Within the current construction industry, constractor equipment management practices lack structure and often are not addressed through an economic analysis and evaluation process. This paper explores two areas...cost of capital and inflation...with the intention of providing insight for a more structured and economic based approach to contractor equipment replacement practices rather than by the traditional "rule of thumb".umb".uot;.
Korean Journal of Construction Engineering and Management
/
v.25
no.1
/
pp.62-72
/
2024
Due to the distribution structure of domestic temporary equipment, quality control of temporary equipment is essential because more than 80% of temporary equipment is repeated and reused. Due to this importance, the Ministry of Land, Infrastructure and Transport has proposed quality management standards for temporary equipment for 10types of temporary equipments, including steel pipe support, but the overall quality of temporary eqipment cannot be confirmed because the quality is managed through sampling quality tests. In addition, although quality control standards exist for temporary material rental company, practical utilization was investigated and analyzed to be very low as they are mainly presented based on qualitative inspection standards by visual inspection. Therefore, the purpose of this study is to develop individual temporary material/quality/delivery management standards (Guides) for temporary equipment rental company to preemptively secure the quality of temporary equipment before bringing them into the construction site. If the standards developed through this study are applied to domestic temporary equipment rental companies, it is expected that high-quality temporary equipment with secured quality will be brought into the construction site as the quality of temporary equipment quality of domestic medium and small temporary equipment rental companies is improved safety accidents related to temporary structures.
Han, Young Jin;Yi, Do Yoon;Hong, Jun Pyo;Joo, Sung Ho;Kim, Gi Min;Park, Jaehun
Journal of Korean Society of Industrial and Systems Engineering
/
v.45
no.1
/
pp.83-90
/
2022
This study deals with replacement analysis of deteriorated equipment for improving productivity of production system. Frequent breakdown of the deteriorated equipment causes a situation that reduces productivity such as low product quality, process delay, and repair cost. However, the replacement of new equipment will be required a high initial investment cost, so it is important to analysis the economic feasibility. Therefore, we analyze the effect of the production system due to the aging effect of the equipment and the feasibility of equipment replacement based on the economic analysis. The process flow, working time, logistics movement, etc. are analyzed in order to build the simulation modeling for a ship and land switchboard production system. Using numerical examples, the economic feasibility analysis of equipment replacement through replacement of existing deteriorated equipment and additional arrangement of new facilities is performed.
Journal of the Korean Institute of Illuminating and Electrical Installation Engineers
/
v.23
no.3
/
pp.38-44
/
2009
This paper presents a new windows application based on 3-D graphics and Text-To-Speech (TTS) for effective management of substation equipment. When problems in a power system occur, inexperienced power system operators may have difficulty in understanding the situation as well as finding suitable countermeasures quickly. This paper addresses an effective scheme to visualizing power system equipment under normal and abnormal conditions using 3-D graphics and animations. In addition, the state variations and the order of maintenance priority of substation equipment are represented by TTS and intuitive methods. The proposed system can help power system operators to more quickly understand the state of power system equipment, and it can provide operators with the suitable countermeasures for minimizing damage caused by equipment problems.
International conference on construction engineering and project management
/
2020.12a
/
pp.179-187
/
2020
This paper investigates the construction equipment accidents by time. Construction sites are unique with many different hazardous conditions which cause accidents. According to the Occupational Safety and Health Administration (OSHA), accidents related to construction equipment are one of the most leading causes of fatal injuries in the construction industry. While there have been many studies investigating the equipment-related accidents, few research studies provided in-depth analyses about the time that accidents frequently occurred. By using the OSHA accidents data collected between 1997 and 2012, this paper analyzed the accidents data by time, equipment type including excavator, backhoe, dozer, and crane, accident cause, and injury class. The analyses revealed that the time window with most accidents was between 13:00 and 13:59. In terms of the injury class, the time windows with the highest numbers of equipment accidents were between 13:00 and 13:59 and between 11:00 and 11:59 for fatality and hospitalization, respectively. For the accident causes, equipment operator's error was the highest number of accident causes. It is expected that findings from the analyses can be used to more strategically develop management plans and guidelines to prevent accidents related to construction equipment to practitioners.
Korean Journal of Construction Engineering and Management
/
v.9
no.1
/
pp.55-65
/
2008
It is increasingly recognized that the construction equipment play an important role as resources in construction process. The number of registered construction equipment in korea is over 320,000 according to the statistics. It is obvious that the machine-intensive construction method achieves productivity and quality improvement as well as safety. The main objective of this paper is to propose improvement plans for construction equipment management system in terms of scope, registration, inspection, rental business, operating licenses, and etc., which are the major issues described in the Construction Equipment Management Law. In order to satisfy the objective, this research conduct survey and interview with experts, and literature review on domestic and overseas related laws and regulations. The results of the research are about 20 issues for improvement plans for the better management system, so the further in-depth study on each issue will be recommended for the practical application to the law.
PURPOSES: This study provides a methodology for estimating proper number of equipment for ordinary road management works. METHODS: Utilizing a computerized data of record systems (KAMIS) in 18 regional offices, two evaluation indicators were calculated and then normalized for objective comparison. Applied magnifying factor to the outputs, the proper number of equipment can be estimated. RESULTS: As a result, proper number of equipment by regional offices were required 28% more than current conditions. CONCLUSIONS: Using the proposed a methodology, fundamental data for scientific and reasonable strategies can be stored as well as be used for the future plan for budget allocation.
It is difficult for a superintendent or an operator of building service systems and equipment to decide the reasonable time for management of himself due to the shortage of his specialty for repair or replacement of a part of or whole equipment. But The reliable life expectancies for various building service equipment have not been prepared yet. This study shows the difference of optimal economic life and the decrease of running cost and energy consumption according to management level of the building equipment by the LCC analysis. The numerical model for building HVAC system was composed and analyses were performed for several parameters with management.
This paper presents a study on Fault History Management Equipment (FHME) of Unmanned Aerial Systems (UAS). UAS comprise of various types of electronic equipment for high reliability design for flight safety. Consequently, it is mandatory for each on-board equipment to have its own Built-In-Test (BIT) function, because rapid fault-detections for UAS are necessary. FHME is developed for the purposes of display, storage and management of such BIT results on ground. This paper describes the outline, development requirements, design and verification process of FHME.
Purpose: To attain advanced performance certification, safety aspects along with functionality and performance are essential. Hence, this study suggests radiation leakage assessment methods for aviation security equipment during its performance certification. Methods: Detection technology guided the choice of radiation leakage assessment targets. We then detailed measurement and evaluation methods based on equipment type and operation mode. Equipment was categorized as container or box types for establishing measurement procedures. Results: We've developed specific radiation leakage assessment procedures for different types of aviation security equipment, crucial for ensuring airport safety. Using these procedures allows efficient evaluation of compliance with radiation leakage standards. Conclusion: The suggested radiation leakage assessment method aims to enhance aviation security and reliability. Future research will focus on identifying risks in novel aviation security equipment detection technologies and establishing safety standards.
본 웹사이트에 게시된 이메일 주소가 전자우편 수집 프로그램이나
그 밖의 기술적 장치를 이용하여 무단으로 수집되는 것을 거부하며,
이를 위반시 정보통신망법에 의해 형사 처벌됨을 유념하시기 바랍니다.
[게시일 2004년 10월 1일]
이용약관
제 1 장 총칙
제 1 조 (목적)
이 이용약관은 KoreaScience 홈페이지(이하 “당 사이트”)에서 제공하는 인터넷 서비스(이하 '서비스')의 가입조건 및 이용에 관한 제반 사항과 기타 필요한 사항을 구체적으로 규정함을 목적으로 합니다.
제 2 조 (용어의 정의)
① "이용자"라 함은 당 사이트에 접속하여 이 약관에 따라 당 사이트가 제공하는 서비스를 받는 회원 및 비회원을
말합니다.
② "회원"이라 함은 서비스를 이용하기 위하여 당 사이트에 개인정보를 제공하여 아이디(ID)와 비밀번호를 부여
받은 자를 말합니다.
③ "회원 아이디(ID)"라 함은 회원의 식별 및 서비스 이용을 위하여 자신이 선정한 문자 및 숫자의 조합을
말합니다.
④ "비밀번호(패스워드)"라 함은 회원이 자신의 비밀보호를 위하여 선정한 문자 및 숫자의 조합을 말합니다.
제 3 조 (이용약관의 효력 및 변경)
① 이 약관은 당 사이트에 게시하거나 기타의 방법으로 회원에게 공지함으로써 효력이 발생합니다.
② 당 사이트는 이 약관을 개정할 경우에 적용일자 및 개정사유를 명시하여 현행 약관과 함께 당 사이트의
초기화면에 그 적용일자 7일 이전부터 적용일자 전일까지 공지합니다. 다만, 회원에게 불리하게 약관내용을
변경하는 경우에는 최소한 30일 이상의 사전 유예기간을 두고 공지합니다. 이 경우 당 사이트는 개정 전
내용과 개정 후 내용을 명확하게 비교하여 이용자가 알기 쉽도록 표시합니다.
제 4 조(약관 외 준칙)
① 이 약관은 당 사이트가 제공하는 서비스에 관한 이용안내와 함께 적용됩니다.
② 이 약관에 명시되지 아니한 사항은 관계법령의 규정이 적용됩니다.
제 2 장 이용계약의 체결
제 5 조 (이용계약의 성립 등)
① 이용계약은 이용고객이 당 사이트가 정한 약관에 「동의합니다」를 선택하고, 당 사이트가 정한
온라인신청양식을 작성하여 서비스 이용을 신청한 후, 당 사이트가 이를 승낙함으로써 성립합니다.
② 제1항의 승낙은 당 사이트가 제공하는 과학기술정보검색, 맞춤정보, 서지정보 등 다른 서비스의 이용승낙을
포함합니다.
제 6 조 (회원가입)
서비스를 이용하고자 하는 고객은 당 사이트에서 정한 회원가입양식에 개인정보를 기재하여 가입을 하여야 합니다.
제 7 조 (개인정보의 보호 및 사용)
당 사이트는 관계법령이 정하는 바에 따라 회원 등록정보를 포함한 회원의 개인정보를 보호하기 위해 노력합니다. 회원 개인정보의 보호 및 사용에 대해서는 관련법령 및 당 사이트의 개인정보 보호정책이 적용됩니다.
제 8 조 (이용 신청의 승낙과 제한)
① 당 사이트는 제6조의 규정에 의한 이용신청고객에 대하여 서비스 이용을 승낙합니다.
② 당 사이트는 아래사항에 해당하는 경우에 대해서 승낙하지 아니 합니다.
- 이용계약 신청서의 내용을 허위로 기재한 경우
- 기타 규정한 제반사항을 위반하며 신청하는 경우
제 9 조 (회원 ID 부여 및 변경 등)
① 당 사이트는 이용고객에 대하여 약관에 정하는 바에 따라 자신이 선정한 회원 ID를 부여합니다.
② 회원 ID는 원칙적으로 변경이 불가하며 부득이한 사유로 인하여 변경 하고자 하는 경우에는 해당 ID를
해지하고 재가입해야 합니다.
③ 기타 회원 개인정보 관리 및 변경 등에 관한 사항은 서비스별 안내에 정하는 바에 의합니다.
제 3 장 계약 당사자의 의무
제 10 조 (KISTI의 의무)
① 당 사이트는 이용고객이 희망한 서비스 제공 개시일에 특별한 사정이 없는 한 서비스를 이용할 수 있도록
하여야 합니다.
② 당 사이트는 개인정보 보호를 위해 보안시스템을 구축하며 개인정보 보호정책을 공시하고 준수합니다.
③ 당 사이트는 회원으로부터 제기되는 의견이나 불만이 정당하다고 객관적으로 인정될 경우에는 적절한 절차를
거쳐 즉시 처리하여야 합니다. 다만, 즉시 처리가 곤란한 경우는 회원에게 그 사유와 처리일정을 통보하여야
합니다.
제 11 조 (회원의 의무)
① 이용자는 회원가입 신청 또는 회원정보 변경 시 실명으로 모든 사항을 사실에 근거하여 작성하여야 하며,
허위 또는 타인의 정보를 등록할 경우 일체의 권리를 주장할 수 없습니다.
② 당 사이트가 관계법령 및 개인정보 보호정책에 의거하여 그 책임을 지는 경우를 제외하고 회원에게 부여된
ID의 비밀번호 관리소홀, 부정사용에 의하여 발생하는 모든 결과에 대한 책임은 회원에게 있습니다.
③ 회원은 당 사이트 및 제 3자의 지적 재산권을 침해해서는 안 됩니다.
제 4 장 서비스의 이용
제 12 조 (서비스 이용 시간)
① 서비스 이용은 당 사이트의 업무상 또는 기술상 특별한 지장이 없는 한 연중무휴, 1일 24시간 운영을
원칙으로 합니다. 단, 당 사이트는 시스템 정기점검, 증설 및 교체를 위해 당 사이트가 정한 날이나 시간에
서비스를 일시 중단할 수 있으며, 예정되어 있는 작업으로 인한 서비스 일시중단은 당 사이트 홈페이지를
통해 사전에 공지합니다.
② 당 사이트는 서비스를 특정범위로 분할하여 각 범위별로 이용가능시간을 별도로 지정할 수 있습니다. 다만
이 경우 그 내용을 공지합니다.
제 13 조 (홈페이지 저작권)
① NDSL에서 제공하는 모든 저작물의 저작권은 원저작자에게 있으며, KISTI는 복제/배포/전송권을 확보하고
있습니다.
② NDSL에서 제공하는 콘텐츠를 상업적 및 기타 영리목적으로 복제/배포/전송할 경우 사전에 KISTI의 허락을
받아야 합니다.
③ NDSL에서 제공하는 콘텐츠를 보도, 비평, 교육, 연구 등을 위하여 정당한 범위 안에서 공정한 관행에
합치되게 인용할 수 있습니다.
④ NDSL에서 제공하는 콘텐츠를 무단 복제, 전송, 배포 기타 저작권법에 위반되는 방법으로 이용할 경우
저작권법 제136조에 따라 5년 이하의 징역 또는 5천만 원 이하의 벌금에 처해질 수 있습니다.
제 14 조 (유료서비스)
① 당 사이트 및 협력기관이 정한 유료서비스(원문복사 등)는 별도로 정해진 바에 따르며, 변경사항은 시행 전에
당 사이트 홈페이지를 통하여 회원에게 공지합니다.
② 유료서비스를 이용하려는 회원은 정해진 요금체계에 따라 요금을 납부해야 합니다.
제 5 장 계약 해지 및 이용 제한
제 15 조 (계약 해지)
회원이 이용계약을 해지하고자 하는 때에는 [가입해지] 메뉴를 이용해 직접 해지해야 합니다.
제 16 조 (서비스 이용제한)
① 당 사이트는 회원이 서비스 이용내용에 있어서 본 약관 제 11조 내용을 위반하거나, 다음 각 호에 해당하는
경우 서비스 이용을 제한할 수 있습니다.
- 2년 이상 서비스를 이용한 적이 없는 경우
- 기타 정상적인 서비스 운영에 방해가 될 경우
② 상기 이용제한 규정에 따라 서비스를 이용하는 회원에게 서비스 이용에 대하여 별도 공지 없이 서비스 이용의
일시정지, 이용계약 해지 할 수 있습니다.
제 17 조 (전자우편주소 수집 금지)
회원은 전자우편주소 추출기 등을 이용하여 전자우편주소를 수집 또는 제3자에게 제공할 수 없습니다.
제 6 장 손해배상 및 기타사항
제 18 조 (손해배상)
당 사이트는 무료로 제공되는 서비스와 관련하여 회원에게 어떠한 손해가 발생하더라도 당 사이트가 고의 또는 과실로 인한 손해발생을 제외하고는 이에 대하여 책임을 부담하지 아니합니다.
제 19 조 (관할 법원)
서비스 이용으로 발생한 분쟁에 대해 소송이 제기되는 경우 민사 소송법상의 관할 법원에 제기합니다.
[부 칙]
1. (시행일) 이 약관은 2016년 9월 5일부터 적용되며, 종전 약관은 본 약관으로 대체되며, 개정된 약관의 적용일 이전 가입자도 개정된 약관의 적용을 받습니다.