• Title/Summary/Keyword: Execution Phase

Search Result 191, Processing Time 0.026 seconds

A Study about BIM Execution Plan for Specialty Contractors at Construction Phase - focused on Specialty Contractors in Reinforced Concrete Works - (시공단계에 참여하는 전문건설업체를 위한 시공 BIM 수행계획 구축 - 철근콘크리트 업체를 중심으로 -)

  • Lee, Joo-Sung;Ham, Nam-Hyuk;Kim, Jae-Jun
    • Journal of KIBIM
    • /
    • v.5 no.3
    • /
    • pp.19-32
    • /
    • 2015
  • For decades, the productivity issue has been a primary concern for the all stake-holders who participate in domestic construction industry. Especially, between a whole life cycle of building, the construction phase's productivity problem makes or break the entire project. In this respect, the general construction company, who accept the order and construct the building(so called General Contractor), should consider various strategies, such as schedule management, cost management, quality management, inner-crew management, etc., for the productivity improvement., and almost of these management methods have been studied for a long time. But, the researches and studies about the specialty contractor, who construct the building directly in construction site were not sufficiently complete yet. This research begins as an idea which tries to apply the BIM(Building Information Modeling) into the tasks of Specialty contractors for their productivity improvement. And for the effective application of construction BIM to specialty contractors, establish of the BIM project execution plan for them, not the fragmentary adoption of BIM. Therefore, in this paper, we develop the BIM project execution plan for the reinforced concrete companies who conduct the framework construction which located on CP(Critical Path) Especially, we model the "Construction BIM Use List for the RC Work", "BIM Application Master Process" and "BIM Application Detailed Process", and general contractor who use these BIM uses list and process models can manage various specialty contractors about schedule, cost, earned value, quality, safety and environment management systematically.

The Study for Performance Analysis of Concurrency Control using Deferred Blocking (지연된 블록킹 방법을 사용한 동시성 제어 기법의 성능 분석에 관한 연구)

  • 남태희;박재운;위승민
    • KSCI Review
    • /
    • v.1 no.2
    • /
    • pp.95-107
    • /
    • 1995
  • The concurrency control can be critical to the performance of transaction processing systems. Conventional locking takes the blocking phenomenon, where waiting transactions continue to hold locks and block other transactions from progressing. The proposed scheme reduces the blocking probability by deferring the blocking behavior of transactions to the later stages of their execution. The transaction execution can be divided into a nonblocking phase where transactions wait for locks but do not block other transactions and a blocking phase as in conventional locking. However data accessed during the nonblocking phase can lead to transaction abort. By properly balancing the blocking and abort effects, the proposed scheme can lead to better performance than either the conventional locking or the optimistic concurrency control(OCC) scheme at all data and resource contention levels.

  • PDF

A Case Study of Active Workflow Component Architecture on Constraints Based (제약식 기반의 능동적 워크플로우 컴포넌트 아키텍쳐 사례 연구)

  • Seo, Jang-Hoon;Shim, Sang-Yong;Lee, Kun-Hyuk;Park, Myeong-Kyu
    • Proceedings of the Safety Management and Science Conference
    • /
    • 2006.11a
    • /
    • pp.415-426
    • /
    • 2006
  • Many technical and nontechnical issues hinder enterprise wide workflow management. The most significant technical issue is the inability to deal with the heterogeneity among users, workflow types, and WFMSs. Not all users demand the same workflow functionality, so user interfaces of different levels of sophistication are required. Because workflow types cannot always be fully predefined, they often need to be adjusted or extended during execution. Unlike relational database management systems, however, each WFMS often has differing workflow metamodels. This leads to incompatibility between WFMSs, making integration into an environment comprising many heterogeneous WFMSs a troublesome and sometimes impossible task. Current Workflow system consists mainly of Database system. It contains some problems like that the integration relationship among system processes cant be expressed properly. This research has been focused on two phases that should be considered in the Workflow system. First of all, the first phase is the analysis phase; one of its role is to figure out independent execution task unit(Workflow component). The second phase is design phase that provides with the framework to execute these task units actively. The Workflow component extraction method in the analysis phase uses a analysis method called C-C Net and, in the design phase, the architecture that makes the these Workflow component executed actively is provided. Through this research, each process is divided into a task unit and more effective Workflow system could be formed by executing these units actively. Current system layer calls task units, on the other hand, the Workflow system this research implemented provides with the architecture that places a layer between them that controls task units actively.

  • PDF

Application Period and Participants for Construction Engineering at the Design Phase in Tall Building Construction (초고층 건축공사 설계단계에서의 시공엔지니어링 업무 적용시기 및 수행주체 분석)

  • Lee, Jin Woong;Cho, Kyuman;Kim, Taehoon
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.179-180
    • /
    • 2017
  • In order to improve the constructability of tall building construction, there is increasing needs to derive the design output by performing construction engineering at the design phase. It contributes to minimizing wastes such as design changes and reworks as well as improving project performance. Therefore, in this study, we analyzed the application period and participants for engineering tasks derived from a previous study, and then regrouped to efficiently reflect them at the design phase. Considering similarity of application period and attributes, the existing 22 engineering tasks, which were classified into 5 factors, were reclassified into 13 groups. The results of this study can be used as basic data for efficient construction engineering execution at the design phase.

  • PDF

A basic Study on Establishment Plan of Design Information Traceability through Design Information Flow Identification for Controlled Equipment during the NPP Lifecycle (원전 생애주기 관리대상 기기의 정보 흐름 규명을 통한 설계정보 추적성 구현방안에 대한 기초 연구)

  • Lim, Byung-Ki
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2017.11a
    • /
    • pp.183-184
    • /
    • 2017
  • Some of the information created during the design phase of an New NPP life cycle is useful only for the execution of the construction phase; however, much of the information greatly impacts the longer-term operational phase. To most make use of design and construction information produced by data based design system during the construction and operation phase, This research is identified controlled data and drawn design information of controlled equipment from documents generated during the life-cycle stages. This study aimed to analyze related documents to assure traceability of controlled equipment from design phase through O&M and then suggested DB(Data Base) based control method on technical information of major equipment throughout nuclear power plant lifecycle.

  • PDF

Health Monitoring and Efficient Data Management Method for the Robot Software Components (로봇 소프트웨어 컴포넌트의 실행 모니터링/효율적인 데이터 관리방안)

  • Kim, Jong-Young;Yoon, Hee-Byung
    • Journal of Institute of Control, Robotics and Systems
    • /
    • v.17 no.11
    • /
    • pp.1074-1081
    • /
    • 2011
  • As robotics systems are becoming more complex there is the need to promote component based robot development, where systems can be constructed as the composition and integration of reusable building block. One of the most important challenges facing component based robot development is safeguarding against software component failures and malfunctions. The health monitoring of the robot software is most fundamental factors not only to manage system at runtime but also to analysis information of software component in design phase of the robot application. And also as a lot of monitoring events are occurred during the execution of the robot software components, a simple data treatment and efficient memory management method is required. In this paper, we propose an efficient events monitoring and data management method by modeling robot software component and monitoring factors based on robot software framework. The monitoring factors, such as component execution runtime exception, Input/Output data, execution time, checkpoint-rollback are deduced and the detail monitoring events are defined. Furthermore, we define event record and monitor record pool suitable for robot software components and propose a efficient data management method. To verify the effectiveness and usefulness of the proposed approach, a monitoring module and user interface has been implemented using OPRoS robot software framework. The proposed monitoring module can be used as monitoring tool to analysis the software components in robot design phase and plugged into self-healing system to monitor the system health status at runtime in robot systems.

A Systems Engineering Approach to FEED Work Process Development for Refinery Plant (시스템 엔지니어링 접근 방법에 의한 정유 플랜트의 FEED 수행 업무 프로세스 개발)

  • Kim, Sun Young;Cha, Jae-Min;Kim, Junpil;Suh, Suk-Hwan;Sur, Hwal Won
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.10 no.1
    • /
    • pp.1-15
    • /
    • 2014
  • Refinery plant producing petroleum products from crude oil has significantly contributed to the creation of the national interests as a leading engineering industries. However, domestic Engineering Procurement Construction (EPC) companies are facing heavy competition for orders. Domestic EPC companies as EPC contractors are faced with some problems such as undertaking responsibility for FEED packages produced by other FEED companies. But domestic EPC contractors are unfamiliar to development and validation of FEED packages. It causes poor profitability and lower competitiveness of domestic companies. It is necessary for domestic companies to have capability to perform FEED activities in order to overcome these limitations instead of focusing on EPC phase after FEED phase. The systematic procedure is needed to perform the FEED activities, however, there are present difficulties on it due to the lack of experience in FEED packages development which require various engineering knowledge of chemical process, mechanics, electrics, instrumentation, civil engineering. This study has applied systems engineering method which is multi-disciplinary approach to derive and verify the solution to meet the customer's needs when the complex system is developed to task execution process development of FEED activities for refinery plant. The problems that may occur in the future were identified in advance by taking into account the various stakeholders and system context through the application of systems engineering. It helps to develop the task execution process systematically. The developed task execution process of FEED activities is planned to make effectiveness verified by engineering professionals experienced in FEED and continually enhance this process by field application.

An Analysis of Risk Factors of a Construction Project through Execution Plan (실행분석을 통한 건설 프로젝트의 위험 요인 분석)

  • Park Young-Min;Kim Soo-Yong;Kim Ki-Young
    • Korean Journal of Construction Engineering and Management
    • /
    • v.6 no.2 s.24
    • /
    • pp.139-149
    • /
    • 2005
  • The major purpose of construction project management is to meet defined targets(scope or quality) on schedule and budget. Korean construction industry is suuering from lower productivity as compared to other industry sectors. 'Management software' of the construction industry has not been developed as fast as hardware in the aftermath of compressed economic development following the Korean War. Therefore, this study is intended to compare project execution at planning phase and at completion phase and identifying the risk factor of construction projects. Construction projects are more extensive and long-winding than any other projects and stake holders of complex interests are often involved. In this study, we identified and analyzed risk factor for domestic building construction projects and outputs of this study will be conducive to the improvement of construction management processes in the future.

Development of a drift-flux model based core thermal-hydraulics code for efficient high-fidelity multiphysics calculation

  • Lee, Jaejin;Facchini, Alberto;Joo, Han Gyu
    • Nuclear Engineering and Technology
    • /
    • v.51 no.6
    • /
    • pp.1487-1503
    • /
    • 2019
  • The methods and performance of a pin-level nuclear reactor core thermal-hydraulics (T/H) code ESCOT employing the drift-flux model are presented. This code aims at providing an accurate yet fast core thermal-hydraulics solution capability to high-fidelity multiphysics core analysis systems targeting massively parallel computing platforms. The four equation drift-flux model is adopted for two-phase calculations, and numerical solutions are obtained by applying the Finite Volume Method (FVM) and the Semi-Implicit Method for Pressure-Linked Equation (SIMPLE)-like algorithm in a staggered grid system. Constitutive models involving turbulent mixing, pressure drop, and vapor generation are employed to simulate key phenomena in subchannel-scale analyses. ESCOT is parallelized by a domain decomposition scheme that involves both radial and axial decomposition to enable highly parallelized execution. The ESCOT solutions are validated through the applications to various experiments which include CNEN $4{\times}4$, Weiss et al. two assemblies, PNNL $2{\times}6$, RPI $2{\times}2$ air-water, and PSBT covering single/two-phase and unheated/heated conditions. The parameters of interest for validation include various flow characteristics such as turbulent mixing, spacer grid pressure drop, cross-flow, reverse flow, buoyancy effect, void drift, and bubble generation. For all the validation tests, ESCOT shows good agreements with measured data in the extent comparable to those of other subchannel-scale codes: COBRA-TF, MATRA and/or CUPID. The execution performance is examined with a mini-sized whole core consisting of 89 fuel assemblies and for an OPR1000 core. It turns out that it is about 1.5 times faster than a subchannel code based on the two-fluid three field model and the axial domain decomposition scheme works as well as the radial one yielding a steady-state solution for the OPR1000 core within 30 s with 104 processors.

Management Protocols of Global Transaction Based on Transaction State Transitions in an Optimistic 2-phase Commit Protocol (낙관적 2단계 완료 규약에서 트랜잭션 상태전이를 기반으로 한 전역 트랜잭션 관 리 규약)

  • Sin, Dong-Cheon
    • The Transactions of the Korea Information Processing Society
    • /
    • v.3 no.6
    • /
    • pp.1365-1374
    • /
    • 1996
  • To alleviate the blocking inherent in 2-phase commit protocol(2PC) that is widely used to ensure the atomicity of global transactions in distributed environments, an optimistic 2PC can be used. Under the optimistic 2PC, compensation transactions are introduced to ensure the atomicity of transactions, which may result in the violation of global serializability due to the properties of compensation, transactions. In this paper, we propose several valid management protocols for global transactions to ensure the global serializability through the analysis of transaction of state transitions. To determine the execution of one global transaction, the proposed protocols check the sates of other concurrent global transactions. According to the result, execution of the global transaction may be delayed to ensure the global serializability.

  • PDF