• Title/Summary/Keyword: Engineering Construction

검색결과 24,068건 처리시간 0.042초

Practitioners' Perception on Relationship between Production Planning and Waste Occurrence in Construction Projects

  • Khanh, Ha Duy;Kim, Soo Yong
    • Journal of Construction Engineering and Project Management
    • /
    • 제4권3호
    • /
    • pp.1-12
    • /
    • 2014
  • Construction management has been suffering from many problems, which need to be solved or better understood. Most of construction projects have not achieved efficiency as expected. In this context, waste was also considered as a problem of efficiency decrease, and poor production planning was considered as a cause for waste. This study was conducted on the basis of waste concepts and production planning processes based on the philosophies of Lean Construction. A survey to find out the relationship between them was carried out through questionnaire, which was answered by experienced people in construction projects. The results have shown that frequency of wastes occurrence is quite high, and production planning processes are superficially performed in construction phase. There is a significant negative relationship between production planning and waste occurrence (r = -0.262). Weekly Work Plan (WWP) is the most dominant plan for waste control with seventeen in total of nineteen waste factors, and phase plan is the most dominant plan for two remaining waste factors. A case study was adopted to validate the relationship between production planning and waste occurrence. The results showed that the better the project was planned, the fewer the waste would occur on construction sites.

A STUDY ON THE LIFE CYCLE COST ANALYSIS IN LIGHT RAIL TRANSIT BRIDGES: FOCUSED ON SUPERSTRUCTURE

  • Lee Du-heon;Kim Kyoon-tai;Kim Hyun Bae;Jun Jin-taek;Han Choong-hee
    • 국제학술발표논문집
    • /
    • The 2th International Conference on Construction Engineering and Project Management
    • /
    • pp.30-40
    • /
    • 2007
  • The demand for light-rail construction projects has recently been increasing, and they are mostly supervised by private construction companies. Therefore, a private construction company that aim to raise gains from the operation of the facilities during the contract period greater than what they invested should b able to accurately calculate the costs from the aspect of Life Cycle Cost (LCC). In particular, a light-rail transit bridge that has a heavier portion from the aspect of the cost of light-rail transit construction requires a more accurate calculation method than the conventional LCC calculation method. For this, an LCC analysis model was developed and a cost breakdown structure was suggested based on literature review. The construction costs by shape of the upper part of a light-rail transit were calculated based on the cost breakdown system presented in this paper, and the cost generation cycle and cost unit price were collected and analyzed based on records on maintenance costs, rehabilitation and replacement. In addition, after forming some hypotheses in order to perform the LCC analysis, economic evaluation was conducted from the aspect of the LCC by using performance data by item.

  • PDF

EXPANDING THE GLOBAL CONSTRUCTION OPPORTUNITIES THROUGH BUSINESS CONVERGENCE

  • Soo-Sam Kim;Seung Heon Han
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.40-40
    • /
    • 2009
  • Construction firms have long sought success in the global construction market through diversifying revenue sources and project portfolios. The volume of international contracts has contributed to firms' sustained growth by mitigating the impact of the domestic market's cyclical nature. In spite of the importance of international construction, the uncertainty and dynamic changes surrounding global construction pose serious threats to global contactors. Over the last decade, the international construction industry has changed drastically in many ways, particularly including financial resource diversity, competition rules for the selection of contractors, and the terms of delivery systems requiring more competent total service providers. This paper investigates the important changes for global contractors through various documentation analysis as well as in-depth interviews with industry experts. This paper then analyzes the common strategies and lessons obtained from the cases of leading global contractors that have sustained their growth in the competitive global construction during the last decade. In addition, the authors further analyzed the comparisons between those firms and Korean contractors to discern any difference in sustaining their growth in the competitive market. It was found that those leading firms were quite proactive and responsive to changing markets by diversifying their market revenues to stabilize their revenue structure and enhancing their competency through a wide range of 'business convergence'. In addition, they significantly increased their upstream/downstream functional capabilities; hence becoming more competent service providers, able to grow in these rapidly changing market conditions. Finally, this paper benchmarks the critical strategies that support growth, which in turn can provide a strategic guideline for expansion into the global construction market.

  • PDF

BIM-BASED PLANNING OF TEMPORARY FACILITIES FOR CONCRETE CONSTRUCTION

  • Kyungki Kim;Jochen Teizer
    • 국제학술발표논문집
    • /
    • The 5th International Conference on Construction Engineering and Project Management
    • /
    • pp.1-6
    • /
    • 2013
  • Concrete construction requires utilization of many temporary facilities such as formwork, shoring, and scaffolding. Appropriate use of these temporary facilities greatly impacts the quality, cost, schedule, and safety of concrete construction. The current practice in design and planning of temporary facilities is often manual, error-prone, and re-active based on construction site layout, status, and progress in the field. Early design and planning of temporary facilities for concrete construction using Building Information Modeling (BIM) technology offers a potential solution. Although some commercially-available software exists that assists in the generation of temporary facility designs, the construction industry lacks tools that support detailed planning and design of many other temporary facilities. This research presents our early work in automating the design and planning of temporary facilities utilizing BIM. Algorithms were developed to automatically assess geometric conditions of work space to detect required temporary facilities and design them. The proposed methodology was implemented in a test model. By automatically incorporating temporary facilities into BIM, more realistic construction models can be created with less effort and errors. Temporary facilities-loaded models can finally be used for communication, bill of materials, scheduling, etc. and as a benchmark for field installation of temporary formwork, shoring, and scaffolding systems.

  • PDF

Development and Application of Failure-Based Learning Conceptual Model for Construction Education

  • Lee, Do-Yeop;Yoon, Cheol-Hwan;Park, Chan-Sik
    • Journal of Construction Engineering and Project Management
    • /
    • 제1권2호
    • /
    • pp.11-17
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning conceptual model.

DEVELOPMENT AND APPLICATION OF FAILURE-BASED LEARNING MODEL FOR CONSTRUCTION TECHNOLOGY EDUCATION

  • Do-Yeop Lee;Cheol-Hwan Yoon;Chan-Sik Park
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.99-106
    • /
    • 2011
  • Recent demands from construction industry have emphasized the capability for graduates to have improved skills both technical and non-technical such as problem solving, interpersonal communication. To satisfy these demands, problem-based learning that is an instructional method characterized by the use of real world problem has been adopted and has proven its effectiveness various disciplines. However, in spite of the importance of field senses and dealing with real problem, construction engineering education has generally focused on traditional lecture-oriented course. In order to improve limitations of current construction education and to satisfy recent demands from construction industry, this paper proposes a new educational approach that is Failure-Based Learning for using combination of the procedural characteristics of the problem-based learning theory in construction technology education utilizing failure information that has the educational value in the construction area by reinterpreting characteristics of construction industry and construction failure information. The major results of this study are summarized as follows. 1) Educational effect of problem-based learning methodology and limitation of application in construction area 2) The educational value of the information on construction failure and limitation in application of the information in construction sector 3) Anticipated effect from application of the failure-based learning 4) Development and application of the failure-based learning model

  • PDF

BRIEF HISTORY OF KOREA'S OVERSEAS CONSTRUCTION: LESSONS AND FUTURE STRATEGY

  • Jong-Hoon Kim
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.862-868
    • /
    • 2005
  • The history of Korea's overseas construction began in 1965, and the cumulative contract amount is about $180 billion over the last 40 years. During the period, Korea's overseas construction industry has played an important role for economic development. However, it seems that the industry is in a sea of trouble. Overseas construction orders have declined due to various reasons such as companies losing confidence, limited financing, lack of competitiveness, and so on. This paper addresses the brief history of Korea's overseas construction industry and the problems that the industry is facing. Then it suggests a few measures for the improvement of the industry.

  • PDF

KEY BARRIERS AND THEIR STRATEGIC RESPONSES TO ACTIVATE KNOWLEDGE SHARING IN CONSTRUCTION ORGANIZATIONS

  • Tae-Wan Kim ;Hyoun-Woo Joh
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.403-408
    • /
    • 2005
  • Being in a knowledge-based industry, many construction organizations are seeking to manage their own knowledge in an effective way. To manage knowledge, the organizations must motivate in-house people to share their knowledge. However, some barriers to knowledge sharing do exist and researches on these barriers considering construction organizations' characteristics seem rare. This study aims to identify key barriers to knowledge sharing considering the characteristics of construction organizations. Based on the identification, strategic responses to each key barrier are presented in two perspectives of technical and behavioral approach to activate knowledge sharing.

  • PDF

OFFICIAL DEVELOPMENT ASSISTANCE 'ODA' AND HUMAN RESOURCE DEVELOPMENT IN THE CONSTRUCTION INDUSTRY OF A DEVELOPING COUNTRY

  • Rajendra Niraula;Yoichi Hirota;Shunji Kusayanagi
    • 국제학술발표논문집
    • /
    • The 1th International Conference on Construction Engineering and Project Management
    • /
    • pp.956-961
    • /
    • 2005
  • Delay, cost overrun and inferior quality in public works are common in Nepal and Cambodia. Almost 90 percent of the civil construction engineers working in the industry were one-degree graduates without appropriate training. The civil engineering education had provided elemental engineering knowledge to the graduates however integrated engineering and management knowledge and skill are essential for efficient infrastructure development. ODA in developing countries had been concentrated in hard infrastructure development without improving the quality of higher education. Integrating ODA to engineering education system would help develop qualified technical manpower and appropriate technology domestically, and improve the efficiency in infrastructure development in developing countries.

  • PDF

TOP-MOUNTED IN-CORE INSTRUMENTATION : CURRENT STATUS AND TECHNICAL ISSUES

  • KIM, SUNG JUN;KANG, TAE KYO;CHO, YEON HO;CHANG, SANG GYOON;LEE, DAE HEE;MAENG, CHEOL SOO
    • 에너지공학
    • /
    • 제24권2호
    • /
    • pp.154-166
    • /
    • 2015
  • The in-core instrumentation measures core power distribution and coolant temperature in local regions of the core in pressurized water reactors. The installation types are distinguished by the designs of routing paths that exit either through reactor bottom mounted instrument nozzles or through reactor top mounted instrument nozzles. Although each type has unique advantages, it is generally known that top mounted design is more competitive with respect to emphasizing nuclear safety issues and ability to cope with severe accidents. The international nuclear vendors have provided various types of reactors with top mounted design. Nuclear power reactors in Korea, however, only have been designed to be applicable to the use of bottom mounted design, and it has been pointed out that the capabilities of Korean reactors against severe accidents should be further enhanced. The paper deals with technical issues on reactor internal and external design, in-core instrumentation, support assembly, sealing mechanism with nozzles, handling, and analytical issues in order to establish the ways of development.