An Empirical Study on the Cost Behavior in Coastal Fishery (연안어선어업 피해율 산정을 위한 원가행태에 관한 실증연구)

  • Kim, Woo-Soo;Kim, Kil-Yong
    • The Journal of Fisheries Business Administration
    • /
    • v.42 no.3
    • /
    • pp.1-13
    • /
    • 2011
  • It is necessary to set up a standard of estimation for annual unit price of sale and cost, damage rate for calculating compensation against fishery damage objectively. Two items on the unit price and cost have regulations but the damage rate has not, so it may occurred some problems such as reasonability and balance because the estimation should be handling by an appraiser's knowledge and experience. This study has analyzed using Regression model and searched variable costs and fixed costs about each items appraisers to operate in the present. It is compare profit damage index is calculated by an estimated model and an appraised example. This analysis showed highly 23-30% estimated model more than appraised example. It means the overestimation for fishery damage. This difference has caused by limited data, lack of sample, much difference in the standard deviation, and has not classified each kind of business and weight of coastal fishery, the overestimation more than what expected. This study has analyzed that the applied rate of fixed and variable cost in relation to the compensation in the cost of coastal fishery is very valuable.

The Estimation on Switching Technique via Output Power Source Analysis of Power Conversion System in an Electric Railway Vehicle (철도차량내의 전력변환장치 출력전원 분석을 통한 스위칭 기법 추정)

  • Kim, Jae-Moon;Lee, Eul-Jae;Yun, Cha-Jung;Kim, Yang-Su
    • The Transactions of the Korean Institute of Electrical Engineers P
    • /
    • v.59 no.2
    • /
    • pp.185-190
    • /
    • 2010
  • This paper presents the estimation on switching technique via output power source analysis of power conversion unit in electric railway vehicle. The focus of this study suggested an alternative on critical problems by using head electric power(HEP). To achieve this, we have measured output power of HEP, and measurement devices set up at output of transformer connected HEP to analysis quality on output power source of head electric power(HEP) unit in electric railway vehicle. Using results of measurement of it, parameters are assumed for simulation to confirm estimation on switching technique. It is confirmed that switching technique is Selected Harmonic Elimination PWM(SHEPWM) and inverter switching frequency is less than 500[Hz]. Throughout experiment and simulation, it is estimated that switching technique used HEP is advanced SHEPWM and switching frequency is about 300[Hz]. Also leakage inductance in transformer is about $180[{\mu}H]$ less than $365[{\mu}H]$ known.

M/G/1 Queueing Model for the Performance Estimation of AS/RS (자동창고시스템의 성능평가를 위한 M/G/1 대기모형)

  • Lim, Si-Yeong;Hur, Sun;Lee, Moon-Hwan;Lee, Young-Hae
    • Journal of Korean Institute of Industrial Engineers
    • /
    • v.27 no.1
    • /
    • pp.111-117
    • /
    • 2001
  • Most of the techniques for the performance estimation of unit-load AS/RS are a static model or computer simulation. Especially, their models have been developed under the assumption that the Storage/Retrieval (S/R) machine performs either single command(SC) or dual command(DC) only. In reality, depending on the operating policy and the status of the system at a particular time, the S/R machine performs a SC or a DC, or becomes idle. In order to resolve this weak point, we propose a stochastic model for the performance estimation of unit-load ASIRS by using a M/G/1 queueing model with a single server and two queues. Server utilization, expected numbers of waiting storage and retrieval commands and mean time spent in queue and system are found.

  • PDF

Estimation of Rotational Motion Accuracy for Rotary Units (회전 유니트의 회전정밀도 예측 기술)

  • Hwang, Jooho;Shim, Jongyoup;Park, Chun-Hong
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.32 no.2
    • /
    • pp.127-133
    • /
    • 2015
  • The error motion of a machine tool spindle directly affects the surface errors of machined parts. Those are usually due to the imperfectness of bearings, stiffness of spindle, assembly errors, external force or unbalance of rotors. The error motions of the spindle have been needed to be decreased to desired goal of spindle's performance. The level of error motion is needed to be estimated during the design and assembly process of the spindle. In this paper, the estimation method for the five degree of freedom (5 D.O.F) error motions for rotary units such as a spindle and rotary table are suggested. To estimate the error motions of the rotary unit, waviness of bearings and external force model were used as input data. The estimation model considers geometric relationship and force equilibrium of the five degree of the freedom motions.

Estimation of Vehicle Position and Orientation on Magnetic Lane Using 3-axis Magnetic Sensor (3축 자기센서를 이용한 자기차선상의 차량위치 및 방향 추정)

  • Ryoo, Young-Jae
    • Journal of Sensor Science and Technology
    • /
    • v.9 no.5
    • /
    • pp.373-379
    • /
    • 2000
  • In this paper, an estimation system of vehicle position and orientation on magnetic lane, which is a parameter of the steering controller for automated lane following is described. To verify that the magnetic dipole model could be applied to a magnetic unit paved in roadway, the analysis of the model is compared with the data of 3-axis magnetic field measured experimentally. The sensor location could be estimated by analysis of the model based on experimental data. For the magnetic lane model merged magnetic unit, the relation of sensor location and magnetic field is acquired experimentally. The proposed estimation of vehicle position and orientation is adopted to automated lane following by computer simulation.

  • PDF

Analysis of Cost Estimate Method Based on Engineering 3D Model for Nuclear Power Plant Construction Project (엔지니어링 3D모델 기반 원전 건설사업비 산정방안 분석)

  • Lee, Sang-Hyun
    • Proceedings of the Korean Institute of Building Construction Conference
    • /
    • 2018.05a
    • /
    • pp.294-295
    • /
    • 2018
  • Nowadays, the construction industry utilizes 3D models in the designing process, on which research is being conducted to establish an automated system for project cost estimation in connection with information related to construction such as material unit costs and wages, beyond the level of design interference review and construction quantity estimation. In this process, the project cost is estimated in connection with unit price data after takeoff the quantity based on the 3D model attributes and data types. A way to reduce cost and risk would be first developing prototypes of some of essential buildings and works, comparing and validating the outcomes, and then extending to the whole scope, because estimates differ on the basis of the scope and level of 3D design models as well as the data accuracy. This study analyzes case studies of project cost estimation by computing the quantity on the basis of 3D model in the construction industry and explores methodologies and management measures applicable for estimating nuclear power plant construction project costs.

  • PDF

Estimation model of shear strength of soil layer using linear regression analysis (선형회귀분석에 의한 토층의 전단강도 산정모델)

  • Lee, Moon-Se;Kim, Kyeong-Su
    • Proceedings of the Korean Geotechical Society Conference
    • /
    • 2009.09a
    • /
    • pp.1065-1078
    • /
    • 2009
  • The shear strength has been managed as an important factor in soil mechanics. The shear strength estimation model was developed to evaluate the shear strength using only a few soil properties by the linear regression analysis model which is one of the statistical methods. The shear strength is divided into two part; one is the internal friction angle ($\Phi$) and the other is the cohesion (c). Therefore, some valid soil factors among the results of soil tests are selected through the correlation analysis using SPSS and then the model are formulated by the linear regression analysis based on the relationship between factors. Also, the developed model is compared with the result of direct shear test to prove the rationality of model. As the results of analysis about relationship between soil properties and shear strength, the internal friction angle is highly influenced by the void ratio and the dry unit weight and the cohesion is mainly influenced by the void ratio, the dry unit weight and the plastic index. Meanwhile, the shear strength estimated by the developed model is similar with that of the direct shear test. Therefore, the developed model may be used to estimate the shear strength of soils in the same condition of study area.

  • PDF

A Performance Index for Time Slot Allocation in Link-16 Relative Navigation System

  • Lee, Jin Hyuk;Lee, Ju Hyun;Noh, Jae Hee;Lim, Deok Won;Park, Chansik;Lee, Sang Jeong
    • Journal of Positioning, Navigation, and Timing
    • /
    • v.6 no.3
    • /
    • pp.117-123
    • /
    • 2017
  • In this paper, we propose a performance index that can compare the position estimation performance according to the time slot allocation order, which is superior in the position estimation performance in the operation of the Link-16 based relative navigation system. In order to verify the validity of the performance index, a software-based Link-16 relative navigation system performance analysis platform composed of a signal generator, a signal reception and navigation algorithm execution unit, and a performance analysis unit was designed. Using the designed software platform, we analyzed the relationship between proposed performance index and position estimation performance according to time slot allocation order in the same position reference (PR) arrangement. The performance index of the proposed time slot allocation is expected to be utilized not only for the Link-16 system, but also for the Time Division Multiple Access (TDMA)-based navigation system.

A VLSI Architecture for Fast Motion Estimation Algorithm (고속 움직임 추정 알고리즘에 적합한 VLSI 구조 연구)

  • 이재헌;나종범
    • Journal of Broadcast Engineering
    • /
    • v.3 no.1
    • /
    • pp.85-92
    • /
    • 1998
  • The block matching algorithm is the most popular motion estimation method in image sequence coding. In this paper, we propose a VLSI architecture. for implementing a recently proposed fast bolck matching algorith, which uses spatial correlation of motion vectors and hierarchical searching scheme. The proposed architecture consists of a basic searching unit based on a systolic array and two shift register arrays. And it covers a search range of -32~ +31. By using the basic searching unit repeatedly, it reduces the number of gatyes for implementation. For basic searching unit implementation, a proper systolic array can be selected among various conventional ones by trading-off between speed and hardware cost. In this paper, a structure is selected as the basic searching unit so that the hardware cost can be minimized. The proposed overall architecture is fast enough for low bit-rate applications (frame size of $352{\times}288$, 3Oframes/sec) and can be implemented by less than 20,000 gates. Moreover, by simply modifying the basic searching unit, the architecture can be used for the higher bit-rate application of the frame size of $720{\times}480$ and 30 frames/sec.

  • PDF

Calculation of Basic Unit of Carbon Emissions in Construction Stage of the Road Infrastructure (도로시설물의 전과정 탄소배출량 산정을 위한 시공단계 탄소배출원단위 구축)

  • Kwak, In-Ho;Kim, Kun-Ho;Cho, Woo-Hyoung;Park, Kwang-Ho;Hwang, Young-Woo
    • Journal of Korean Society of Environmental Engineers
    • /
    • v.37 no.2
    • /
    • pp.107-112
    • /
    • 2015
  • Carbon emissions in construction stage is very high because lots of construction machines and materials are required to be used at a road construction stage. Many researcher carried out application of carbon emissions estimation methodology during the life cycle of road infrastructure in order to reduce greenhouse gas emissions in the road sector. But the calculation of carbon emissions is difficult because data collection is difficult and calculation procedure is complex. In this study, a basic unit of carbon emissions in construction stage of the road infrastructure was developed in order to get the quantitative determination of carbon that occurs. Carbon emissions of the expressway and common state road was calculated by using the basic unit of carbon emissions and application plan of basic unit of carbon emissions are presented.