• Title/Summary/Keyword: Emergency Power Generation

Search Result 80, Processing Time 0.023 seconds

A Buoyant Combined Solar-Wave Power Generation and Its Application for Emergency Power Supply of Nuclear Power Plant (부유식 태양광-파력 복합발전 개념 및 원자력발전소 비상전원을 위한 응용)

  • Cha, Kyung-Ho;Kim, Jung-Taek
    • New & Renewable Energy
    • /
    • v.7 no.4
    • /
    • pp.37-41
    • /
    • 2011
  • This paper presents a Combined solar-wave Power Generation (CPG) concept that the CPG unit is maintained as buoyant at the level of sea water and it is also supported by a submerged tunnel, with the aim of supplying emergency electric power during the station blackout events of nuclear power plants. The CPG concept has been motivated from the 2011 Fukushima-Daiichi Accidents due to the loss of both offsite AC power and emergency diesel power caused by natural hazards such as earthquake and tsunami. The CPG is conceptualized by applying different types and different sites for emergency power generation, in order to reduce common cause failures of emergency power suppliers due to natural hazards. Thus, the CPG can provide a new mean for supplying emergency electric power during station blackout events of nuclear power plants. For this application, the CPG requirements are described with a typical configuration at the ocean side of a submerged tunnel.

Development of Hybrid Power Storage System for Urban Railway with UPS Function for Emergency Power Generation (비상발전용 UPS 기능을 갖춘 도시철도용 복합형 전력저장시스템 개발)

  • Hong, Kyungjin
    • The Journal of the Institute of Internet, Broadcasting and Communication
    • /
    • v.19 no.6
    • /
    • pp.191-196
    • /
    • 2019
  • In the case of urban railway facilities, the power supply should be maintained for the safe movement of passengers in communication facilities, disaster prevention facilities and boarding area security because of the confusion when power supply is cut off due to the nature of public transportation. In addition, considering that the number of trains is running on the urban railway line, it is necessary to operate at least 30 minutes for the bus stop and at least 1 hour for the communication and disaster prevention facilities. Therefore, it is essential to supply emergency power source to maintain stable operation of induction lamp and smoke exhaust system because main power is cut off in order to prevent further spread due to fire in case of the history of urban railway section or vehicle fires. Recently, UPS(Uninterruptible Power Supply) function to prevent power outage in emergency, emergency power generation combined with ESS function which saves electricity at nighttime price time, A hybrid power storage system with a UPS function.

Preventive and Emergency Control of Power System for Transient Stability Enhancement

  • Siddiqui, Shahbaz A.;Verma, Kusum;Niazi, K.R.;Fozdar, Manoj
    • Journal of Electrical Engineering and Technology
    • /
    • v.10 no.1
    • /
    • pp.83-91
    • /
    • 2015
  • This paper presents preventive and emergency control measures for on line transient stability (security) enhancement. For insecure operating state, generation rescheduling based on a real power generation shift factor (RPGSF) is proposed as a preventive control measure to bring the system back to secure operating state. For emergency operating state, two emergency control strategies namely generator shedding and load shedding have been developed. The proposed emergency control strategies are based on voltage magnitudes and rotor trajectories data available through Phasor Measurement Units (PMUs) installed in the systems. The effectiveness of the proposed approach has been investigated on IEEE-39 bus test system under different contingency and fault conditions and application results are presented.

Development of Operation Scenarios by HILS for the Energy Storage System Operated with Renewable Energy Source (HILS를 이용한 신재생 에너지원이 포함된 에너지 저장시스템의 운영 시나리오 개발)

  • Shin, Dong-Cheol;Jeon, Jee-Hwan;Park, Sung-Jin;Lee, Dong-Myung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.67 no.2
    • /
    • pp.224-232
    • /
    • 2018
  • According to government policy, renewable energy facility such as solar power generation is being implemented for newly constructed buildings. In recent years, the introduction of Energy Storage System (ESS) served as an emergency power for replacing an existing diesel generator has been increasing. Furthermore, in order to expand the efficacy of the ESS operation, operation in combination with renewable energy sources such as solar and wind power generation is increasing. Hence, development of the ESS operation algorithms for emergency mode as well as the peak power cut mode, which is the essential feature of ESS, are necessary. The operational scenarios of ESS need to consider load power requirement and the amount of the power generation by renewable energy sources. For the verification of the developed scenarios, tests under the actual situation are demanded, but there is a difficulty in simulating the emergency operation situation such as system failure in the actual site. Therefore, this paper proposes simulation models for the HILS(Hardware In the Loop Simulation) and operation modes developed through HILS for the ESS operated with renewable energy source under peak power reduction and emergency modes. The paper shows that the ESS operation scenarios developed through HILS work properly at the actual site, and it verifies the effectiveness of the control logic developed by the HILS.

An Economic Analysis on Dual-fuel Engine Generation for Peak Load (피크부하용 혼소엔진발전의 경제성 분석)

  • Lee, Ok-Bae;Ahn, Jae-Kyoung
    • The Transactions of The Korean Institute of Electrical Engineers
    • /
    • v.61 no.9
    • /
    • pp.1260-1268
    • /
    • 2012
  • Recently, lack of power reserve margin was observed quite often. In this paper, we studied the method to secure power source for a short time, to cut the utility power peak load, and to reduce the users electricity bills. Emergency diesel generator of an office building is to be converted into a dual-fuel engine generator which is responsible for a portion of the peak load. Compared to the conventional diesel fuel generator, the proposed dual-fuel engine is able to reduce the generation power cost by dual-fuel combustion, and it also mitigates the building's utility power peak load by charging the building's peak load. If the dead resources (a group of emergency dual-fuel engine generators), as a Virtual Power Plant, are operating in peak time, we can significantly reduce future large power development costs. We investigated the current general purpose electricity bills as well as the records of the building electric power usage, and calculated diesel engine generator renovation costs, generation fuel costs, driving conditions, and savings in electricity bills. The proposed dual-fuel engine generation method reduces 18.1% of utility power peak load, and turned out to be highly attractive investment alternative which shows more than 27% of IRR, 76 million won of NPV, and 20~53 months of payback periods. The results of this study are expected to be useful to developing the policy & strategy of the energy department.

Analysis on Emergency Power Supplies in Buildings and a Model for Safe Operation of the Emergency Power System (건축물의 비상전원 적용실태 및 자가발전설비의 안전 운전 모델에 관한 연구)

  • Lee, Won-Kang;Choi, Chung-Seog
    • Journal of the Korean Society of Safety
    • /
    • v.27 no.3
    • /
    • pp.49-56
    • /
    • 2012
  • The purpose of this paper is to present a model for operating an emergency power system(EPS) that can secure a sufficient power supply used in case of a fire by analyzing the status of power supplies for emergency and firefighting operations. Investigations on the one of the causes of the operational failure of firefighting systems show evidence of EPS. Generally, when power to a building is interrupted, EPS supplies the emergency load(excepted firefighting load) first. When a power outage and a fire occur simultaneously, the EPS must be able to supply both the emergency load and the firefighting load, especially the firefighting load to the end. However, in order to save construction costs, emergency power generators in apartment, commercial, and business buildings can satisfy only one of the required loads. In cases like this, when a power outage and a fire occur simultaneously, there is a danger of firefighting equipment not operating due to insufficient power supply from the emergency generator. Therefore, an EPS must have a reserved firefighting power that can supply both the firefighting and the emergency load. Such EPS, when faced with a danger of an overload, will shut down the supply to all or part of the emergency load, thus securing a continuous power supply to the firefighting equipment. The generator power system with reserved firefighting power (RFP) will also have an indicator to show that the selective control is being used. General power generation systems for emergency load and firefighting load were found to have a demand factor of 50-60% with a lump. However, when installing an EPS, the builders must choose the higher demand factor suggested according to the official approval demand factor of the building.

PSPICE Modeling of Solar Cells for Use in Emergency Power System (비상발전용 전원으로 사용하기 위한 태양전지의 PSPICE 모델링)

  • Baek, Dong-Hyun;Song, Ho-Bin
    • Fire Science and Engineering
    • /
    • v.24 no.2
    • /
    • pp.52-57
    • /
    • 2010
  • Power supply to the motor using the emergency power system is being used. However, this system is rarely used except during emergency power is not inefficient. On the other hand, the use of solar power systems Emergency backup power supply as well as in normal maintenance savings, as many have benefits. In this paper, general-purpose simulator PSPICE simulations performed using the PV system to be used in the various models made by the library. In addition, for use as an emergency power generation solar power system design, modeling and analysis of the characteristics and practical use make an effective device was confirmed.

Feasibility study for the self powered wireless emergency call button using electromagnetic energy harvesting mechanism (전자기유도방식의 에너지 하베스팅을 이용한 자가발전 무선 비상호출기 구현 연구)

  • Kim, Il-Jung;Choi, Yeon-Suk
    • Journal of the Korea Safety Management & Science
    • /
    • v.16 no.2
    • /
    • pp.111-119
    • /
    • 2014
  • This paper describes the design and implementation of a electromagnetic energy harvesting mechanism and electronic circuit for autonomous emergency call system. This analysis results show the power output of the proposed harvesting mechanism and circuit up to max power output 5V and it can hold up to 65 msec of the power generation and 10msec of the RF transmission. Based on the these testing results, the implementation of autonomous emergency call device without battery power or any external power source is feasible.

Direct Load Control Scheme for Congestion Problems in Power System Emergency (비상시 선로혼잡 해결을 위한 직접부하제어)

  • Shin, Ho-Sung;Kim, Byoung-Su;Song, Kyung-Bin;Kim, Jae-Chul;Lee, Hak-Ju;Kwon, Seong-Chul
    • Proceedings of the Korean Institute of IIIuminating and Electrical Installation Engineers Conference
    • /
    • 2005.05a
    • /
    • pp.307-310
    • /
    • 2005
  • Most of the electric power in the power system of South Korea is flowing from the south area to the north area, Seoul, in the capital of South Korea. Almost of the needs of the electric power in the capital area are about 43% of the total loads and generation plants are mainly located in the south area of South Korea. As mentioned the earlier characteristic, transmission congestion is one of the important research issues. Because of the limits of the power flows from the south to the north which are anticipated to be increased more and more in the future, these congestion situations may cause a serious voltage stability problem in emergency of the power system. Accordingly, we are interested in an interruptible load control program so as to solve this problem in emergency. This problem can be solved by an interruptible load management in emergency, however, the systematic and effective mechanism has not been presented yet. In this paper, the algorithm of interruptible load management plan using the line sensitivity to the loads for the transmission congestion management in emergency is presented. The proposed method is applied to 6-Bus sample system and their results are presented.

  • PDF

A Study on Lighting Emergency Lamp using Photovoltaic Generation System (태양광발전시스템을 이용한 유도등용 헝광램프의 점등에 관한 연구)

  • 이상집;성낙규;이승환;오봉환;백동현;이훈구;한경희
    • Fire Science and Engineering
    • /
    • v.14 no.1
    • /
    • pp.22-26
    • /
    • 2000
  • Emergency lamp is installation usage on an emergency situation or firing. It's an offer at least of brightness. It's lighting to common source usually. It's transferred to reserve battery on power stoppage. This emergency lamp is lighted from solar cell system. The solar cell should be operated at the maximum power point. This paper proposes the new control method that half-bridge inverter using the solar cell can operate emergency lamp.

  • PDF