Design and Construction of very deep diaphragm wall by the method of end concrete hardening with crushed stone pouring (선단고결 쇄석 투입 공법에 의한 초대심도 지중연속벽의 설계 및 시공)
-
- Proceedings of the Korean Geotechical Society Conference
- /
- 1997.10a
- /
- pp.203-210
- /
- 1997