CONFIGURATION METHOD OF HEALTH & SAFETY RULE FOR IMPROVING PRODUCTIVITY IN CONSTRUCTION SPACE BY MULTI-DIMENSION CAD SYSTEM

  • Hyoun-Seok Moon;Leen-Seok Kang;Nashwan Dawood;Sang-Bok, Ji
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1161-1165
    • /
    • 2009
  • Safety of workers and productivity in construction site are affected according to the conflict status of work spaces which are performed at a time. The interference among the work spaces in construction site should be minimized because it becomes a blocking factor that causes construction delay and low productivity. Those factors can be managed by reasonable H&S (Health & Safety) practice. This research suggests the requirements of H&S practice and rules to establish the strategy of H&S management based on the literature reviews related to H&S rule. The suggested H&S rule can be visualized for searching space conflict point if the rule is linked with visual simulation tool. Accordingly the research results can be used for improving and visualizing construction productivity by work space control in 4D/nD CAD system.

  • PDF

A STUDY ON THE SELECTION CRITERIA OF DELIVERY SYSTEM BY TYPES OF THE PUBLIC CONSTRUCTION PROJECTS

  • Eun-A Choi;Su-Man Choi;Jai-Dong Koo;Nam-Gi Lim;Sang-Beom Lee
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.1440-1445
    • /
    • 2009
  • Clients demands have been changed by construction circumstances such as high-technology, megaprojects, and the complexity of construction. Advanced foreign nations have already introduced and applied new project delivery systems (i.e, CM, DB, etc.) to deal with the change of such that. Korea has also promoted variation of the delivery systems for the progressive measure to the rapid changeable situation. Even though government has made his efforts as stated above, some clients have uniformly used those to public construction projects. That is because there are not selection criteria of project delivery system for clients. Therefore, this study presented the selection criteria of project delivery system based on project types in the public large construction projects. In addition, the study has verified the viability of the presented models through consultation with professionals and experts.

  • PDF

Modelling issues in the development of a simulation game for teaching construction management

  • Saad Al-Jibouri;Michael Mawdesley
    • 국제학술발표논문집
    • /
    • The 3th International Conference on Construction Engineering and Project Management
    • /
    • pp.774-780
    • /
    • 2009
  • Simulation is becoming increasingly popular in construction for training, planning and for assessment of projects. There are, however, significant problems inherent in simulating construction which are not common to other simulations. This paper describes the development and use of computer-based game for teaching and learning of some aspects of construction project management. It is concerned with the development of a model used to simulate the construction of a rock- and clay-fill dam. It includes detailed physical modelling of the performance of individual pieces of equipment and their interaction with the ground, the geography of the project and the weather in which the equipment operates. The behaviour of all of the individual pieces of equipment when acting as fleets is also discussed. The paper also describes the modelling issues of non-technical aspects of earthmoving operations. These include environmental impact, safety, quality and risks. The problems of integrating these with the physics-based models of the equipment performance are discussed. The paper also draws on real experience of using the game in classes in three universities in different countries.

  • PDF

The Status Quo of Graph Databases in Construction Research

  • Jeon, Kahyun;Lee, Ghang
    • 국제학술발표논문집
    • /
    • The 9th International Conference on Construction Engineering and Project Management
    • /
    • pp.800-807
    • /
    • 2022
  • This study aims to review the use of graph databases in construction research. Based on the diagnosis of the current research status, a future research direction is proposed. The use of graph databases in construction research has been increasing because of the efficiency in expressing complex relations between entities in construction big data. However, no study has been conducted to review systematically the status quo of graph databases. This study analyzes 42 papers in total that deployed a graph model and graph database in construction research, both quantitatively and qualitatively. A keyword analysis, topic modeling, and qualitative content analysis were conducted. The review identified the research topics, types of data sources that compose a graph, and the graph database application methods and algorithms. Although the current research is still in a nascent stage, the graph database research has great potential to develop into an advanced stage, fused with artificial intelligence (AI) in the future, based on the active usage trends this study revealed.

  • PDF

A Study on Client's Decision-Making in Construction Phase of Building Projects in Japan

  • Tamura, Atsushi;Kaneta, Takashi;Furusaka, Shuzo
    • 국제학술발표논문집
    • /
    • The 7th International Conference on Construction Engineering and Project Management Summit Forum on Sustainable Construction and Management
    • /
    • pp.183-191
    • /
    • 2017
  • In building project, client needs to decide many things, and clients cooperate with architects, supervisors, general contractors and other consultants. Especially in construction phase, clients often make a decision. However, client's decision-making in construction phase often makes some kinds of risk. This paper aims to clarify the reality of client's decision-making in construction phase. First, client's decision-making is defined by laws and standards. Second, the questionnaire revealed the current status of client's decision-making in 4 works. Third, Fishbone diagram shows the factors of client's decision-making in four works. Finally, it was modeled how client's decision-making in construction phase affects the post-process of 4 works.

  • PDF

Optimizing Construction Alternatives for Scheduling Repetitive Units

  • Park, Sang-Min;Lee, Dong-Eun
    • 국제학술발표논문집
    • /
    • The 6th International Conference on Construction Engineering and Project Management
    • /
    • pp.158-160
    • /
    • 2015
  • Efficient scheduling and resource management are the key factor to reduce construction project budget (e.g., labor cost, equipment cost, material cost, etc.). Resource-based line of balance (LOB) technique has been used to complement the limitations of existing time-driven scheduling techniques (e.g., critical-path method). Optimizing construction alternatives contributes to cost savings while honoring the project deadline. However, existing LOB scheduling is lack of identifying optimal resource combination. This study presents a method which identifies the optimal construction alternatives, hence achieving resource minimization in a repetitive construction by using genetic algorithm (GA). The method provides efficient planning tool that enhances the usability of the system.

  • PDF

CONSTRUCTION ERROR TYPES - THE EXECUTION STAGE OF DUBAI PROJECTS

  • Hamad Aljassmi;Sangwon Han
    • 국제학술발표논문집
    • /
    • The 4th International Conference on Construction Engineering and Project Management Organized by the University of New South Wales
    • /
    • pp.459-467
    • /
    • 2011
  • Construction errors can have significant effects on project performance. Yet, any attempt to tackle error should be driven by the ability to understand its archetypal nature. This study aims to analyze a variety of construction errors at the execution stage, in order to develop a comprehensive set of categories that shall provide insights about the effect of different error types on the industry. We investigate a database provided by an authoritative source, which includes a number of 256 construction errors that occurred in the year 2009 in Dubai construction industry. Results from this study reveal that the most common error arose from 'poor workmanship' which accounted for 21% of the total encountered faults. The next most common types arose from the 'usage of impaired materials', followed by the 'deviation from an intended dimension'. These observations infer that the majority of construction errors are driven by workers' lack of skill or competence. Moreover, it suggests that execution-oriented errors are the major cause of faults and accidents rather than design errors.

  • PDF

A new decision method for construction scheme of shallow buried subway station

  • Qiu, Daohong;Yu, Yuehao;Xue, Yiguo;Su, Maoxin;Zhou, Binghua;Gong, Huimin;Bai, Chenghao;Fu, Kang
    • Geomechanics and Engineering
    • /
    • 제30권3호
    • /
    • pp.313-324
    • /
    • 2022
  • With the development of the economy, people's utilization of underground space are also improved, and a large number of cities have begun to build subways to relieve traffic pressure. The choice of subway station construction method is crucial. If an inappropriate construction method is selected, it will not only waste costs but also cause excessive deformation that may also threaten construction safety. In this paper, a subway station construction scheme selects model based on the AHP-fuzzy comprehensive evaluation. The rationality of the model is verified using numerical simulation and monitoring measurement data. Firstly, considering the economy and safety, a comprehensive evaluation system is established by selecting several indicators. Then, the analytic hierarchy process is used to determine the weight of the evaluation index, and the dimensionless membership in the fuzzy comprehensive evaluation method is used to evaluate the advantages and disadvantages of the construction method. Finally, the method is applied to Liaoyang east road station of Qingdao metro Line 2, and the results are verified by numerical simulation and monitoring measurement data. The results show that the model is scientific, practical and applicable.

Assessment of Advanced Joining Technologies for Metal Pipe in the Construction Industry

  • 김창완
    • 한국건설관리학회논문집
    • /
    • 제5권2호
    • /
    • pp.81-89
    • /
    • 2004
  • Pipe joining is one of the most critical aspects of most industrial projects, but it is regarded as one of the most inefficient processes in the construction industry. The primary objective of this paper is to explore the applicability of advanced joining technology to the use of metal pipe in the construction industry. This paper begins with a review of current practices with respect to metal joining in the construction industry. The current status of pipe joining is examined. Needs for, and benefits of, advanced joining technology are identified, and a tool for evaluating the applicability of various methods to construction is presented. Joining technologies, including mechanical joining, adhesive bonding, welding, and welding automation, are then introduced, and their applicability to the construction industry is assessed by means of this evaluation tool. It is concluded that there is significant benefits for improvement of piping process in the construction industry through the use of advanced joining technologies.

Urban facility construction planning system using location-time information

  • Shin, Jaehyeon;Lee, Sang-Joon;Kwak, Ho-Young
    • 한국컴퓨터정보학회논문지
    • /
    • 제24권1호
    • /
    • pp.187-195
    • /
    • 2019
  • In this paper, a shared model of systematic urban facility construction planning system is proposed. As the scope of construction on urban facilities has expanded, the construction process may occur simultaneously in the same location and short period of time by the different public agencies. This kind of construction duplications may cause the inefficiency of construction time and cost. In order to improve this, we studied the sharing method of the construction information which are produced by the different construction agencies. And also studied the method of find out the duplicate constructions occurring in the same place and short period of time. And Then we suggest a system that can rearrange the order of urban facility construction.