• Title/Summary/Keyword: Establishment cost

Search Result 537, Processing Time 0.026 seconds

Mesh Network Implementation using DWDS-based Link Layer Routing (DWDS 기반의 링크 계층 라우팅을 통한 메쉬 네트워크 구현)

  • Yoon, Mi-Kyung;Yang, Seung-Chur;Kim, Jong-Deok
    • The Journal of Korean Institute of Communications and Information Sciences
    • /
    • v.35 no.2A
    • /
    • pp.165-173
    • /
    • 2010
  • WMN(Wireless Mesh Network) is an wireless backbone network technology that is an easily configurable network in the low cost compared to the wireless LAN(Local Area Network). Most of the previous researches have evaluated their algorithms by the simulations rather than by the implementation. There exist some implementation papers, however, they have the limitations of the flexibility on the link establishment and the link quality utilization. Consequently, the benefit of the WMN - configuration flexibility is degraded and the performance deterioration occurs in the multi-hop wireless environment. In this paper, we introduce a Linux-based link layer Wireless Mesh Routing System - WBMR. The design and implementation of WBMR provides the dynamic link establishment and the effective multi-channel usage. We have modified the ntroof the original WLAN operation for the dynamic link establishment, and the Linux bridge for the link layer routing. The result of performance evaluation verifies that our WBMR supports fast self-configuration and increases data transmission throughput compared to the other researches of the wireless multi-hop environment.

Foundation Establishment of Professional Evaluation Center for Convergence of Energy Storage System (ESS) (에너지저장장치(ESS) 융복합 전문평가센터 기반구축)

  • Yoon, Yongho
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.20 no.4
    • /
    • pp.165-170
    • /
    • 2020
  • In the rapidly growing new and renewable ESS parts and materials market, there is a limit for domestic SMEs to cope with the rapidly changing global new and renewable ESS market. There is a growing need to build a new and renewable ESS convergence commercialization support center. Therefore, through the establishment of a new and renewable ESS convergence professional evaluation center base, performance evaluation and standardization of new and renewable ESS products enhance product reliability. And By securing the reliability of new and renewable ESS, it is possible to promote domestic supply business and export activation. In addition, by supporting domestic research institutes and manufacturers to enhance their development capabilities and strengthen their competitiveness, and shortening the test cost and testing period according to the total-test evaluation system, it is possible anti-spill effect can be expected. Therefore, in this paper, we intend to study the establishment of a test certification center beyond the level of developed countries that can establish standardization for performance evaluation and demonstration.

The Effects of Water Level and Temperature on Seed Germination and Early Seedling Development of Rice (Oryza sativa I.)

  • Thang La;Seo-Yeong Yang;Hyeon-Seok Lee;Chung-Gun Lee;Myeong-Gue Choi;Woon-Ha Hwang
    • Proceedings of the Korean Society of Crop Science Conference
    • /
    • 2022.10a
    • /
    • pp.132-132
    • /
    • 2022
  • The application of direct seeding cultivation reduces time, labor, and cost. However, this application often has poor seedling establishment and leads to lower yield as compared to transplanting system. The tolerance to anaerobic and low temperature germination is important to improve seedling establishment and the wide-spread application of direct seeding method. This study was carried out to evaluate the responses of three japonica cultivars to different temperatures (15℃, 18℃, 21℃, 24℃, and 27℃) and different flooding levels (1 cm, 4 cm, 7 cm, 10 cm) during germination and seedling development. The mean survival percentage significantly increased (P<0.05) when the flooding level decreased and when temperature increased. There were significant effects of the interaction between temperature and water depth on survival percentage and seedling height. When temperature decreased from 27℃ to 15℃, the germination duration significantly increased from 6.4 days to 16.3 days while the germination speed, survival percentage, and seedling height decreased from 5.3 seeds day-1, 61.9% and 190.6 cm to 2.2 seeds day-1, 33.2%, and 47 cm, respectively. The increase in temperature under submergence condition was associated with the increased expression of Amy3D and ALDH2a but the decreased expression of ADH1 and PDC1. The results of this research would be used for further studies and breeding programs to improve rice seedling establishment and the application of direct seeding cultivation.

  • PDF

Status of Nuclear Power Plant Decommissioning Cost Analysis in USA (미국의 원전해체 비용평가 기초자료 및 동향 분석)

  • Shin, Sanghwa;Kim, Soonyoung
    • Journal of the Korean Society of Radiology
    • /
    • v.12 no.2
    • /
    • pp.139-148
    • /
    • 2018
  • Assessment of NPP(Nuclear Power Plant) decommissioning cost is very important for safe decommissioning of nuclear power plants. In the United States, which has the most NPP decommissioning experience, the cost evaluation study has been conducted since the 1970s in order to decommissioning nuclear facilities. The US NRC has conducted studies on decommissioning technology, safety and cost for a variety of reactor type and nuclear installations. In the total decommissioning costs, the end of operation licenses accounted for the largest portion, followed by spent fuel management and site restoration. In case of immediate decommissioning, spent fuel management cost increased compared to delayed decommissioning, and delayed deocmmissioning increased the cost of terminating the operation license. However, in general, delayed decommissioning does not show any significant benefit as compared with immediate decommissioning. It is necessary to consider the evaluation according to the site conditions when evaluating the cost of decommissioning domestic nuclear power plants. Also, in Korea, IAEA recommendations were applied to reorganize the radioactive waste classification system. Therefore, it is necessary to develop a method to appropriately use the decommissioning data of the preceding US Nuclear Power Plant in the new classification system when estimating the amount of radioactive waste generated during decommissioning. In particular, the establishment of the evaluation methodology for the waste to be disposed of will be an important factor in securing the accuracy of the decommissioning cost. In addition, it is necessary to construct information data that can be applied to facility characteristics and work characteristics in order to evaluate the cost of demolition of domestic nuclear power plants.

BIM-Based Quantity Takeoff and Cost Estimation Guidelines for Reinforced Concrete Structures (철근콘크리트골조 BIM기반 수량산출 및 견적 가이드라인 수립)

  • Joo, Seon U;Kim, Chee-Kyeong;Kim, Si-Uk;Noh, Jun-Oh
    • Journal of the Computational Structural Engineering Institute of Korea
    • /
    • v.30 no.6
    • /
    • pp.567-576
    • /
    • 2017
  • The object of this research is an establishment of BIM-based quantity takeoff(QTO) and cost estimation guidelines for reinforcement concrete structures focused on improvement of field applicability in transition period from 2D drawing-based environment to 3D BIM-based environment. Preliminary studies on existing guidelines and standards for BIM modeling, QTO and cost estimation of reinforcement concrete structures are performed, and then a standardization of BIM-based cost estimation process is proposed through comparative analysis between 2D drawing-based cost estimation process and 3D BIM-based. In addition, modeling, QTO, and cost estimation processes of cost-BIM model for RC structures are conducted. The contributions of this research and the guidelines suggested by this research are 1) lowering barriers to entity to the new BIM-based environment for small size companies, 2) reducing construction cost by a close estimate, 3) establishing the foundation for integrated management of informations through construction project life cycle, 4) and ultimately, developing the BIM ecosystems.

A Study on the Prediction of the Construction Cost in Planning Stage of Local Housing Union Project (지역주택조합사업 기획단계의 공사비 예측에 관한 연구)

  • Lee, Jin-Kyu
    • Journal of the Korea Academia-Industrial cooperation Society
    • /
    • v.19 no.12
    • /
    • pp.653-659
    • /
    • 2018
  • The accurate prediction of construction cost is a key factor in a project's success. However, it is hard to predict the construction costs in the planning stages rapidly and precisely when drawings, specifications, construction cost calculation statements are incomplete, among other factors. Accurate construction-cost prediction in the planning stage of a project is also important for project feasibility studies and successful completion. Therefore, various techniques have been applied to accurately predict construction costs at an early stage when project information is limited. There are many factors that affect the construction cost prediction. This paper presents a construction-cost prediction method as multiple regression model with seven construction factors as independent variables. The method was used to predict the construction cost of a local housing union project, and the error rate was 4.87%. It is not possible to compare the cost of the project at the planning stage of the local housing union project, but it has high prediction accuracy compared to the unit price of an existing unit area. It is likely to be applied in construction-cost calculation work and to contribute to the establishment of the budget for the local housing union project.

Establishment of WBS·CBS-based Construction Information Classification System for Efficient Construction Cost Analysis and Prediction of High-tech Facilities (하이테크 공장의 효율적 건설 사업비 분석 및 예측을 위한 WBS·CBS 기반 건설정보 분류체계 구축)

  • Choi, Seong Hoon;Kim, Jinchul;Kwon, Soonwook
    • The Journal of the Korea Contents Association
    • /
    • v.21 no.8
    • /
    • pp.356-366
    • /
    • 2021
  • The high-tech industry, a leader in the national economy, has a larger investment cost compared to general buildings, a shorter construction period, and requires continuous investment. Therefore, accurate construction cost prediction and quick decision-making are important factors for efficient cost and process management. Overseas, the construction information classification system has been standardized since 1980 and has been continuously developed, improving construction productivity by systematically collecting and utilizing project life cycle information. At domestic construction sites, attempts have been made to standardize the classification system of construction information, but it is difficult to achieve continuous standardization and systematization due to the absence of a standardization body and differences in cost and process management methods for each construction company. Particular, in the case of the high-tech industry, the standardization and systematization level of the construction information classification system for high-tech facility construction is very low due to problems such as large scale, numerous types of work, complex construction and security. Therefore, the purpose of this study is to construct a construction information classification system suitable for high-tech facility construction through collection, classification, and analysis of related project data constructed in Korea. Based on the WBS (Work Breakdown Structure) and CBS (Cost Breakdown Structure) classified and analyzed through this study, a code system through hierarchical classification was proposed, and the cost model of buildings by linking WBS and CBS was three-dimensionalized and the utilized method was presented. Through this, an information classification system based on inter-relationships can be developed beyond the one-way tree structure, which is a general construction information classification system, and effects such as shortening of construction period and cost reduction will be maximized.

Comparison of Construction Cost Applied by RC and PC Construction Method for Apartment House and Establishment of OSC Economic Analysis Framework (공동주택 RC 및 PC공법 적용 공사비 비교 및 OSC의 포괄적 경제성 분석 프레임워크 구축)

  • Yun, Won-Gun;Bae, Byung-Yun;Kang, Tai-Kyung
    • Korean Journal of Construction Engineering and Management
    • /
    • v.23 no.6
    • /
    • pp.30-42
    • /
    • 2022
  • OSC is a type of supply chain and value chain that spans the entire process of construction production (planning, design, construction, maintenance, etc.). It is a method of producing the final object by manufacturing it in a factory, transporting it to the site, installing and construction. This research as is the construction cost was compared for each case A, which applied the PC method, and case B, which applied the RC method. In the case of applying the PC method (excluding the PC design cost), compared to the case where only the RC method was applied, the frame construction cost per unit quantity (m3) increased by about 70% (50% based on the total RC construction type). Of the total frame construction cost of PC method application, PC accounted for 90.2%, 'PC manufacturing cost' 54.8%, 'PC assembly cost' 28.5%, and 'transportation cost' accounted for 6.89%. Also a decision-making framework that can consider both costs and benefits was established. In the case of benefits, the construction period, defect repair, disaster occurrence, energy efficiency, noise/dust/waste, and greenhouse gas emission indicators reflecting OSC technical advantages were presented. It can contribute to providing a basis for helping decision-making on the introduction of PC apartment houses using OSC.

A Study on Establishment of the Directions of Granting Incentives by Long-life Housing-related parties (장수명 주택 관계자별 인센티브 부여 방향 설정에 관한 연구)

  • Kim, Eun-Young;Jang, Soon-Gak;Hwang, Eun-Kyoung
    • Korean Institute of Interior Design Journal
    • /
    • v.25 no.1
    • /
    • pp.93-100
    • /
    • 2016
  • Long-life housing means a housing which structural members (Support) such as columns and floor are maintained for a long period of time and the housing can be used for approximately 100 years by replacing components (Infill) such as walls and furniture. The government established "Certification standards of long-life housing construction" on December 24, 2014, requiring the long-life housing certification for construction of apartment houses for over 1,000 households. However, it is necessary to prepare an incentive measure which could be granted to construction related personnel and housing owners due to the effectiveness of such system and recognition that the initial construction cost of long-life housing is high. The purpose of this study is as follows. First, the reasons and necessity of long-life housing cost increase for each construction company, housing owner, infill component manufacturer and designer which are long-life housing related personnel are determined. The direction of incentive grant for supplying long-life housing based on the determined items is established. The result of this study is as follows. First, a special treatment which is higher than the alleviation of construction standards according to the previous ordinance is necessary for construction companies to secure the business feasibility. Also, incentives such as the provision of service space and wide balcony are necessary to improve the preference level of parceling out. Second, financial incentives such as financial support for housing purchase, reduction and exemption of tax (acquisition tax and registration tax), and support of maintenance cost are required for house owners. Third, it is essential to increase opportunities to participate in the market for infill component manufacturers by applying additional points for PQ. Fourth, it is needed to provide compensation for additional human resource and time at the time of designing to designers by preparing the long-life housing design cost standards.

A Study on Factors Affecting Vender's Continuous Use Intention in O2O Delivery App Platform Service (O2O 배달 앱 플랫폼 서비스에서 공급 업체의 지속이용의도에 영향을 미치는 요인에 관한 연구)

  • Lee, Jae Kwang;Choi, Youngwoo;Lim, Eunju;Kim, Yoomin;Ahan, Saerom;Kim, Minjeong
    • Journal of Information Technology Services
    • /
    • v.20 no.2
    • /
    • pp.13-31
    • /
    • 2021
  • Recently, delivery app services based on the O2O platform are increasing rapidly. Accordingly, various studies on O2O service have been conducted. Most of the studies are on consumer behavior in O2O services, and few studies on platform vendors have been conducted. Therefore, this study empirically analyzed the factors affecting the vender's intention to continuous use in the O2O delivery app platform service. Based on prior researches, we set the quality characteristics and network characteristics of the O2O platform as independent variables. The quality characteristics of the O2O platform consisted of system quality, information quality, and service quality, and the O2O platform network characteristics consisted of network externality and platform reputation. Perceived value and switching cost were set as mediated variables, and vender's intention to continuous use was set as dependent variables. For empirical analysis, we conducted a survey targeting vendors of O2O delivery app platform service, and conducted frequency analysis, factor analysis, reliability analysis, and regression analysis. As a result of the analysis, the quality characteristics of the O2O platform, such as system quality, information quality, service quality, and O2O platform network characteristics, showed that network externality and platform reputation had a positive effect on perceived value. The perceived value was found to have a positive effect on the switching cost and the intention to continuous use, and the switching cost was found to mediate the perceived value and the intention to continuous use. This study can contribute to the establishment of platform operation strategy as an empirical analysis on the factors that influence the intention of O2O platform vendors to use the platform continuously.