• Title/Summary/Keyword: Engineering Information Management

Search Result 10,144, Processing Time 0.047 seconds

A Study on Smart Factory Construction Method for Efficient Production Management in Sewing Industry

  • Kim, Jung-Cheol;Moon, Il-Young
    • Journal of information and communication convergence engineering
    • /
    • v.18 no.1
    • /
    • pp.61-68
    • /
    • 2020
  • In the era of the fourth industrial revolution, many production plants are gradually evolving into smart factories that apply information and communication technology to manufacturing, distribution, production, and quality management. The conversion from conventional factories to smart factories has resulted in the automation of production sites using the internet and the internet of things (IoT) technology. Thus, labor-intensive production can easily collect necessary information. However, implementing a smart factory required a significant amount of time, effort, and money. In particular, labor-intensive production industries are not automated, and productivity is determined by human skill. A representative industry of such industries is sewing the industry. In the sewing industry, wherein productivity is determined by the operator's skills. This study suggests that production performance, inventory management and product delivery of the sewing industries can be managed efficiently with existing production method by using smart buttons incorporating IoT functions, without using automated machinery.

Technological Innovation Capacity Evaluation And Technology Diffusion Analysis Using Patent Data (특허정보를 이용한 기술혁신능력 평가 및 기술 확산 분석)

  • Nam, Ki-Woong;Park, Sang-Sung;Shin, Young-Geun;Jang, Dong-Sik
    • Proceedings of the KAIS Fall Conference
    • /
    • 2009.05a
    • /
    • pp.319-324
    • /
    • 2009
  • Lately, knowledge-based society comes, it is important for enterprises to creatively utilize knowledge of technology for technological innovation. So, Technological innovation capacity of enterprises is important factor of business success. To improve technological innovation capacity, enterprises should well utilize their internal knowledges and external knowledges which come from technological diffusion. To well utilize external knowledges of enterprises they should well understand external knowledge flow. Especially knowledge flow also occurs frequently between nations, understanding of knowledge flow which occurs between nations is important to improve nation`s technological innovation capacity. So this paper presents comparison of technological innovation capacity and knowledge diffusion flow between nations.

  • PDF

Setting the New Trends for BIM in Construction: Productivity, Performance, Competitiveness, and Innovation

  • Wang, Xiangyu;Moon, Sungkon
    • International conference on construction engineering and project management
    • /
    • 2015.10a
    • /
    • pp.21-22
    • /
    • 2015
  • Productivity has been a wide-ranging challenge for the construction industry, both in Australia and globally. Particularly in Western Australia's construction and resources sectors, continuously low productivity will potentially discourage future investments. The emergence of the global marketplace necessitates that the supply chain needs to focus on the concept of the holistic efficiency. The isolated geographical position of Australia only exacerbates this phenomenon. In recent years, Building Information Modelling (BIM) has been suggested as an efficient way to help productivity improve and information management throughout supply chains. This keynote talk will focus on discussing ways of implementing BIM to enhance site productivity focusing on Western Australia's construction projects. It will show new trends of its applications to accomplish an innovative way in construction project management. The talk will also give an insightful summary of integrated methods with state-of-the-art technologies backboned by the BIM cases from construction and oil and gas industry projects.

  • PDF

A Study on the Requirement Information Management Model and Process Linked to Space Planning in the Early Design Stage

  • Jae Ho, Cho;Sang Woo, Kim;Bo Sik, Son;Jae Youl, Chun
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.566-569
    • /
    • 2013
  • The purpose of this research is to develop the technology to meet the requirements of the design content, and to build a 'Requirement Information Management Model' for the design project. The model that should be used in the early design stage will undergo the following process: First, basic requirements would be defined by extracting the design content in the form of a reusable library of space units. At the next stage, requirement information should be modified after considering unique characteristics for the project and conflict problems between function and performance.

  • PDF

A SYSTEMIZED APPLICATION METHOD OF RFID TECHNOLOGY FOR LOGISTICS IN BUILDING CONSTRUCTION PROJECTS

  • Koo, Do-Hyung;Yoon, Su-Won;Chin, Sangyoon;Kwon, Soon-Wook;Kim, Yea-Sang
    • International conference on construction engineering and project management
    • /
    • 2007.03a
    • /
    • pp.79-87
    • /
    • 2007
  • An effective logistics management is necessary for successful construction projects. So, prompt and precise logistics information collecting and management is needed, but there has been no systematic and effective method for this, Therefore, in this research, a standardized plan for RFID application in logistics management that could comprehend processes in building construction projects, was developed. With the 7 generalized process types that comprehend processes in construction projects, critical factors that should be considered for RFID applications were derived, and systematic and efficient application method for building projects were developed.

  • PDF

A study on the integrated data modeling for the plant design management system and the plant design system using relational database (관계형 데이터베이스를 이용한 PDMS/PDS의 통합 데이터 모델링에 관한 연구)

  • 양영태;김재균
    • Journal of Ocean Engineering and Technology
    • /
    • v.11 no.3
    • /
    • pp.200-211
    • /
    • 1997
  • Most recently, offshore Engineering & Construction field is concerned about integration management technology such as CIM(Computer Integrated Manufacturing), PDM(Product Data Management) and Enterprise Information Engineering in order to cope with the rapid change of engineering and manufacturer specification as per owner's requirement during construction stage of the project. System integration and integrated data modeling with relational database in integration management technology improve the quality of product and reduce the period of the construction project by reason of owing design information jointly. This paper represents the design methodology of system integration using Business Process Reengineering by the case study. The case study is about the offshore plant material information process from front end engineering design to detail engineering for the construction and the basis of monitoring system by integrating and sharing the design information between the 2D intelligent P&ID and 3D plant modeling using relational database. As a result of the integrated data modeling and system integration, it is possible to maintain the consistency of design process in point of view of the material balancing and reduce the design assumption/duration. Near future, this system will be expanded and connected with the MRP(Material Requirement Planing) and the POR (Purchase Order Requisition) system.

  • PDF

Organizational Transformation Strategies for Adopting Building Information Modeling in the Engineering-Construction Industry

  • Yong Han Ahn;Young Hoon Kwak;Sung Jun Suk
    • International conference on construction engineering and project management
    • /
    • 2013.01a
    • /
    • pp.94-102
    • /
    • 2013
  • The architecture, engineering and construction (AEC) industry is beginning to utilize Building Information Modeling (BIM), benefiting from the resulting improved visualization and productivity, better coordination of construction drawings, building documents that contain embedded links to virtual information, faster delivery, and lower costs. However, construction firms often face challenges when reorganizing their company structure to take full advantage of these benefits. This paper proposes an organizational structure that will enable engineering-construction firms to successfully adopt and implement BIM for major construction projects. A case study research method is utilized based on in-depth interviews with four BIM directors and vice presidents charged with BIM adoption, implementation and education. Organizational transformation challenges and recommendations are discussed in detail for those considering implementing BIM in the engineering-construction industry. Topics such as organizational changes in the firm, costs and benefits of BIM implementation, strategies of BIM implementation (execution) plan, BIM education, risks and opportunities associated with BIM, BIM software, contract methods, human resource management and new hires, and the future implementation and direction of BIM are discussed in detail.

  • PDF

Introduction of Program Life-Cycle Management System for Space Launch System Development (우주발사 시스템 개발을 위한 통합 기술관리 시스템 소개)

  • Jo, Mi-Ok;Jo, Cheol-Hun;Lee, Jun-Ho;O, Beom-Seok;Park, Jeong-Ju;Jo, Gwang-Rae
    • 시스템엔지니어링워크숍
    • /
    • s.4
    • /
    • pp.86-89
    • /
    • 2004
  • A web-based program life-cycle management(PLM) system is introduced to implement the system engineering processes and to provide the development teaceability online. This information system aims for the realization of essential system engineering management techniques currently applied to the space launch system development program including management of configuration and data based on the work breakdown structure(WBS), WBS, bill of materials and properties. The system enhances communication and gives access to the development data with relevant information such as data-to-data relation and approval status/history through the web, and preserve all of the development data throughout the program life-cycle. Further improvement of the system is planned to implement the program managrment pricesses and to provide integrated information useful for the programmatic decision making.

  • PDF

Distributed Mobility Management Strategy with Pointer Forwarding Technique

  • Wie, Sunghong;Jang, Jaeshin
    • Journal of information and communication convergence engineering
    • /
    • v.13 no.4
    • /
    • pp.248-256
    • /
    • 2015
  • With the dramatic increase in mobile traffic in recent years, some of the limitations of mobility management frameworks have magnified. The current centralized mobility management (CMM) strategy has various problems, such as a suboptimal routing path, low scalability, signaling overhead, and a single point of failure. To overcome these weaknesses in the CMM strategy, the Internet Engineering Task Force has been discussing distributed mobility management (DMM) strategies. The fundamental concept of a DMM strategy is to distribute the mobility anchors closer to the users. While the distribution of mobility anchors results in low-cost traffic delivery, it increases the signaling cost. To reduce this higher signaling cost, we propose a new DMM strategy applying the pointer forwarding technique. The proposed strategy keeps the existing tunnels and extends the traffic path as much as possible. In this paper, we analyze the performance of the pointer forwarding-DMM strategy and discuss its pros and cons.

AR-based 3D Digital Map Visualization Support Technology for Field Application of Smart Construction Technology

  • Song, Jinwoo;Hong, Jungtaek;Kwon, Soonwook
    • International conference on construction engineering and project management
    • /
    • 2022.06a
    • /
    • pp.1255-1255
    • /
    • 2022
  • Recently, research on digital twins to generate digital information and manage construction in real-time using advanced technology is being conducted actively. However, in the construction industry, it is difficult to optimize and apply digital technology in real-time due to the nature of the construction industry in which information is constantly fluctuating. In addition, inaccurate information on the topography of construction projects is a major challenge for earthmoving processes. In order to ultimately improve the cost-effectiveness of construction projects, both construction quality and productivity should be addressed through efficient construction information management in large-scale earthworks projects. Therefore, in this study, a 3D digital map-based AR site management work support system for higher efficiency and accuracy of site management was proposed by using unmanned aerial vehicles (UAV) in wide earthworks construction sites to generate point cloud data, building a 3D digital map through acquisition and analysis of on-site sensor-based information, and performing the visualization with AR at the site By utilizing the 3D digital map-based AR site management work support system proposed in this study, information is able to be provided quickly to field managers to enable an intuitive understanding of field conditions and immediate work processing, thereby reducing field management sluggishness and limitations of traditional information exchange systems. It is expected to contribute to the improvement of productivity by overcoming factors that decrease productivity in the construction industry and the improvement of work efficiency at construction sites.

  • PDF