The Single Effect Evaluation System for Analyzing the Effectiveness of R&D Project (R&D프로젝트의 효과분석을 위한 단독효과평가체계)

  • Gwon Cheol Sin;Park Jun Ho;Gang Il Jung
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2003.05a
    • /
    • pp.966-971
    • /
    • 2003
  • [ $\lceil\;Cost Effectiveness Analysis\;\rfloor$ ] has been widely used to evaluate effectiveness of R&D resources. But, almost of cost effectiveness evaluation systems have some problems, especially estimating method of effect on R&D project is very rough and imprecise. To solve this problem, we have designed new single effect evaluation system, which are able to apply the distribution of order statistics and to transform relative measure into absolute measure for getting single effect.

  • PDF

Evaluation of R&D Projects in Electric Power Industry with Efficiency and Effectiveness (전력산업 R&D 프로젝트의 효율성 및 효과성 평가)

  • Park, Sung-Min;Kim, Heon;Baek, Dong-Hyun
    • IE interfaces
    • /
    • v.22 no.3
    • /
    • pp.192-204
    • /
    • 2009
  • Based on the characteristics of 'Korean electric power industry R&D programs', this study proposes a new performance evaluation framework where electric power industry related R&D projects are scrutinized. The abovementioned R&D programs have their own goals and especially they emphasize the effectiveness as well as the efficiency of each subordinate R&D project. Hence, in this framework, a performance evaluation procedure is established and then a mathematical model is developed according to the procedure. The model calculates performance evaluation indices for a set of R&D projects integrating the effectiveness with the efficiency of each R&D project. In a case study with an empirical dataset, statistical significance is tested on the integrated performance evaluation indices of R&D projects regarding organizational types and program categories considered.

Project Selection & Evaluation System Design and Implementation-Literature Review and Case Study- (연구과제 선정.평가 체계설계에 관한 연구)

  • 용세중;최덕출;한종우;정용훈;이원영
    • Journal of Technology Innovation
    • /
    • v.2 no.1
    • /
    • pp.116-141
    • /
    • 1994
  • This paper presents a model for R&D project selection and evaluation system design developed through literature review. The model emphasizes the fitness between the five elements of the system : evaluation phase and purpose, personnel and organization, evaluation critiria and decision model, evaluation form and procedure, and projects. The model was applied in real situation as a test case. The important findings are that a good project selection and evaluation model contributes only partially to the effectiveness of the project selection and that system development and implementation activity is a dynamic and multi-facetted learning process.

  • PDF

A Study on the Development and Application of Performance Evaluation Model for Defense Standard Improvement Projects (국방규격 개선사업의 성과평가모형 개발 및 적용방안 연구)

  • Lee, Min Cheol;Kim, Young Hyun;Ahn, Young Jun;Kim, Jun Su
    • Journal of Korean Society for Quality Management
    • /
    • v.51 no.2
    • /
    • pp.185-202
    • /
    • 2023
  • Purpose: The purpose of this study is to identify key performance evaluation items and factors that are effective and practical for project management of defense standard standard improvement projects, and to develop a quantitative performance evaluation model. Methods: For the development of a performance evaluation model for defense standard improvement projects, we analyzed past major project performance and derived evaluation items and factors. To increase the objectivity and efficiency of project evaluation, we developed an evaluation index that enables relative evaluation of evaluation targets, and calculated the main importance of evaluation items using the Analytic Hierarchy Process (AHP) method based on the main opinions of expert groups. Results: The study resulted in the identification of main performance items for defense standard improvement projects, which were classified into defense standard conformity review performance and defense standard improvement performance items. We also simplified the evaluation model by integrating various evaluation items into similar evaluation factors. Additionally, we developed a quantitative evaluation index that enables relative evaluation of the targets and verified the objectivity and validity of the suggested performance evaluation model by reevaluating it using performance data from past commissioned professional institutions Conclusion: Developing a quantitative evaluation model for defense standard improvement projects is expected to provide a means of measuring the effectiveness of the project, and to be used as a tool to determine the appropriateness and effectiveness of medium and long-term project plans.

An Economic Analysis of the Marine Afforestation Project in Gangneung Region, Republic of Korea (바다숲 조성사업의 경제적 효과 분석 : 강릉 주문진 바다숲 조성사업을 대상으로)

  • PARK, Kyung-Il;HONG, Hye-Su;KIM, Do-Hoon
    • Journal of Fisheries and Marine Sciences Education
    • /
    • v.28 no.3
    • /
    • pp.727-737
    • /
    • 2016
  • This study is aimed to analyze the economic effectiveness (direct fishing income effect) of the marine afforestation project in Gangneung region. Based on the surveyed data, the production values and costs of the marine afforestation project are estimated and compared to determine the economic validity of the marine afforestation project. Results show that the B/C ratio, as an indicator of economic evaluation, is 1.30 with an interest rate of 5.5%, indicating that the marine afforestation project in Gangneung region would be economically feasible under the current production and market conditions. However, it is expected that the economic effectiveness would be increased when considering benefits of recreational fishing and greenhouse gas reduction from the marine afforestation project.

Aid Effectiveness in Practice: A Case Study on the National Data Center in Mongolia

  • Hong, Sung Gul;Lee, Sang Joon
    • Journal of Service Research and Studies
    • /
    • v.3 no.2
    • /
    • pp.1-17
    • /
    • 2013
  • The main purpose of this paper is to examine the aid effectiveness of ODA projects through a case of an e-Government ODA. The case at hand is the Mongolian National Data Center project, which was supported by Korea International Cooperation Agency in 2007~2009. In this paper, we analyze aid effectiveness through a case instead of a long-term macroeconomic analysis. By using OECD DAC guideline for performance evaluation of ODA project combined with PRM (Performance Reference Model) for evaluating e-Government, authors undertakes a post-implementation evaluation on the Mongolian NDC project. The result shows that the NDC project has been relevant and implemented effectively and efficiently given the political instability incurred by the election fraud in 2008. However, there have been problems as well. Provision of defected monitors was a critical problem while disagreement on the safety of the building was lasted for two more years to be settled. Some comments on the training program are also worth to hear to ameliorate similar projects. But more fundamental problems are found in impacts and sustainability areas. Low political status of ICTPA as a coordinating organization for ICT ODA and unstable job security of NDC are serious hurdles to increase effectiveness and efficiency of NDC. ICTPA has played very limited roles in coordinating government-wide ICT ODA projects because it lacks actual power and control over them. Other government organizations do not fully trust NDC as a reliable government data center due to low political status and lack of job security. Thus critical factors to affect the effectiveness and efficiency of e-Government ODA projects are political and organizational instead of economic.

  • PDF

Evaluation of the ODA Forest Cooperation Projects in Korea through Stakeholder and Visitor Survey - A Case Study of the Rumpin Seed Source and Nursery Center Projects in Indonesia - (이해관계자와 이용객 설문 조사를 통한 국내 ODA 산림협력사업 평가 연구 - 인도네시아 룸핀양묘장 사업을 대상으로 -)

  • Lee, Hyun-Jung;Kim, Whee-Moon;Kim, Kyeong-Tae;Kim, Young;Choi, Jae-Yong;Song, Won-Kyong
    • Journal of the Korean Society of Environmental Restoration Technology
    • /
    • v.24 no.2
    • /
    • pp.19-37
    • /
    • 2021
  • It is essential that the evaluation of official development assistance (ODA) projects is conducted based on empirical research for the performance and improvement of the project. This study intended to quantitatively figure out the actual status and performance of ODA projects. The performance of the Rumpin Seed Source and Nursery Center project implemented by the KOICA was evaluated in items of relevance, efficiency, effectiveness, impact, sustainability, which are OECD Development Assistance Committee(DAC) evaluation criteria. From August 26, 2019 to August 29, 2019, a survey was conducted on 50 visitors and 54 stakeholders of the Rumpin Seed Source and Nursery Center. Through on-site survey, problems in the donation project and operation in Indonesia were identified and measures for improvement was grasped. As a result of the study, the value scored by OECD DAC evaluation criteria of the Rumpin Seed Source and Nursery Center project based on the Economic Development Cooperation Fund(EDCF) evaluation grade was evaluated as a very successful class in all items. The average score of the recognition question was 4.08 points for visitors and 4.08 points for stakeholders, and the average score for the satisfaction question was 4.37 points for visitors and 4.11 points for stakeholders, which were high overall in both groups. The main factor that affects the project awareness of the visitors was the fact that the Rumpin Seed Source and Nursery Center was created based on Korean technology, and it was confirmed that Indonesia's own items related to similar projects had a great influence on the project satisfaction. In the case of stakeholders, project support in Korea affected their recognition, and it was found that relevance, efficiency, effectiveness items had the greatest impact on the level of project satisfaction of stakeholders derived from the DAC individual evaluation results. Efforts are required to increase the main factors by reflecting the results of each item and to preserve and maintain the project. This study is significant in determining the performance of the ODA project based on empirical data, and it is believed that it can be used as basic data for supplementing and strengthening the project in the future.

A Evaluation System Integrating Cost-Cross Effects of Big Scale R&D Projects (R&D프로젝트군의 우선순위 결정을 위한 비용 - 상호효과 통합평가시스템)

  • Kwon, Cheol-Shin;Lee, Soon-Cheon;Park, Jooh-Ho
    • Journal of the Korean Operations Research and Management Science Society
    • /
    • v.32 no.2
    • /
    • pp.163-175
    • /
    • 2007
  • [ $ulcorner$ ]Cost-Effectiveness Analysis$\lrcorner$ has been wifely used to evaluate economic efficiency of R&D projects, but most of cost-effectiveness evaluation systems have some problems such as systematic method for setting and evaluating cost factors, estimation of single effect on each R&D project, and estimation of cross effects among R&D projects. To solve these problems, we have designed a new evaluation indicator called a $ulcorner$Cost-Cross Effect Integration Indicator$lrcorner$ including cross effects developed in this research. The major research findings are summarized as follows : (1) $ulcorner$Coist Estimation Model$lrcorner$, which estimates the cost factors divided into two classes of assembly product and system product and then integrates the total cost values, has been designed. (2) A new method for estimating parameters of cross effects among R&D projects has been developed. (3) $ulcorner$Cross Effects Estimation Model$lrcorner$ to estimate multi-effects and cross effects by completion time among several projects has been designed. (4) $ulcorner$Integration Estimation Indicator$lrcorner$ for setting priority on a project group has been extracted by combination of total cost value and total effect value.

Development of An Evaluation Index for Intermediate Outcomes from Rural Village Development Project (농촌마을종합개발사업의 중간결과 평가지표 설정)

  • Kim, Hyeon-Soo;Kim, Kyung-Ryang;Choi, Youn-Sang;Jung, Hae-Dong;Jun, Taek-Ki;Hong, Chan-Sun
    • Proceedings of the Korean Society of Agricultural Engineers Conference
    • /
    • 2005.10a
    • /
    • pp.429-435
    • /
    • 2005
  • This study attempts to develop indices in order to make an objective and effective evaluation of achievements in the first stage of operation of the Rural Village Development Project(RVDP) (the first 3 years of its operation). The results are as follows 1. Evaluation purposes are expansion of income-generating bases, improvement of living environments, strengthening of village's competence and establishment of an effective project's management system. 2. Evaluation items for the first three evaluation purposes, which are income-generating bases, improvement of living environments and strengthening of village's competence, are record of performance and substantiality in project's operation, results from operation, and capability in managing the project. Those for establishment of an effective project's management system are participation of habitants and the projects's management system. 3. As this study aims to develop the indices which can evaluate the state of operation in the interim of the project's operation and outcomes generated by then, the evaluation indices are selected by considering those criterions of representativeness, accessibility, usefulness and reliability. 4. As the indices developed in this study efficiency evaluate the process of project's operation and thus evaluate basically the project's operation on the basis of its efficiency. But, considering the purposes of the RVDP, it is included for the overall project's management system and plans for managing activities of the project to be evaluated on the basis of effectiveness.

  • PDF

COMPARISON OF THREE PCM PERFORMANCE EVALUATION SYSTEMS IN TAIWAN

  • Wen-der Yu ;Yen-ping Hsu
    • International conference on construction engineering and project management
    • /
    • 2005.10a
    • /
    • pp.719-724
    • /
    • 2005
  • It has been debating on the performance evaluation of professional construction management (PCM) services since its introduction to Taiwan's construction industry more than a decade ago. Several evaluation systems were proposed by previous researchers. However, there has no comparison study been conducted for the feasibility, effectiveness, and appropriateness of these systems to the performance management (PM) of practical PCM services. This paper is intended for this end to compare the existing PCM performance evaluation systems in Taiwan. A real world design/build (D/B) building project was selected for case study. The result of case study concludes and compares the pro's and con's of the three systems. At the end, it recommends strategies for selecting the most appropriate PCM performance evaluation for PCM services.

  • PDF