• Title/Summary/Keyword: Engineering Process Control(EPC)

Search Result 23, Processing Time 0.024 seconds

An Economic Design of the Integrated Process Control Procedure with Repeated Adjustments and EWMA Monitoring

  • Park Changsoon;Jeong Yoonjoon
    • Proceedings of the Korean Statistical Society Conference
    • /
    • 2004.11a
    • /
    • pp.179-184
    • /
    • 2004
  • Statistical process control (SPC) and engineering process control (EPC) are based on different strategies for process quality improvement. SPC reduces process variability by detecting and eliminating special causes of process variation, while EPC reduces process variability by adjusting compensatory variables to keep the quality variable close to target. Recently there has been need for an integrated process control (IPC) procedure which combines the two strategies. This article considers a scheme that simultaneously applies SPC and EPC techniques to reduce the variation of a process. The process disturbance model under consideration is an IMA(1,1) model with a location shift. The EPC part of the scheme adjusts the process, while the SPC part of the scheme detects the occurrence of a special cause. For adjusting the process repeated adjustment is applied by compensating the predicted deviation from target. For detecting special causes the two kinds of exponentially weighted moving average (EWMA) control chart are applied to the observed deviations: One for detecting location shift and the other for detecting increment of variability. It was assumed that the adjustment of the process under the presence of a special cause may change any of the process parameters as well as the system gain. The effectiveness of the IPC scheme is evaluated in the context of the average cost per unit time (ACU) during the operation of the scheme. One major objective of this article is to investigate the effects of the process parameters to the ACU. Another major objective is to give a practical guide for the efficient selection of the parameters of the two EWMA control charts.

  • PDF

An Investigative Study on EPC Theory Development (EPC 이론적 전개에 관한 조사연구)

  • 김종걸;정해운
    • Proceedings of the Korean Operations and Management Science Society Conference
    • /
    • 2000.04a
    • /
    • pp.349-356
    • /
    • 2000
  • EPC(Engineering process control) is usually applied to processes in which successive observations ate related over time and where the mean drifts dynamically. This paper aims to literature surrey concerned about EPC theory developments and their applications including macGregor model as Basic EPC model, feedback controllers, feedforward controllers, run-to-run controllers, MMSE controllers, PID model and PI adjustment model and so on. We suggest some perspective area for further study.

  • PDF

Economic Performance of an EWMA Chart for Monitoring MMSE-Controlled Processes

  • Lee, Jae-Heon;Yang, Wan-Youn
    • Journal of the Korean Data and Information Science Society
    • /
    • v.15 no.2
    • /
    • pp.285-295
    • /
    • 2004
  • Statistical process control(SPC) and engineering process control(EPC) are two complementary strategies for quality improvement. An integrated process control(IPC) can use EPC to reduce the effect of predictable quality variations and SPC to monitor the process for detection of special causes. In this paper we assume an IMA(1,1) model as a disturbance process and an occurrence of a level shift in the process, and we consider the economic performance for applying an EWMA chart to monitor MMSE-controlled processes. The numerical results suggest that the IPC scheme in an IMA(1,1) disturbance model does not give additional advantages in the economic aspect.

  • PDF

A Standard Method for Progress Measurement in a Petrochemical Plant EPC Project (석유화학 플랜트 EPC 사업의 진도율 산정표준의 제안)

  • Cho, Hong-Yeon;Yoo, Hoseon
    • Plant Journal
    • /
    • v.7 no.4
    • /
    • pp.77-87
    • /
    • 2011
  • In proportion to continuing growth of overseas plant market and the trend of its mega scale of the project, the importance of management is significantly emphasized for the successful execution of the project. And it is recognized that progress control is the most important management item amongst the others in the management. Progress control is importance of progress measurement for performance measurement and process control of project, but it is hardly obtainable securing the objectivity in the progress measurement since the progress measurement are being applied differently in accordance with the project conditions and the experience level of the person in charge for the progress control. This study has conducted as following to propose a standard method for progress measurement in a petrochemical plant protect. Domestic and overseas plant projects are investigated variously with the applied method of progress measurement, and the deduced problem of progress measurement. And then standard method for progress measurement of engineering, procurement, construction and commissioning has been proposed according to comparison and analysis of practices in domestic & overseas plant project, procedures for progress control in the globally reputed petrochemical client, company rules and recommendation of the expert in progress control.

  • PDF

Gradational Risk Management in Procurement Phase for Plant Projects (플랜트 프로젝트의 구매조달 단계별 리스크 분석에 관한 연구)

  • Na, Sung-Yub;Moon, Seung-Jae;Yoo, Hoseon
    • Plant Journal
    • /
    • v.5 no.3
    • /
    • pp.59-65
    • /
    • 2009
  • In the plant EPC project, the procurement work can be considered as the most important part that affects the success or failure of project as it has the closest mutual influence in every execution process of the project. Procurement takes up generally 60% ~ 70% of the entire project budget and the current trend of plant EPC project becoming larger in scale and a variety of process technology being applied. So, it is needed to identify the risks that are expected to occur according to the stages of procurement work, namely, proposal stage, manufacturer selection and purchasing agreement stage, expediting the process management of manufacturer stage, inspection stage and logistics & transportation stage. The management of observation and control of the risks should be performed with the response techniques which are 'avoid',' transfer'and' mitigate'.

  • PDF

Wafer Edge Profile Control for Improvement of Removal Uniformity in Oxide CMP (산화막CMP의 연마균일도 향상을 위한 웨이퍼의 에지형상제어)

  • Choi, Sung-Ha;Jeong, Ho-Bin;Park, Young-Bong;Lee, Ho-Jun;Kim, Hyoung-Jae;Jeong, Hae-Do
    • Journal of the Korean Society for Precision Engineering
    • /
    • v.29 no.3
    • /
    • pp.289-294
    • /
    • 2012
  • There are several indicators to represent characteristics of chemical mechanical planarization (CMP) such as material removal rate (MRR), surface quality and removal uniformity on a wafer surface. Especially, the removal uniformity on the wafer edge is one of the most important issues since it gives a significant impact on the yield of chip production on a wafer. Non-uniform removal rate at the wafer edge (edge effect) is mainly induced by a non-uniform pressure from nonuniform pad curvature during CMP process, resulting in edge exclusion which means the region that cannot be made to a chip. For this reason, authors tried to minimize the edge exclusion by using an edge profile control (EPC) ring. The EPC ring is equipped on the polishing head with the wafer to protect a wafer from the edge effect. Experimental results showed that the EPC ring could dramatically minimize the edge exclusion of the wafer. This study shows a possibility to improve the yield of chip production without special design changes of the CMP equipment.

Development of a Decision Making Model for Construction Management in LNG Plant Construction - Focused on Construction Stage - (LNG 공사의 건설사업관리 의사결정지원모델 개발 - 시공단계 중심 -)

  • Park, Hwan Pyo;Han, Jae Goo;Chin, Kyung Ho
    • Korean Journal of Construction Engineering and Management
    • /
    • v.15 no.3
    • /
    • pp.47-57
    • /
    • 2014
  • LNG plant projects tend to be implemented in overseas owing to its characteristics, so their project management scheme is somewhat different from those of general projects. Value chain in a LNG plant project includes exploration/production of gases, physical liquefaction/chemical conversion processes, transportation and storage. Key factors in the chain include liquefaction process (including ultra-low temperature liquefaction) to convert natural gas into liquid materials or fuel, and Front End Engineering Design (FEED) package, as well as Engineering, Procurement and Construction (EPC) technology comprising control, operation and construction. Success of a complex LNG plant project implemented in overseas depends on decision-making process in project management. Accordingly, to develop a decision-making model in of plant construction, the study extracted none factors in project management by EPC stage and assessed importance of each factor. The result showed that items in both project management and project risk management are important. Especially, the study developed a decision-making model in the construction stage of a LNG plant project based on the project management factors and importance assessment. The developed decision-making model would lay groundwork in building a decision-making system in construction stage of project management.

Vibration Characteristics of Compaction Table for Expendable Pattern Casting Process through Changing Vibration Modes (소실모형주조용 조형장치의 진동특성 평가)

  • Lee, Kang-Rae;Choe, Kyeong-Hwan;Cho, Gue-Serb;Lee, Kyong-Whoan;Kim, Myung-Ho;Rim, Kyung-Hwa;Kim, Ki-Young
    • Journal of Korea Foundry Society
    • /
    • v.24 no.5
    • /
    • pp.273-280
    • /
    • 2004
  • Vibrational motions of the compaction table were investigated to select the optimal operation conditions of sand filling and compaction for the EPC process. Their modes were measured at the nine points of the table with changing the relative rotation angles between the two eccentric mass vibrators which were attached parallel beneath the table. Well-defined vibration modes were measured at the center of the table but those of left and right sides of the table were distorted regardless of rotational angle differences. The distortion of vibration modes at both sides of the table were caused by the moment generated by offset positions of two eccentric masses. It was found that the uniform vibration modes would be gathered by controlling the relative distances between the rotating axis and the center of gravity in the compaction system at the various conditions of vibration modes and rotational angle differences.

Process Improvement in Feedback Adjustment

  • Lee, Jae-June;Kim, Yong-Hee
    • Communications for Statistical Applications and Methods
    • /
    • v.19 no.3
    • /
    • pp.395-403
    • /
    • 2012
  • Process adjustment, also called engineering process control(EPC), is applied to maintain process output close to a target value by manipulating controllable variables, but special causes may still make the process deviate from the target and result in significant costs. Thus, it is important to detect and mediate deviations as early as possible. We propose a one-step detection method, the moving search block(MSB), with which the time and type of a special cause can be identified in short periods. A modified control rule that can entertain the effects of the special cause is proposed. A numerical example is presented to evaluate the performance of the proposed scheme.

Risk Assessment on the Water BOT Business Participation in China : Domestic EPC Contractor's View (해외기업의 중국 수처리 BOT시장 참여 저해 위험요인 분석 : 국내 EPC 건설기업의 관점)

  • Choi, Jae-ho;Li, Shoushuang;Lee, Seungho
    • KSCE Journal of Civil and Environmental Engineering Research
    • /
    • v.28 no.5D
    • /
    • pp.695-703
    • /
    • 2008
  • China water market has huge potential for increased use of BOT mode and one of the most attractive markets of doing business. However, the current China water BOT market shows that many foreign companies are retreating from the market while Chinese water companies fast growing. From the view no domestic companies have track records in China BOT water market, the research identified twenty market access barriers in terms of construction laws, regulations, BOT-related policy and the recent market situation. These are evaluated based on interview results with 10 professionals direct or indirect having a China water BOT experience. All the factors are found to be highly influential to foreign company's decision on the market participation. Among those, no fixed return policy and low water price, difficulty in water price adjustment and approval, and no government guarantees, all directly related to the project viability and under the control of government, were the most critical factors, implying government's role is the key in increasing the market competition by attracting more foreign participation on the market. In addition, new construction law regulating foreign EPC contractor's construction work, namely Decree 113, and requirement of applying competitive bidding in selecting EPC contractor in a BOT project are also considered signigicant barriers on foreign participation, which contradicts international norm and therefore necessitates an adjustment on current decision process in domestic companies.