이 제안되고, 웹 서비스들 간 상호연결을 지원하기 위해 매칭 알고리즘에 온톨로지 개념이 적용된다. 그리고 웹 서비스 조합 자동화를 지원하기 위한 워크플로우 실행계획이 기술된다. 마지막으로 실 데이터 실험을 통해 제안 시스템의 우수성을 보인다.
Park, Hwa-Gyoo;Shon, Ju-Chan;Park, Sung-Gin;Baik, Jong-Myung
한국전자거래학회:학술대회논문집
/
한국전자거래학회 1999년도 학술대회지 vol.2
/
pp.607-614
/
1999
In this paper, we demonstrate the implementation case using component based development tool under development process for application developments. The tool suggested provides the programming environment for the development of distributed manufacturing applications primarily. The development tool is classified into visual component, logic component, data component, knowledge component, neural net component, and service component which is a core component for the support component edit and execution. We applied the tool to the domain of the design and routing plan to retrieve existing similar design models in database, initiate a model, generate a process plan, and store the new model in the database automatically. Utilizing the tool, it integrates a geometric modeler, engineering/manufacturing database, and knowledge sources over the Internet.
행정대집행은 행정의 강제집행수단의 하나로 행정법상의 의무를 이행하지 않은 자를 대신하여 행정관청이나 제3자가 대행하고 소요비용을 의무자에게 청구하는 제도로 "강제대집행"이라고도 한다. 법에 의한 행정집행의 현장임에도 불구하고 물리력에 의한 강제집행이 시행됨으로 인하여 시행자와 의무자 사이에 온갖 폭력과 인권유린 행위가 난무하고 인적피해가 발생하여 사회문제화 되고 있으며, 경찰에 고발과 인권위원회에 진정하는 등의 경우가 점차 증가세에 있다. 이런 폭력의 현장에 동원되는 인원은 대부분 용역을 제공하는 민간경비업체가 공급하고 있으며, 경비원 자격이 없는 인원의 동원과 폭력조직과 연계된 소위 용역깡패의 무리한 대집행과 폭력행위가 문제 되고 있다. 이런 폭력의 현장에는 경제적 이권과 주거권, 생계형 투쟁, 외부의 개입 등 구조적으로 복잡한 문제가 내포되어 있다. 본 논문은 민간경비업체의 인원동원에 관심을 가지고 대집행 현장의 폭력의 유형과 폭력이 발생하는 원인을 분석하고 개선대책을 논의하였다. 그 결과로는 법과 제도적 개선으로 대집행의 현장에는 필히 시행청과 경찰관이 입회하여 민간경비업체의 물리적 집행이 합법적으로 이행되도록 통제하여야 하며, 폭력적 충돌양상이 발생하면 즉시 경찰이 개입하도록 명시하여야 한다. 시행청의 대집행에 대한 관행을 탈피하여 신중한 대집행 결정과 성과위주의 용역계약조건의 해소, 문제발생시 시행청의 책임 명시 등 수주과정에서의 폭력유발 요인을 제거해야 한다. 의무자의 집단행동을 통한 민원해결의 타성을 타파하고 공무집행의 방해나 대집행 비용의 청구 등 엄격한 법집행이 이루어져야하고, 제3자의 개입을 차단하여야 한다. 경비업체의 인원동원은 경비업법에 의한 자격과 교육을 이수한 인원으로 사전에 등록된 인원으로 제한하여야하며, 현장투입 전 관할 경찰관서에 근무지와 임무, 근무수칙 등을 명확히 기록한 집행계획서를 제출하도록 의무화하고, 복장, 장비 등 법규를 준수하도록 통제되어야 한다. 또한 폭력행위에 대한 개인의 형사적 책임을 명확히 하고, 사고 경력에 대한 수주의 제한 등 업체의 건전성 확보대책이 요구된다. 재활사업이란 명목의 특수단체의 수주행위가 근절되고, 도급과 하도급의 고리를 차단하여 능력과 법의 준수의지를 가진 업체가 수주하도록 해야 한다. 등이다. 주거권과 환경 등 사회문제, 생계, 보상 등의 개선대책 문제는 논외로 하였다.
국내 지자체들은 경쟁적으로 공공도서관 건립과 운영에 많은 관심을 갖고 다양한 사업을 추진해오고 있다. 그 일환으로 최근 각 지자체마다 외부 전문기관에 연구용역을 의뢰하여 도출된 결과를 바탕으로 자체 현황을 고려한 공공도서관 중·장기발전계획을 수립하여 시행하는 곳이 늘어나고 있다. 청주시는 2011년에 제1차 계획(2012~2016)을, 2016년에 "제2차 청주시 도서관 중·장기 종합발전계획 (2017~2021)"을 수립하여 시행해오고 있다. 이 연구는 청주시의 제2차 계획에 대한 중간 점검 성격으로, 2차 계획의 수립 내용과 현안 등을 분석하여 계획 대비 목표 달성에 도움을 주는 것을 목적으로 하였다. 이러한 연구 목적을 달성하기 위해, 첫째, 청주시 공공도서관 제1차 계획의 성과와 한계를 파악하였다. 둘째, 청주시 공공도서관 문화 환경 변화 추이를 분석하였다. 셋째, 청주시 공공도서관 제2차 계획의 추진 전략과 운영 성과를 살펴보았다. 특히 이 연구는 청주시 공공도서관 발전의 핵심요소인 조직체계 확충과 전문 인력 충원 및 예산지원 확대라는 측면에 중점을 두고 고찰하였다.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.