• Title/Summary/Keyword: Engineering professionals

Search Result 369, Processing Time 0.023 seconds

Implement of Job Reinforcement System based on Google Cloud for Efficient Job Preparations and Self Ability Improvement (효율적인 취업 준비와 자기 능력 향상을 위한 구글 클라우드 기반의 취업 강화 시스템 구현)

  • Kang, Joo-hee;Yang, Byeong-ryeol;Jung, Se-hoon;Kim, Jong-chan;Park, Hong-joon;So, Won-ho;Sim, Chun-bo
    • Proceedings of the Korean Institute of Information and Commucation Sciences Conference
    • /
    • 2015.05a
    • /
    • pp.756-759
    • /
    • 2015
  • As the struggle to get a job becomes increasingly ferocious year after year, the website offering a range of employment information have continued to gain popularity. Those website, however, are not of much help when it comes to an interview to face the interviewer. Furthermore, many people suffer depression due to the heavy stress they are under while making preparations for employment or working for an organization. The current employment website do not have a team of professionals to deal with such issues. In an effort to solve those problems, the present study made arrangements to allow users to put in an enormous amount of employment information based on Google App Engine(GAE) and Google Web Toolkit(GWT) and upload interview videos. In addition, a Q&A board was created to help those who prepare for employment or current workers relieve their stress and provide them with access to a team of counseling professionals.

  • PDF

Evaluating Schedule Management Capability in Korean Construction Industry through Importance-Performance Analysis (IPA 방법을 활용한 국내 건설 산업 공정관리 역량 평가)

  • Lee, Jin Gang;Song, Bohyeon;Kim, Dain;Choi, Jaehyun
    • Journal of the Korea Institute of Building Construction
    • /
    • v.24 no.1
    • /
    • pp.145-156
    • /
    • 2024
  • In an era where construction projects are becoming increasingly large and complex, the Korean construction industry faces the challenge of implementing systematic and cohesive schedule management practices. This study initially delineates the concept of schedule management capabilities, systematically categorizing them into five distinct domains: law and regulations, requirements of project owners, capabilities of professionals and organizations, task capability, and the adoption of smart construction technologies for schedule management. Through a survey targeting industry professionals, this research assesses the perceived importance and the actual proficiency level in schedule management across these categories, employing an Importance Performance Analysis(IPA) to scrutinize these capabilities. The findings underscore the acknowledged significance of diverse aspects of schedule management, yet reveal discrepancies between the current proficiency levels and their perceived importance, pinpointing areas necessitating enhancement. Critical improvement needs identified encompass the planning of budgets for schedule management, development of regulations for assessing construction periods, deployment of specialized on-site staff for schedule management, and investment in advanced schedule management software solutions. Consequently, this study offers a nuanced analysis and strategic insights for enhancing schedule management practices, aiming to facilitate their effective implementation in the field.

An Empirical Study on the Bursting Properties According to Heat Treatment Condition of the CNG Pressure Vessel (CNG압력용기의 열처리 조건별 파열 특성에 관한 실증적 연구)

  • Kim, Eui Soo
    • Journal of the Korean Society of Safety
    • /
    • v.32 no.5
    • /
    • pp.1-7
    • /
    • 2017
  • Forensic Engineering is the art and science of professionals qualified to serve as engineering experts in courts of law or in arbitration proceedings. Buses using compressed natural gas (CNG) trend to be extended in use internationally as optimal counterplan for reducing discharge gas of light oil due to high concern about environment. However, CNG buses is equipped with composite pressure vessels (CPVs); since the CPVs contain compressed natural gas, the risks in the case of accident is very high. In this study, the bursting test for the pressure vessel depending on the heat treatment conditions of the vessel in which the actual ruptured accident occurred, after the bursting test, the fracture pattern analysis had performed. The mechanical materials properties test using Instrumented Indentation Test had performed to confirm the mechanical properties for each heat treatment cases. Also, the fractography analysis and metallographic analysis had performed to find out the difference of each heat treatment case. By comparing normal vessel with abnormal vessel which have defect of heat treatment conditions in term of the bursting patterns and characteristics of containers using various forensic engineering methods, especially, it is possible to understand how important the heat treatment process is in the high pressure vessel unlike any product.

Crack Detection in Tunnel Using Convolutional Encoder-Decoder Network (컨볼루셔널 인코더-디코더 네트워크를 이용한 터널에서의 균열 검출)

  • Han, Bok Gyu;Yang, Hyeon Seok;Lee, Jong Min;Moon, Young Shik
    • Journal of the Institute of Electronics and Information Engineers
    • /
    • v.54 no.6
    • /
    • pp.80-89
    • /
    • 2017
  • The classical approaches to detect cracks are performed by experienced inspection professionals by annotating the crack patterns manually. Because of each inspector's personal subjective experience, it is hard to guarantee objectiveness. To solve this issue, automated crack detection methods have been proposed however the methods are sensitive to image noise. Depending on the quality of image obtained, the image noise affect overall performance. In this paper, we propose crack detection method using a convolutional encoder-decoder network to overcome these weaknesses. Performance of which is significantly improved in terms of the recall, precision rate and F-measure than the previous methods.

Priority Decision Making on Healthcare Service Technology Standardization in the Home Network using AHP model (AHP모델을 이용한 홈 네트워크 헬스케어 서비스 기술표준화 우선순위 결정)

  • Lee, Kang-Dae;Kang, Un-Gu;Lee, Young-Ho;Park, Dong-Kyun
    • Journal of Korean Society of Industrial and Systems Engineering
    • /
    • v.30 no.4
    • /
    • pp.21-29
    • /
    • 2007
  • We derive priority decision making on healthcare service technology standardization in the home network through the decision support process with industry professionals. We configured a research group with 4 industrial areas including Industry, Academic, Research Institution and Medical Institution. And we also applied AHP methodology for the priority decision making. The research group decides an evaluation criteria which are consisted of marketability, technology, ripple effect, strategy for national policies in order to make a priority for healthcare service on a home network. And it is also decided 7 fields and 24 sub-fields, technically. In order to make a priority for the standardization, we use an AHP methodology, that is more objective and feasible, as a decision tool. After two-phase survey that consists of paper survey and face to face meeting, we get a conclusion that home healthcare content is at the top and then wireless home network follows it.

Critical Factors Affecting No-dispute Performance: A Case of Ethiopian Public Construction Projects

  • Sinesilassie, Ephrem Girma;Tabish, Syed Zafar Shahid;Jha, Kumar Neeraj
    • Journal of Construction Engineering and Project Management
    • /
    • v.6 no.4
    • /
    • pp.24-34
    • /
    • 2016
  • Disputes seem to be synonymous with large-scale construction projects in Ethiopia. The purpose of this study is to determine the factors responsible for impacting the performance of Ethiopian public construction projects. To this end, 35 success and failure attributes responsible for impacting the performance of the projects were identified and presented to Ethiopian construction professionals in the form of a structured questionnaire, and responses were collected. The factor analysis conducted on the success and failure attributes influencing no-dispute performance separately resulted in six success factors and five failure factors. Further analysis using stepwise multiple regression indicates that owner competence and interaction among project participants have a positive impact on no-dispute performance. However, conflict among project participants has a negative impact on the no-dispute performance of Ethiopian public construction projects. Although Ethiopia-specific, the results reflect construction management problems common to both developed and developing countries. The findings are expected to help researchers and practitioners gain a better understanding of critical success and failure factors and to help them take proactive measures to avoid disputes in public construction projects.

Better Management (Risk and Change) through NEC Contracts in Hong Kong

  • TUNG, Chu Hoi;MEMON, Shoeb Ahmed;JAVED, Arshad Ali
    • International conference on construction engineering and project management
    • /
    • 2020.12a
    • /
    • pp.323-330
    • /
    • 2020
  • Project delays, cost overruns, and disputes are becoming a norm for the construction industry in Hong Kong. Researchers argue that the inability of traditional contracts to manage risk and associated changes are perhaps the main points of contention. The Institution of Civil Engineers published a new engineering contract (NEC), NEC4 Suite of Contracts in this to facilitate better risk management through collaborative culture in construction projects. NEC aims to increase the chances of project success thought its flexible nature of contracts, 'simple' and 'clearly written' documents and provision for the incentive by adopting a better management approach. This paper focuses on traditional and NEC contracts to compare risk management and change management aspects. Through literature review and preliminary interviews with three industry professionals, the paper is exploring how a change in traditional contracts can recuperate from disaster. Our interviewees in this work have extensive experience in traditional as well as in NEC contracts. The results suggest a proactive risk management provisions in NEC contracts does make a difference to avoid later escalation of issues. Whereas, management of change helps streamline all identified issues through a structured process without going in mediation or litigation. NEC, with its new approach to collaborative working, allows partners to be vigilant, yet gratifying in the project process.

  • PDF

EXPLORING THE KEY FACTORS FOR BIM ACCEPTANCE IN CONSTRUCTION ORGANIZATIONS

  • Seul-Ki Lee;Jung-Ho Yu
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.14-20
    • /
    • 2013
  • Substantial research has been performed on the data standards and exchanges in the AEC/FM industry over the past several years. The growing popularity of BIM technology is based heavily upon a perception that the technology can facilitate the sharing and reuse of information during a project life-cycle. Although many researchers and practitioners are in agreement about the potential applicability and benefit of BIM in construction, it is still unclear why BIM is adopted, and what factors enhance implementation of BIM. Thus, BIM acceptance and use remains a central concern of BIM research and practice. Therefore, we propose the key factors affecting the acceptance of BIM in construction organizations using factor analysis. The key factors for BIM acceptance are identified through a literature review in TAM (Davis 1989) and related theories, and consolidated by interviews and pilot studies with professionals in construction industry. Based on the factors, a questionnaire was designed and sent out to construction organizations such as contractors, architects, and engineers in Korea. Total 148 completed questionnaires were retrieved. Using factor analysis, key factors were grouped into six dimensions. These findings will clarify what the highly prioritized factors are, and can also be used in an assessment tool for the performance of BIM utilization.

  • PDF

Accurate MATLAB Simulink PV System Simulator Based on a Two-Diode Model

  • Ishaque, Kashif;Salam, Zainal;Taheri, Hamed
    • Journal of Power Electronics
    • /
    • v.11 no.2
    • /
    • pp.179-187
    • /
    • 2011
  • This paper proposes a MATLAB Simulink simulator for photovoltaic (PV) systems. The main contribution of this work is the utilization of a two-diode model to represent a PV cell. This model is known to have better accuracy at low irradiance levels which allows for a more accurate prediction of PV system performance. To reduce computational time, the input parameters are reduced to four and the values of $R_p$ and $R_s$ are estimated by an efficient iteration method. Furthermore, all of the inputs to the simulator are information available on a standard PV module datasheet. The simulator supports large array simulations that can be interfaced with MPPT algorithms and power electronic converters. The accuracy of the simulator is verified by applying the model to five PV modules of different types (multi-crystalline, mono-crystalline, and thin-film) from various manufacturers. It is envisaged that the proposed work can be very useful for PV professionals who require a simple, fast and accurate PV simulator to design their systems.

A Study on the Analysis of SE Process Implementation for the Light Rail Transit Project (경량전철사업의 시스템엔지니어링 적용 실태분석 연구)

  • Kim, Chul Whan;Han, Myeung-Duk;Lee, Jae Hong
    • Journal of the Korean Society of Systems Engineering
    • /
    • v.8 no.2
    • /
    • pp.1-10
    • /
    • 2012
  • This paper aims to analyze the result of SE Process Implementation on Light Rail Transit(LRT) Project. Currently the Light Rail Transit Project of Korea applies SE to the intermediate phase, that is, E&M phase which is a manufacturing and designing procedure. More seriously, the application effect of SE is not remarkable because it applies to some specific engineering fields like RAMS and it depends on superficial consulting of foreign companies with low SE support capability and investment capital. This study points out that the "Requirement Analysis" and "System Alternative Review" has not been conducted from the initial phase (basic plan and basic design) of the LRT projects. Several projects indicate that the amount of investments for SE activities through the Korea LRT project is relatively very small in comparison with the global capital which is about 10% of total project budget. Furthermore, Korea LRT projects have very few SE professionals and weak SE organization with no government directions and guide book for the efficient implementation of SE for the LRT projects.