Stability evaluation of existing subway structure by adjacent excavation in urban tunnelling (도심지 터널 근접시공에 의한 기존 지하철 구조물 안정성 평가)

  • Han, Sangmin;Lee, Donghuk;Park, Duhee
    • Journal of Korean Tunnelling and Underground Space Association
    • /
    • v.23 no.5
    • /
    • pp.339-357
    • /
    • 2021
  • As the construction of trans infrastructure using the underground tunnel have been rapidly increased, various nearby excavation of existed underground facility including subway structure has been occurred in urban tunnelling. The concern and worry relating to the safety and stability of the existed facility by nearby excavation is becoming the key issues in urban tunnelling. In this study, it was conducted for existed the subway station structure at Seoul subway line which was closely located in the new Dongbuk urban metro railway to determine the behavior characteristics of station structure according to adjacent tunnel construction. Also, it was reviewed the evaluation of the safety zone and excavation method for subway structure. And after a review of damage evaluation, track irregularities and structural calculation by using a numerical analysis, stability of the subway structure according to nearby tunnel excavation was evaluated to be secured. This study is expected to be applied as useful reference in advance if you need to review the effects of existed structure according to nearby construction in complex urban tunnelling.

A Study on the Behaviour of the Station Structure due to Adjacent Construction (근접시공에 따른 정거장구조물 거동특성에 관한 연구)

  • Chung, Jeeseung;Kim, Manhwa;Lee, Sungil;Kim, Hongjoo;Shin, Youngwan
    • Journal of the Korean GEO-environmental Society
    • /
    • v.17 no.11
    • /
    • pp.55-64
    • /
    • 2016
  • Recently, it has been made many adjacent construction of inter-facility by the expansion of urban infrastructure facilities using the underground space. The complaints relating to the stability of the facility by adjacent construction is common. In this study, it was conducted for the subway line 5 Gimpo airport station structure in the upper Gimpo urban railway to determine the behavior characteristics of station structure according to adjacent construction. It was performed evaluation of the safety zone and excavation method for station structure. And after a review of damage evaluation, track irregularities and structural calculation by using a numerical analysis, stability of the station structure according to adjacent construction was evaluated to be secured. This study is expected to be used as basic data in advance if you need to review the effects of nearby structure according to adjacent construction.

An Introduction to the DECOVALEX-2019 Task G: EDZ Evolution - Reliability, Feasibility, and Significance of Measurements of Conductivity and Transmissivity of the Rock Mass (DECOVALEX-2019 Task G 소개: EDZ Evolution - 굴착손상영역 평가를 위한 수리전도도 및 투수량계수 측정의 신뢰도, 적합성 및 중요성)

  • Kwon, Saeha;Min, Ki-Bok
    • Tunnel and Underground Space
    • /
    • v.30 no.4
    • /
    • pp.306-319
    • /
    • 2020
  • Characterizations of Excavation Damage Zone (EDZ), which is hydro-mechanical degrading the host rock, are the important issues on the geological repository for the spent nuclear fuel. In the DECOVALEX 2019 project, Task G aimed to model the fractured rock numerically, describe the hydro-mechanical behavior of EDZ, and predict the change of the hydraulic factor during the lifetime of the geological repository. Task G prepared two-dimensional fractured rock model to compare the characteristics of each simulation tools in Work Package 1, validated the extended three-dimensional model using the TAS04 in-situ interference tests from Äspö Hard Rock Laboratory in Work Package 2, and applied the thermal and glacial loads to monitor the long-term hydro-mechanical response on the fractured rock in Work Package 3. Each modelling team adopted both Finite Element Method (FEM) and Discrete Element Method (DEM) to simulate the hydro-mechanical behavior of the fracture rock, and added the various approaches to describe the EDZ and fracture geometry which are appropriate to each simulation method. Therefore, this research can introduce a variety of numerical approaches and considerations to model the geological repository for the spent nuclear fuel in the crystalline fractured rock.

Experimental Study for Confirmation of Relaxation Zone in the Underground Cavity Expansion (지중 내 공동 확장에 따른 이완영역 확인을 위한 실험적 연구)

  • Kim, Youngho;Kim, Hoyeon;Kim, Yeonsam;You, Seung-Kyong;Han, Jung-Geun
    • Journal of the Korean Geosynthetics Society
    • /
    • v.16 no.4
    • /
    • pp.231-240
    • /
    • 2017
  • Recently, there have been frequent occurrences of ground sink in the urban area, which have resulted in human and material damage and are accompanied by economic losses. This is caused by artificial factors such as soil loss, poor compaction, horizontal excavation due to the breakage of the aged sewage pipe, and lack of water proof at vertical excavation. The ground sink can be prevented by preliminary restoration and reinforcement through exploration, but it can be considered that it is not suitable for urgent restoration by the existing method. In this study, a model experiment was carried out to simulate the in-ground cavities caused by groundwater flow for developing non-excavation urgent restoration in underground cavity and the range of the relaxation zone was estimated by detecting the around the cavity using a relaxation zone detector. In addition, disturbance region and relaxation region were separated by injecting gypsum into cavity formed in simulated ground. The shape of the underground cavity due to the groundwater flow was similar to that of the failure mode III formed in the dense relative density ground due to water pipe breakage in the previous study. It was confirmed that the relaxed region detected using the relaxation zone detector is formed in an arch shape in the cavity top. The length ratio of the relaxation region to the disturbance region in the upper part of the cavity center is 2: 1, and it can be distinguished by the difference in the decrease of the shear resistance against the external force. In other words, it was confirmed that the secondary damage should not occur in consideration of the expandability of the material used as the injecting material in the pre-repair and reinforcement, and various ground deformation states will be additionally performed through additional experiments.

Tunnel Stability Assessment Considering Rock Damage from Blasting Near to Excavation Line (굴착선 주변공 발파의 암반손상을 고려한 터널 안정성 검토)

  • 이인모;윤현진;이형주;이상돈;박봉기
    • Journal of the Korean Geotechnical Society
    • /
    • v.19 no.4
    • /
    • pp.167-178
    • /
    • 2003
  • Damage and overbreak of the remaining rock induced by blasting can not be avoided during tunnel construction which may result in either short-term or long-term tunnel instability. Therefore, in this paper, a methodology to take into account the effect of blast-induced damage in tunnel stability assessment is proposed. Dynamic numerical analysis was executed to evaluate damage and overbreak of the remaining rock for the most common blasting pattern in road tunnel. Rock damage was quantified by utilizing the damage variable factor which is adopted proposed in continuum damage mechanics. The damaged rock stiffness and the damaged failure criteria are used to consider the effect of rock damage in tunnel stability analysis. The damaged geological strength index of the damaged rock was newly proposed from the relationship between deformation modulus and geological strength index. Also the Hoek-Brown failure criteria of the damaged rock was obtained using the damaged geological strength index. Analysing the tunnel stability with the consideration of the blast-induced damage of remaining rock, it was found that the extend of plastic zone and deformation increased compared to the undamaged rock. Therefore the short-term or long-term tunnel stability will be threatened when the rock damage from blasting is ignored in the tunnel stability analysis.

FEM Analysis on the PD-3 Tunnel Section (유한 요소법에 의한 터널해석(사례문제 2))

  • Kim, Gyo-Won;Eom, Gi-Yeong;Lee, Jae-Seong
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 1991.10a
    • /
    • pp.108-122
    • /
    • 1991
  • For the tunnel pattern of PD-3, a numerical analysis using the FEM program, MrSoil, was conducted with given geotechnical properties of surrounding rockmasses to verify the analysis results by comparing with other programs. The analyzed domain was extended to the far enough distance from the excavation surface to avoid the restrained effect by the boundary condition, and the construction sequence was employed in the analysis as calculation steps to simulate the time dependent 3 dimentional behavior of surrounding ground due to tunneling. Maximum 35 mm of the tunnel crown settlement and about 13 mm of the surface settlement were computed and the amount of settlement may not give any structural damage on the concrete structures on the ground surface. The shotcrete stress of 84 kg/cm2 and the rockbolt axial force of 9 ton as a maximum are within the allowable limit. The plastic zone was restricted near the excavation surface, but forepoling around the crown may be required to prevent rock falling. It is believed that the tunnel is designed reasonablely from the economical and safety points of view.

  • PDF

Safety Effect Evaluation of Existing Metro Tunnel by Deep Urban Tunnelling (대심도 도심지 터널시공에 의한 기존 지하철 터널 안전영향 평가)

  • Han, Sang-Min;Lee, Dong-Hyuk;Lee, Sung-Ho
    • Journal of the Korean Geotechnical Society
    • /
    • v.37 no.9
    • /
    • pp.37-50
    • /
    • 2021
  • Recently, due to the expansion of urban infrastructure using underground spaces in urban areas, many adjacent constructions and excavations have been made carried out between existing facilities, and complaints related to the stability of existing facilities due to close construction have become significant issues. In this study, it was closely reviewed for the existing metro tunnel structure in the new Dongbuk urban metro railway to determine the behavioral characteristics of tunnel structure according to adjacent tunnel construction. Also, it was analysed the evaluation of the safety zone and excavation method for metro tunnel structure. And after a detailed damage assessment, track irregularities and structural calculation by using a numerical analysis, stability of the metro tunnel structure according to nearby tunnel excavation was evaluated to be secured for safety. This study is expected to be applied as practical reference to review the evaluation of safety effects of existing tunnel structure and buildings according to adjacent construction in complex deep urban tunnelling.

Study on the Estimation of Safety Zone and the Movement of Ground at the Inter-Crossing Tunnel (교차터널에서의 지반거동 및 안전영역평가에 관한 연구)

  • Kim, Woo-Sung;Yoo, Dong-Uk;Lee, Sang-Eun
    • Tunnel and Underground Space
    • /
    • v.18 no.6
    • /
    • pp.491-502
    • /
    • 2008
  • A certain range of the original ground around the tunnel should be preserved to ensure structural safety of the tunnel when other structures are made around the tunnel, and thus this range is defined as safety zone of the tunnel. The main points to ensure the stability of an existing tunnel when constructing a new tunnel in an inter-crossing area are distance between two tunnels, size of the new tunnel, excavation method for the new tunnel, ground condition around the tunnel, and lining type of the existing tunnel etc. When the new tunnel is excavated above the existing tunnel, the existing tunnel is likely to suffer deformation at a crown zone, damage of arching effect, and live load of the new tunnel etc. On the other hand, when the new tunnel is excavated below the existing tunnel, the existing tunnel is likely to be damaged due to settlement. This study has been made on the behavior of the existing tunnel by means of model test and numerical analysis when the new tunnel is excavated below the existing tunnel. Safety zone of the tunnel was estimated by the results of strength/stress ratio obtained from numerical analysis, and the movement of ground was estimated by the model test. The results of earth pressure, ground displacements, and convergence of the tunnel obtained from model test were compared with those of numerical analysis, and show a similar trend.

Study on the Crack Generation Patterns with Change in the Geometry of Notches and Charge Conditions (노치 형상 및 장약조건의 변화에 따른 균열발생양상에 관한 연구)

  • Park, Seung-Hwan;Cho, Sang-Ho;Kim, Seung-Kon;Kim, Kwang-Yeom;Kim, Dong-Gyou
    • Tunnel and Underground Space
    • /
    • v.20 no.1
    • /
    • pp.65-72
    • /
    • 2010
  • Crack-controlled blasting method which utilizes notched charge hole has been proposed in order to achieve smooth fracture plane and minimize the excavation damage zone. In this study, the blast models, which have a notched charge hole, were analyzed using dynamic fracture process analysis software to investigate the effect of the geometry of a notched charge hole and decoupling indexes of the charge hole on crack growth control in blasting. As a result, crack extension increased and damage crack decreased with the notch length. Ultimately, stress increment factors and resultant fracture patterns with different notch length and width were analyzed in order to examine the effect factors on the crack growth controlling in rock blasts using a notched charge hole.

Utilization and Excavation Practices of Fire-Fighting Vulnerable Zone Model (소방취약지 모델의 활용 및 적용사례 발굴)

  • Choi, Gap Yong;Chang, Eun Mi;Kim, Seong Gon;Cho, Kwang-Hyun
    • Spatial Information Research
    • /
    • v.22 no.3
    • /
    • pp.79-87
    • /
    • 2014
  • In order to foster rapid disaster response and public life protection, National Emergency Management Agency has been trying to spread 'Emergency Rescue Standard System' on a national scale since 2006. The agency has also intensified management of firefighter's safety on disaster site by implementing danger predication training, specialized training and education and safety procedure check as a part of safety management officer duties. Nevertheless, there are limitations for effective fire fighting steps, such as damage spreading and life damage due to unawareness of illegal converted structure, structure transformation by high temperature and nearby hazardous material storage as well as extemporary situation handling endangered firefighter's life. In order to eliminate these limitations there is a need for an effort and technology application to minimize human errors such as inaccurate situational awareness, wrong decision built on experience and judgment of field commander and firefighters. The purpose of this study is to propose a new disaster response model which is applied with geospatial information. we executed spatial contextual awareness map analysis using fire-fighting vulnerable zone model to propose the new disaster response model and also examined a case study for Dalseo-gu in Daegu Metropolitan City. Finally, we also suggested operational concept of new proposed model on a national scale.